Morgane Boulestreau
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Morgane Boulestreau has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
Eric Hoa
Berlin Centre of Competence for Water (KWB) , Cicerost. 24, 10709, Berlin , Germany Phone: Tel. +49 30 53653 811 Fax: Tel. +49 30 53653 811
2 shared publicationsMaryna Peter-Verbanets
Eawag, Swiss Federal Institute of Aquatic Science and Technology , Überlandstr. 133, 8600 , Dübendorf , Switzerland
2 shared publicationsRachi Rajagopaul
Umgeni water , 251 Wiggins Rd, Durban , South Africa
2 shared publicationsBaris Lesjean
Berlin Centre of Competence for Water (KWB) , Cicerost. 24, 10709 , Berlin , Germany Phone: Tel. +49 30 53653 811 Fax: Tel. +49 30 53653 811
1 shared publicationBoris Lesjean
Berlin Centre of Competence for Water (KWB) , Cicerost. 24, 10709, Berlin , Germany Phone: Tel. +49 30 53653 811 Fax: Tel. +49 30 53653 811
1 shared publicationWorrtes Pronk
Eawag, Swiss Federal Institute of Aquatic Science and Technology , Überlandstr. 133, 8600 , Dübendorf , Switzerland
1 shared publication
Latest Publications
- Open Access
- 1 October 2012
- Published by Elsevier in Desalination and Water Treatment
- Vol. 48 (1-3) , 404
Erratum to Operation of gravity-driven ultra filtration prototype for decentralised water supply [Desalination and Water Treatment, Volume 42 (2012) 125–130]
- 1 October 2012
- Published by Elsevier in Desalination and Water Treatment
- Vol. 48 (1-3) , 404
Open AccessErratum to Operation of gravity-driven ultra filtration prototype for decentralised water supply [Desalination and Water Treatment, Volume 42 (2012) 125–130]
- 11 April 2012
- Published by Elsevier in Desalination and Water Treatment
- Vol. 42 (1-3) , 125-130
Operation of gravity-driven ultrafiltration prototype for decentralised water supply
The study aims at assessing in long-term trials a gravity-driven ultrafiltration pilot plant designed for a capacity of 5 m3 d−1. The unit was operated in South Africa with Ogunjini surface water and was run with restricted chemical intervention or maintenance (no backflush, no aeration, no crossflow and no chemical). Under South African environmental conditions and with direct filtration of the river water and only one manual drainage of the membrane reactor every weekday, the unit could fulfil the design specification in terms of water production (5 m3 d−1) as long as the turbidity of the raw water remained in a reasonable level (up to 160 NTU), with a filtration flux typically 4–6 l h m−2 (corrected at 20°C). This value was in the same range as the lab results and was consistent with the first phase results (around 5–7 l h−1 m−2 after biosand filtration). However, the flux dropped significantly to a range of 2–4 l h−1 m−2 after a rain event resulting in a turbidity peak over several days up to >600 NTU. This demonstrated that for variable raw water types with expected turbidity peaks above 100 NTU, a pre-treatment would be required for the system (biosand filter or other). The performance of microbiological tests confirmed the integrity of the membrane and the ability of the system to achieve advanced disinfection.
- 11 April 2012
- Published by Elsevier in Desalination and Water Treatment
- Vol. 42 (1-3) , 125-130
Operation of gravity-driven ultrafiltration prototype for decentralised water supply
The study aims at assessing in long-term trials a gravity-driven ultrafiltration pilot plant designed for a capacity of 5 m3 d−1. The unit was operated in South Africa with Ogunjini surface water and was run with restricted chemical intervention or maintenance (no backflush, no aeration, no crossflow and no chemical). Under South African environmental conditions and with direct filtration of the river water and only one manual drainage of the membrane reactor every weekday, the unit could fulfil the design specification in terms of water production (5 m3 d−1) as long as the turbidity of the raw water remained in a reasonable level (up to 160 NTU), with a filtration flux typically 4–6 l h m−2 (corrected at 20°C). This value was in the same range as the lab results and was consistent with the first phase results (around 5–7 l h−1 m−2 after biosand filtration). However, the flux dropped significantly to a range of 2–4 l h−1 m−2 after a rain event resulting in a turbidity peak over several days up to >600 NTU. This demonstrated that for variable raw water types with expected turbidity peaks above 100 NTU, a pre-treatment would be required for the system (biosand filter or other). The performance of microbiological tests confirmed the integrity of the membrane and the ability of the system to achieve advanced disinfection.