Eray Cakici
Eray Cakici has a total of 10 co-authors. Here are the top co-authors by number of shared publications:
- Scott J. Mason
Department of Industrial Engineering, Clemson University, Clemson, SC, USA
3 shared publications H. Neil Geismar
Texas A&M University
2 shared publicationsJohn W. Fowler
Arizona State University
2 shared publicationsAbraham J. Lachowsky
1 shared publicationC. Richard Cassady
1 shared publicationJun Jia
1 shared publication
Latest Publications
- 30 May 2014
- Published by Springer Nature in Journal of Heuristics
- Vol. 20 (5) , 511-537
Scheduling parallel machines with single vehicle delivery
- 30 May 2014
- Published by Springer Nature in Journal of Heuristics
- Vol. 20 (5) , 511-537
Scheduling parallel machines with single vehicle delivery
- 3 January 2013
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 51 (8) , 2462-2477
Batch scheduling on parallel machines with dynamic job arrivals and incompatible job families
We study the scheduling problem of minimising weighted completion times on parallel identical batching machines with dynamic job arrivals and incompatible job families. Each job is associated with a family, weight (priority), release time, and size. Batching machines can process simultaneously up to a specified total size of the jobs of a particular family. The scheduling problem can be represented by . We present a mathematical model and heuristic algorithms employing different local search procedures individually and sequentially under a variable neighbourhood search scheme. We have shown that among local searches, repositioning the batches instead of jobs yields better results. The best-performing heuristic algorithm is capable of generating solutions within 0.6% of the best overall heuristic solution for each instance in a reasonable amount of time. When this heuristic is compared against the mathematical model, solutions that are 3.7% above optimal on average in the 15-job problem instances are possible.
- 3 January 2013
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 51 (8) , 2462-2477
Batch scheduling on parallel machines with dynamic job arrivals and incompatible job families
We study the scheduling problem of minimising weighted completion times on parallel identical batching machines with dynamic job arrivals and incompatible job families. Each job is associated with a family, weight (priority), release time, and size. Batching machines can process simultaneously up to a specified total size of the jobs of a particular family. The scheduling problem can be represented by . We present a mathematical model and heuristic algorithms employing different local search procedures individually and sequentially under a variable neighbourhood search scheme. We have shown that among local searches, repositioning the batches instead of jobs yields better results. The best-performing heuristic algorithm is capable of generating solutions within 0.6% of the best overall heuristic solution for each instance in a reasonable amount of time. When this heuristic is compared against the mathematical model, solutions that are 3.7% above optimal on average in the 15-job problem instances are possible.
- 15 May 2012
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 50 (10) , 2624-2638
Multi-objective analysis of an integrated supply chain scheduling problem
We study the problem of minimising the total weighted tardiness and total distribution costs in an integrated production and distribution environment. Orders are received by a manufacturer, processed on a single production line, and delivered to customers by capacitated vehicles. Each order (job) is associated with a customer, weight (priority), processing time, due time, and size (volume or storage space required in the transportation unit). A mathematical model is presented in which a number of weighted linear combinations of the objectives are used to aggregate both objectives into a single objective. Because even the single objective problem is NP-hard, different heuristics based on a genetic algorithm (GA) are developed to further approximate a Pareto-optimal set of solutions for our multi-objective problem.
- 15 May 2012
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 50 (10) , 2624-2638
Multi-objective analysis of an integrated supply chain scheduling problem
We study the problem of minimising the total weighted tardiness and total distribution costs in an integrated production and distribution environment. Orders are received by a manufacturer, processed on a single production line, and delivered to customers by capacitated vehicles. Each order (job) is associated with a customer, weight (priority), processing time, due time, and size (volume or storage space required in the transportation unit). A mathematical model is presented in which a number of weighted linear combinations of the objectives are used to aggregate both objectives into a single objective. Because even the single objective problem is NP-hard, different heuristics based on a genetic algorithm (GA) are developed to further approximate a Pareto-optimal set of solutions for our multi-objective problem.
- 1 December 2006
- Published by Taylor & Francis in Journal of Wine Research
- Vol. 17 (3) , 145-160
Cellar Tank Piping Network Analysis at E. & J. Gallo Winery
- 1 December 2006
- Published by Taylor & Francis in Journal of Wine Research
- Vol. 17 (3) , 145-160
Cellar Tank Piping Network Analysis at E. & J. Gallo Winery