Yusuke Suetsugu
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Yusuke Suetsugu has a total of 90 co-authors. Here are the top co-authors by number of shared publications:
K. Shibata
KEK, Oho, Tsukuba, Ibaraki 305-0801, Japan
11 shared publicationsK. Kanazawa
KEK, Oho, Tsukuba, Ibaraki 305-0801, Japan
9 shared publicationsH. Hisamatsu
KEK, Oho, Tsukuba, Ibaraki 305-0801, Japan
8 shared publicationsM. Shirai
KEK, Oho, Tsukuba, Ibaraki 305-0801, Japan
8 shared publications- Takuya Ishibashi
High Energy Accelerator Research Organization (KEK)
7 shared publications - Shinji Terui
High Energy Accelerator Research Organization (KEK)
6 shared publications
Latest Publications
- Open Access
- 20 June 2024
- Published by American Physical Society (APS) in Physical Review Accelerators and Beams
- Vol. 27 (6) , 063201
Machine-learning-based pressure-anomaly detection system for SuperKEKB accelerator
This study developed a pressure-anomaly detection system utilizing machine learning for the vacuum system of the SuperKEKB accelerator. The system identified abnormal pressure behaviors among approximately 600 vacuum gauges before triggering the conventional alarm system, facilitating the early implementation of countermeasures and minimizing potential vacuum issues. By comparing the recent pressure behaviors of each vacuum gauge with the previous behaviors, the program detected anomalies using the decision boundary of a feed-forward neural network previously trained on actual abnormal behaviors. Realistic regression models for pressure data curves enabled a reasonable prediction of the causes of anomalies. The program, implemented in python, has been operational since April 2024. Although based on a rudimentary machine-learning concept, the developed anomaly detection system is beneficial for ensuring the stable operation of large-scale machines, including accelerators, and is helpful in designing systems for fault detection. Published by the American Physical Society 2024
- 20 June 2024
- Published by American Physical Society (APS) in Physical Review Accelerators and Beams
- Vol. 27 (6) , 063201
Open AccessMachine-learning-based pressure-anomaly detection system for SuperKEKB accelerator
This study developed a pressure-anomaly detection system utilizing machine learning for the vacuum system of the SuperKEKB accelerator. The system identified abnormal pressure behaviors among approximately 600 vacuum gauges before triggering the conventional alarm system, facilitating the early implementation of countermeasures and minimizing potential vacuum issues. By comparing the recent pressure behaviors of each vacuum gauge with the previous behaviors, the program detected anomalies using the decision boundary of a feed-forward neural network previously trained on actual abnormal behaviors. Realistic regression models for pressure data curves enabled a reasonable prediction of the causes of anomalies. The program, implemented in python, has been operational since April 2024. Although based on a rudimentary machine-learning concept, the developed anomaly detection system is beneficial for ensuring the stable operation of large-scale machines, including accelerators, and is helpful in designing systems for fault detection. Published by the American Physical Society 2024
- Open Access
- 4 January 2023
- Published by American Physical Society (APS) in Physical Review Accelerators and Beams
- Vol. 26 (1) , 013201
SuperKEKB vacuum system operation in the last 6 years operation
The operation of the SuperKEKB has been ongoing since 2016. The vacuum systems of the main ring (MR) which consists of a 7-GeV electron ring (HER) and a 4-GeV positron ring (LER), the damping ring (DR) for 1.1 GeV positrons in the middle of the injector linac have been working well as a whole. As of June 2022, the maximum stored beam currents of MR are 1.46 and 1.14 A for the LER and the HER, respectively, and approximately 30 mA for the DR. The pressure increase per unit beam current is steadily decreasing and the new vacuum components developed for the SuperKEKB have been working as expected. No significant electron cloud effect has been observed in the LER after installing solenoids in drift spaces in 2017 which apply magnetic fields in the beam direction. The recent pressure behavior of the LER with increased beam current is explained by considering thermal gas desorption induced by the beam as well as photon-stimulated gas desorption. Currently, the beam lifetime is primarily limited by the Touschek effect rather than the vacuum pressure, and their degrees of contribution are evaluated. The challenges associated with high beam currents, such as damage to beam-collimator heads and excess heating of beam pipes at wiggler sections have become more apparent as beam currents are increased. The status of the SuperKEKB vacuum system and the experiences during the past 6 years of operation are presented here.
- 4 January 2023
- Published by American Physical Society (APS) in Physical Review Accelerators and Beams
- Vol. 26 (1) , 013201
Open AccessSuperKEKB vacuum system operation in the last 6 years operation
The operation of the SuperKEKB has been ongoing since 2016. The vacuum systems of the main ring (MR) which consists of a 7-GeV electron ring (HER) and a 4-GeV positron ring (LER), the damping ring (DR) for 1.1 GeV positrons in the middle of the injector linac have been working well as a whole. As of June 2022, the maximum stored beam currents of MR are 1.46 and 1.14 A for the LER and the HER, respectively, and approximately 30 mA for the DR. The pressure increase per unit beam current is steadily decreasing and the new vacuum components developed for the SuperKEKB have been working as expected. No significant electron cloud effect has been observed in the LER after installing solenoids in drift spaces in 2017 which apply magnetic fields in the beam direction. The recent pressure behavior of the LER with increased beam current is explained by considering thermal gas desorption induced by the beam as well as photon-stimulated gas desorption. Currently, the beam lifetime is primarily limited by the Touschek effect rather than the vacuum pressure, and their degrees of contribution are evaluated. The challenges associated with high beam currents, such as damage to beam-collimator heads and excess heating of beam pipes at wiggler sections have become more apparent as beam currents are increased. The status of the SuperKEKB vacuum system and the experiences during the past 6 years of operation are presented here.
- Open Access
- 1 February 2019
- Published by American Physical Society (APS) in Physical Review Accelerators and Beams
- Vol. 22 (2) , 023201
Mitigating the electron cloud effect in the SuperKEKB positron ring
SuperKEKB is an electron-positron collider with asymmetric energies located at the High Energy Accelerator Research Organization (KEK) in Tsukuba, Japan. After more than five years of upgrading work on KEKB, phase-1 commissioning commenced in February 2016 and ended in June of the same year. Following a 20-month shutdown for the installation of a particle detector, BELLE II, phase-2 commissioning commenced in March 2018 and ended in July of the same year. This paper describes one major issue faced by SuperKEKB: the electron cloud effect (ECE) in the positron ring, which was observed during phase-1 commissioning. In the high-beam-current region, electron clouds, i.e., the source of the ECE, existed in the beam pipes at drift spaces of the ring, which had antechambers and a titanium nitride (TiN) film coating as countermeasures against the ECE. Permanent magnets and solenoids used to generate magnetic fields in the beam direction were attached to the beam pipes as additional countermeasures before the next commissioning phase commenced. Consequently, during phase-2 commissioning, experiments showed that the threshold of the current linear density for exciting the ECE increased by a factor of at least 2 compared to that during phase-1 commissioning. While the countermeasures were strengthened, the effectiveness of the antechambers and TiN film coating of the real beam pipe was reevaluated. Through various simulations and dedicated experiments during phase-2 commissioning, the antechambers were found to be less effective than anticipated with regard to reducing the number of photoelectrons in the beam channel. In contrast, the TiN film coating had a low secondary electron yield, as expected.
- 1 February 2019
- Published by American Physical Society (APS) in Physical Review Accelerators and Beams
- Vol. 22 (2) , 023201
Open AccessMitigating the electron cloud effect in the SuperKEKB positron ring
SuperKEKB is an electron-positron collider with asymmetric energies located at the High Energy Accelerator Research Organization (KEK) in Tsukuba, Japan. After more than five years of upgrading work on KEKB, phase-1 commissioning commenced in February 2016 and ended in June of the same year. Following a 20-month shutdown for the installation of a particle detector, BELLE II, phase-2 commissioning commenced in March 2018 and ended in July of the same year. This paper describes one major issue faced by SuperKEKB: the electron cloud effect (ECE) in the positron ring, which was observed during phase-1 commissioning. In the high-beam-current region, electron clouds, i.e., the source of the ECE, existed in the beam pipes at drift spaces of the ring, which had antechambers and a titanium nitride (TiN) film coating as countermeasures against the ECE. Permanent magnets and solenoids used to generate magnetic fields in the beam direction were attached to the beam pipes as additional countermeasures before the next commissioning phase commenced. Consequently, during phase-2 commissioning, experiments showed that the threshold of the current linear density for exciting the ECE increased by a factor of at least 2 compared to that during phase-1 commissioning. While the countermeasures were strengthened, the effectiveness of the antechambers and TiN film coating of the real beam pipe was reevaluated. Through various simulations and dedicated experiments during phase-2 commissioning, the antechambers were found to be less effective than anticipated with regard to reducing the number of photoelectrons in the beam channel. In contrast, the TiN film coating had a low secondary electron yield, as expected.
- 1 February 2018
- Published by Elsevier in Applied Surface Science
- Vol. 432, 347-355
Beam scrubbing of beam pipes during the first commissioning of SuperKEKB
- 1 February 2018
- Published by Elsevier in Applied Surface Science
- Vol. 432, 347-355
Beam scrubbing of beam pipes during the first commissioning of SuperKEKB
- 2 March 2017
- Published by American Vacuum Society in Journal of Vacuum Science & Technology A
- Vol. 35 (3)
Achievements and problems in the first commissioning of superKEKB vacuum system
The first (phase-1) commissioning of SuperKEKB, an asymmetric-energy electron–positron collider at High Energy Accelerator Research Organization, known as KEK, Japan, began in February 2016 and successfully ended in June 2016. Three major tasks of the phase-1 commissioning were as follows: (1) vacuum scrubbing of the new beam pipes in anticipation of a sufficiently long beam lifetime in the next commissioning, (2) checking the stabilities of various new vacuum components at high beam currents of approximately 1 A, and (3) beam tuning to study stability and achieve low emittance. The coefficient of photon stimulated desorption rate, η (molecules photon−1), decreased steadily with increasing photon dose, as expected. The temperature increases of the bellows chambers, connection flanges, etc., were less than 5 °C at 1 A. The effectiveness of an antechamber, a TiN coating, and a clearing electrode to suppress the electron cloud effect (ECE) was confirmed. However, the ECE in the Al-alloy bellows chambers without TiN coating was observed. The use of permanent magnets to create an axial magnetic field successfully suppressed this effect. However, the ECE was still exhibited at higher linear current densities (=bunch current/bunch spacing). Furthermore, the attachment of permanent magnets or solenoids even to the beam pipes with antechambers and TiN coating at drift spaces is under consideration before the next (phase-2) commissioning.
- 2 March 2017
- Published by American Vacuum Society in Journal of Vacuum Science & Technology A
- Vol. 35 (3)
Achievements and problems in the first commissioning of superKEKB vacuum system
The first (phase-1) commissioning of SuperKEKB, an asymmetric-energy electron–positron collider at High Energy Accelerator Research Organization, known as KEK, Japan, began in February 2016 and successfully ended in June 2016. Three major tasks of the phase-1 commissioning were as follows: (1) vacuum scrubbing of the new beam pipes in anticipation of a sufficiently long beam lifetime in the next commissioning, (2) checking the stabilities of various new vacuum components at high beam currents of approximately 1 A, and (3) beam tuning to study stability and achieve low emittance. The coefficient of photon stimulated desorption rate, η (molecules photon−1), decreased steadily with increasing photon dose, as expected. The temperature increases of the bellows chambers, connection flanges, etc., were less than 5 °C at 1 A. The effectiveness of an antechamber, a TiN coating, and a clearing electrode to suppress the electron cloud effect (ECE) was confirmed. However, the ECE in the Al-alloy bellows chambers without TiN coating was observed. The use of permanent magnets to create an axial magnetic field successfully suppressed this effect. However, the ECE was still exhibited at higher linear current densities (=bunch current/bunch spacing). Furthermore, the attachment of permanent magnets or solenoids even to the beam pipes with antechambers and TiN coating at drift spaces is under consideration before the next (phase-2) commissioning.
- 23 February 2016
- Published by American Vacuum Society in Journal of Vacuum Science & Technology A
- Vol. 34 (2) , 021605
Results and problems in the construction phase of the SuperKEKB vacuum system
The SuperKEKB, the upgrade of the KEKB, is an electron–positron collider with asymmetric energies, that is, 7.0 GeV electrons and 4.0 GeV positrons, designed for a luminosity of 8 × 1035 cm−2 s−1. As a key item of the upgrade project, a new vacuum system for the SuperKEKB has been in construction since 2010. Over 1000 beam pipes, vacuum pumps, bellows chambers, and other various vacuum components had almost been fabricated in 2014. All the new beam pipes were baked as a general rule before being installed in the KEKB tunnel. A thin TiN film with a low secondary-electron yield was coated on the inside of the beam pipes for the positron ring as a countermeasure against the electron cloud effect. The performance of the new built-in nonevaporable getter (NEG) pumps and the step-less connection flanges met the expectation. Although several problems such as damage to the bellows chambers due to a large earthquake, cracking of the welding lines of the aluminum beam pipes, and a relatively high air-leak rate at the connection flanges occurred during the construction work, approximately 99% of the beam pipes were successfully installed by the end of October 2015. The activation of the NEG pumps in the tunnel started at the beginning of 2015 and has also been completed in approximately 97% of the ring. The installed beam pipes and the bellows chambers in the tunnel were aligned to their specified positions as the final step of the installation work. The vacuum system was ready in 2015 with the aim of starting the first commissioning in 2016. The various experiences during the construction phase reported here will be a useful reference for the design and construction of other accelerators in the future.
- 23 February 2016
- Published by American Vacuum Society in Journal of Vacuum Science & Technology A
- Vol. 34 (2) , 021605
Results and problems in the construction phase of the SuperKEKB vacuum system
The SuperKEKB, the upgrade of the KEKB, is an electron–positron collider with asymmetric energies, that is, 7.0 GeV electrons and 4.0 GeV positrons, designed for a luminosity of 8 × 1035 cm−2 s−1. As a key item of the upgrade project, a new vacuum system for the SuperKEKB has been in construction since 2010. Over 1000 beam pipes, vacuum pumps, bellows chambers, and other various vacuum components had almost been fabricated in 2014. All the new beam pipes were baked as a general rule before being installed in the KEKB tunnel. A thin TiN film with a low secondary-electron yield was coated on the inside of the beam pipes for the positron ring as a countermeasure against the electron cloud effect. The performance of the new built-in nonevaporable getter (NEG) pumps and the step-less connection flanges met the expectation. Although several problems such as damage to the bellows chambers due to a large earthquake, cracking of the welding lines of the aluminum beam pipes, and a relatively high air-leak rate at the connection flanges occurred during the construction work, approximately 99% of the beam pipes were successfully installed by the end of October 2015. The activation of the NEG pumps in the tunnel started at the beginning of 2015 and has also been completed in approximately 97% of the ring. The installed beam pipes and the bellows chambers in the tunnel were aligned to their specified positions as the final step of the installation work. The vacuum system was ready in 2015 with the aim of starting the first commissioning in 2016. The various experiences during the construction phase reported here will be a useful reference for the design and construction of other accelerators in the future.
- Open Access
- 1 January 2014
- Published by The Vacuum Society of Japan in Journal of the Vacuum Society of Japan
- Vol. 57 (4) , 136-139
Construction Status of SuperKEKB Vacuum System
- 1 January 2014
- Published by The Vacuum Society of Japan in Journal of the Vacuum Society of Japan
- Vol. 57 (4) , 136-139
Open AccessConstruction Status of SuperKEKB Vacuum System
- Open Access
- 1 January 2010
- Published by The Vacuum Society of Japan in Journal of the Vacuum Society of Japan
- Vol. 53 (3) , 144-147
Application of MO-Type Flange for Accelerator Beam Ducts 3
- 1 January 2010
- Published by The Vacuum Society of Japan in Journal of the Vacuum Society of Japan
- Vol. 53 (3) , 144-147
Open AccessApplication of MO-Type Flange for Accelerator Beam Ducts 3
- 20 June 2007
- Published by Elsevier in Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment
- Vol. 578 (3) , 470-479
Recent studies on photoelectron and secondary electron yields of TiN and NEG coatings using the KEKB positron ring
- 20 June 2007
- Published by Elsevier in Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment
- Vol. 578 (3) , 470-479
Recent studies on photoelectron and secondary electron yields of TiN and NEG coatings using the KEKB positron ring