Christofer M. Harper
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Christofer M. Harper has a total of 20 co-authors. Here are the top co-authors by number of shared publications:
- Roy Sturgill
Department of Civil, Construction, and Environmental Engineering, Iowa State University, Ames, IA
2 shared publications - Susan M. Bogus
University of New Mexico
2 shared publications - Adi M. Smadi
Department of Civil, Environmental and Architectural Engineering, University of Kansas, Lawrence, KS
1 shared publication - Bolivar Senior
Department of Construction Management, Colorado State University, Fort Collins, CO
1 shared publication Dai Q. Tran
Department of Civil, Environmental and Architectural Engineering, University of Kansas, Lawrence, Kansas, USA
1 shared publicationDan Tran
Department of Civil, Environmental, and Architectural Engineering, University of Kansas, Lawrence, KS
1 shared publication
Latest Publications
- 27 September 2025
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2680 (1) , 382-395
Product Evaluation Programs at State Departments of Transportation
Transportation infrastructure requires significant amounts of products and materials in construction, maintenance, and operations. Suppliers, manufacturers, contractors, and internal staff submit new and existing products, materials, engineered systems, and innovative technologies to departments of transportation (DOTs) for evaluation. For a product to be considered, it must meet a specific need, be cost-effective, not disrupt other operations, and satisfy specifications and functional requirements. State DOTs use product evaluation programs (PEPs) to assess a product’s suitability. These programs involve processes, procedures, and tools to test, evaluate, and determine whether a product is approved. Approved products are added to approved/qualified product lists. However, the evaluation processes vary among DOTs owing to differences in agency operations. This study investigated the current practices, policies, management techniques, tools, and workflows of PEPs among DOTs. Data were collected through a three-step process: a review of existing literature, a national survey questionnaire of state DOTs, and case study interviews with five DOTs, including Arizona, California, Florida, Michigan, and New Hampshire. The findings indicated that while approaches to product evaluations differed across state DOTs, common elements included specific groups or divisions within the DOT facilitating the PEP, a defined application and submission process for submitters, the use of specifications and criteria for evaluation, varying timelines for evaluating products, and the utilization of PEP resources, such as the National Transportation PEP and associated tools. This information assists DOTs in enhancing their current PEPs, making them more efficient despite the limited resources (e.g., staff, funding) typically available for PEP operations.
- 27 September 2025
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2680 (1) , 382-395
Product Evaluation Programs at State Departments of Transportation
Transportation infrastructure requires significant amounts of products and materials in construction, maintenance, and operations. Suppliers, manufacturers, contractors, and internal staff submit new and existing products, materials, engineered systems, and innovative technologies to departments of transportation (DOTs) for evaluation. For a product to be considered, it must meet a specific need, be cost-effective, not disrupt other operations, and satisfy specifications and functional requirements. State DOTs use product evaluation programs (PEPs) to assess a product’s suitability. These programs involve processes, procedures, and tools to test, evaluate, and determine whether a product is approved. Approved products are added to approved/qualified product lists. However, the evaluation processes vary among DOTs owing to differences in agency operations. This study investigated the current practices, policies, management techniques, tools, and workflows of PEPs among DOTs. Data were collected through a three-step process: a review of existing literature, a national survey questionnaire of state DOTs, and case study interviews with five DOTs, including Arizona, California, Florida, Michigan, and New Hampshire. The findings indicated that while approaches to product evaluations differed across state DOTs, common elements included specific groups or divisions within the DOT facilitating the PEP, a defined application and submission process for submitters, the use of specifications and criteria for evaluation, varying timelines for evaluating products, and the utilization of PEP resources, such as the National Transportation PEP and associated tools. This information assists DOTs in enhancing their current PEPs, making them more efficient despite the limited resources (e.g., staff, funding) typically available for PEP operations.
- 27 July 2024
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2679 (2) , 123-135
Exploring Inspection Technologies for Highway Infrastructure During Construction and Asset Management
State departments of transportation (DOTs) historically employed onsite inspectors to perform hands-on and in-person infrastructure inspections. However, with the latest technological advancements, state DOTs increasingly use technologies to complement their inspection of highway infrastructure. This study investigates common technologies used by state DOTs to inspect highway infrastructure during the construction and maintenance of highway assets. A list of 19 technologies was developed from the literature review. A national survey of 50 state DOTs was conducted to determine the most common technologies used for the inspection of highway infrastructure. The top technologies used by state DOTs to inspect highway infrastructure during construction are tablet/smart mobile devices; global navigation satellite systems (GNSS)/global positioning systems (GPS); remote sensors such as accelerometers, maturity meter sensors, or strain gauges; e-ticketing; remote cameras; and unmanned aircraft systems (UAS). The top technologies used by state DOTs to inspect highway infrastructure during maintenance of assets are geographic information systems applications, light detection and ranging/3D laser scanners, tablet/smart mobile devices, GNSS/GPS, and UAS. Six case studies with Florida, Illinois, Iowa, Minnesota, New York, and Oregon state DOTs were then conducted to verify the results from the survey questionnaire. The main inspection activities and challenges of using these technologies during construction and asset management were discussed. The findings from this study provide valuable information for state DOTs to understand how better to implement technologies for the inspection of highway infrastructure.
- 27 July 2024
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2679 (2) , 123-135
Exploring Inspection Technologies for Highway Infrastructure During Construction and Asset Management
State departments of transportation (DOTs) historically employed onsite inspectors to perform hands-on and in-person infrastructure inspections. However, with the latest technological advancements, state DOTs increasingly use technologies to complement their inspection of highway infrastructure. This study investigates common technologies used by state DOTs to inspect highway infrastructure during the construction and maintenance of highway assets. A list of 19 technologies was developed from the literature review. A national survey of 50 state DOTs was conducted to determine the most common technologies used for the inspection of highway infrastructure. The top technologies used by state DOTs to inspect highway infrastructure during construction are tablet/smart mobile devices; global navigation satellite systems (GNSS)/global positioning systems (GPS); remote sensors such as accelerometers, maturity meter sensors, or strain gauges; e-ticketing; remote cameras; and unmanned aircraft systems (UAS). The top technologies used by state DOTs to inspect highway infrastructure during maintenance of assets are geographic information systems applications, light detection and ranging/3D laser scanners, tablet/smart mobile devices, GNSS/GPS, and UAS. Six case studies with Florida, Illinois, Iowa, Minnesota, New York, and Oregon state DOTs were then conducted to verify the results from the survey questionnaire. The main inspection activities and challenges of using these technologies during construction and asset management were discussed. The findings from this study provide valuable information for state DOTs to understand how better to implement technologies for the inspection of highway infrastructure.
- 21 April 2022
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2676 (9) , 479-490
Causes, Implications, and Strategies for Project Closeout Delays in Highway Construction
In highway construction, completing projects on time is critical. However, when projects are not completed on time, one of the aspects that is often neglected by the state departments of transportation (DOTs), which causes delays in highway construction, is project closeout. The project closeout phase, if delayed, not only has consequences for transportation agencies and contractors, but also leads to substantial social costs to the public. Despite the potential magnitude of the impact, there is limited knowledge about the factors that cause project closeout delays or about strategies for timely highway construction project closeouts. This study identified the causes that delay highway project closeouts, raises awareness of the implications of delays, and provides recommendations for efficient highway project closeout practices. The research methodology included an extensive literature review, a survey questionnaire (40 state DOTs participating), and case studies of eight state DOTs. The results showed that difficulties in attaining the required documentation, claims and litigations, managing multiple funding sources, a lack of urgency from local utilities/entities, and the lack of sufficient DOT project staff are major factors that delay project closeout. When a highway construction project is not closed out in a timely manner, the DOT can be subject to additional costs, obsolete funding sources, loss of project documentation, loss of staff with project knowledge (through retirement/attrition), and potential adverse impacts on internal and external relationships. The authors provide recommendations for state DOTs to mitigate closeout delays and help ensure timely finalization of highway construction projects.
- 21 April 2022
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2676 (9) , 479-490
Causes, Implications, and Strategies for Project Closeout Delays in Highway Construction
In highway construction, completing projects on time is critical. However, when projects are not completed on time, one of the aspects that is often neglected by the state departments of transportation (DOTs), which causes delays in highway construction, is project closeout. The project closeout phase, if delayed, not only has consequences for transportation agencies and contractors, but also leads to substantial social costs to the public. Despite the potential magnitude of the impact, there is limited knowledge about the factors that cause project closeout delays or about strategies for timely highway construction project closeouts. This study identified the causes that delay highway project closeouts, raises awareness of the implications of delays, and provides recommendations for efficient highway project closeout practices. The research methodology included an extensive literature review, a survey questionnaire (40 state DOTs participating), and case studies of eight state DOTs. The results showed that difficulties in attaining the required documentation, claims and litigations, managing multiple funding sources, a lack of urgency from local utilities/entities, and the lack of sufficient DOT project staff are major factors that delay project closeout. When a highway construction project is not closed out in a timely manner, the DOT can be subject to additional costs, obsolete funding sources, loss of project documentation, loss of staff with project knowledge (through retirement/attrition), and potential adverse impacts on internal and external relationships. The authors provide recommendations for state DOTs to mitigate closeout delays and help ensure timely finalization of highway construction projects.
- 17 September 2021
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2676 (2) , 186-196
Benefits and Challenges Associated with the Implementation of Lean in Transportation Agencies
The highway construction industry constantly looks to increase productivity while public transportation agencies face challenges of shrinking budgets and staff numbers, even as the work continues to increase in size and demand. As a paradigm to maximize value and minimize waste with the resources available, Lean offers promise to enhance productivity, quality, and service. This study investigates the implementation of Lean by evaluating Lean conditions, practices, benefits, and challenges as expressed by U.S. and UK public transportation highway agencies as well as comparing the implementation of Lean between these agencies. Using a comprehensive literature review and formal interviews with six state departments of transportation along with Highways England from the UK, the findings show that Lean is intended to make process improvements to boost products and services to consumers. By creating a culture of continuous improvement, transportation agencies can improve their processes and increase their efficiencies and performance. Conversely, transportation agencies struggle to educate their employees and stakeholders in their understanding and practices of Lean, which causes confusion and ineffectiveness. Comparing the U.S. and UK transportation agencies, the approach to Lean implementation differs from a top-down approach for U.S. agencies to a bottom-up approach for Highways England. Furthermore, Highways England has an established tool for measuring Lean while development of quantifiable Lean measures is in its infancy in U.S. agencies. Overall, while the sample is limited, this exploratory study provides information for transportation agencies to use in consideration of implementing Lean.
- 17 September 2021
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2676 (2) , 186-196
Benefits and Challenges Associated with the Implementation of Lean in Transportation Agencies
The highway construction industry constantly looks to increase productivity while public transportation agencies face challenges of shrinking budgets and staff numbers, even as the work continues to increase in size and demand. As a paradigm to maximize value and minimize waste with the resources available, Lean offers promise to enhance productivity, quality, and service. This study investigates the implementation of Lean by evaluating Lean conditions, practices, benefits, and challenges as expressed by U.S. and UK public transportation highway agencies as well as comparing the implementation of Lean between these agencies. Using a comprehensive literature review and formal interviews with six state departments of transportation along with Highways England from the UK, the findings show that Lean is intended to make process improvements to boost products and services to consumers. By creating a culture of continuous improvement, transportation agencies can improve their processes and increase their efficiencies and performance. Conversely, transportation agencies struggle to educate their employees and stakeholders in their understanding and practices of Lean, which causes confusion and ineffectiveness. Comparing the U.S. and UK transportation agencies, the approach to Lean implementation differs from a top-down approach for U.S. agencies to a bottom-up approach for Highways England. Furthermore, Highways England has an established tool for measuring Lean while development of quantifiable Lean measures is in its infancy in U.S. agencies. Overall, while the sample is limited, this exploratory study provides information for transportation agencies to use in consideration of implementing Lean.
- 1 July 2021
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 37 (4) , 04021018
Factors Affecting Workforce Resilience in Public Transportation Agencies
Ensuring the resiliency of a nation’s transportation infrastructure network requires a skilled and dependable workforce; this relies heavily on a transportation agency’s ability to recruit and retain their employees. Public transportation agencies face unprecedented challenges in preserving the workforce necessary to function effectively and need robust strategies to maintain workforce resiliency by recruiting and retaining quality staff to construct and maintain transportation infrastructure now and into the future. This study identified existing workforce issues and recruitment and retention practices by state Departments of Transportation (DOTs) and compared rural and urban transportation employee outlooks. Results indicated that the primary incentives for current DOT employees to consider private-sector employment are better salary and promotional opportunities. Additionally, rural DOT regions have a more difficult time recruiting and retaining employees, and rural DOT employees feel that DOTs are not fully aware of their needs. This study contributes to the body of knowledge by providing a means to assess and ultimately improve workforce resiliency in public transportation agencies, thereby allowing management to maintain transportation infrastructure successfully.
- 1 July 2021
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 37 (4) , 04021018
Factors Affecting Workforce Resilience in Public Transportation Agencies
Ensuring the resiliency of a nation’s transportation infrastructure network requires a skilled and dependable workforce; this relies heavily on a transportation agency’s ability to recruit and retain their employees. Public transportation agencies face unprecedented challenges in preserving the workforce necessary to function effectively and need robust strategies to maintain workforce resiliency by recruiting and retaining quality staff to construct and maintain transportation infrastructure now and into the future. This study identified existing workforce issues and recruitment and retention practices by state Departments of Transportation (DOTs) and compared rural and urban transportation employee outlooks. Results indicated that the primary incentives for current DOT employees to consider private-sector employment are better salary and promotional opportunities. Additionally, rural DOT regions have a more difficult time recruiting and retaining employees, and rural DOT employees feel that DOTs are not fully aware of their needs. This study contributes to the body of knowledge by providing a means to assess and ultimately improve workforce resiliency in public transportation agencies, thereby allowing management to maintain transportation infrastructure successfully.
- 17 April 2020
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 27 (9) , 2163-2178
Staffing needs and utilization for alternative contracting methods in highway design and construction
Purpose: This research investigates procedures and effective practices on staffing needs and utilization for successful implementation of alternative contracting methods (ACMs) in the United Sates, including design–build (D–B) and construction manager/general contractor (CM/GC) delivery methods.Design/methodology/approach: The review of published empirical studies, a national survey of transportation agencies and case studies of highway agencies form the basis of the conclusions in this research. In addition to the national survey, with 46 of 50 agencies participating, the research presents case studies from five highway agencies in the United States including the following: California, Florida, Georgia, Minnesota and Virginia. These five case studies were selected from agencies that have extensive experience in delivering ACM projects. The case studies involved a thorough procedural review and structured interviews of agency personnel. The agencies then validated the results and conclusions.Findings: The results showed that implementing ACM projects requires different knowledge, skills and management and coordination efforts than traditional design–bid–build (D–B–B) projects. The study found that the key success factors of implementing ACMs are the following: (1) establishment of an ACM champion; (2) active involvement of key staff throughout the ACM project development process; (3) appropriate use of consultants and (4) ACM training and staff development.Research limitations/implications: The issue on how to attract and retain talented staff and a committed core workforce with appropriate skills and competences for ACM implementation is vital for highway agencies, but it lacks information and guidance. The chief limitation of this research is that the primary data were collected from highway agencies in the United Sates. Any future research should include more data to enhance the validity of this study outside of the public transportation sector.Practical implications: Developing a sustainable level of core staff plays an important role in implementing an ACM program. The result of this research will help transportation agencies and other public owners to develop effective staffing strategies for successful implementation of ACMs. The findings of this research also address the appropriate use of consultants to supplement core staff with regard to delivery of ACM projects.Originality/value: This research is the first attempt to examine the staffing needs and utilization for ACM projects.
- 17 April 2020
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 27 (9) , 2163-2178
Staffing needs and utilization for alternative contracting methods in highway design and construction
Purpose: This research investigates procedures and effective practices on staffing needs and utilization for successful implementation of alternative contracting methods (ACMs) in the United Sates, including design–build (D–B) and construction manager/general contractor (CM/GC) delivery methods.Design/methodology/approach: The review of published empirical studies, a national survey of transportation agencies and case studies of highway agencies form the basis of the conclusions in this research. In addition to the national survey, with 46 of 50 agencies participating, the research presents case studies from five highway agencies in the United States including the following: California, Florida, Georgia, Minnesota and Virginia. These five case studies were selected from agencies that have extensive experience in delivering ACM projects. The case studies involved a thorough procedural review and structured interviews of agency personnel. The agencies then validated the results and conclusions.Findings: The results showed that implementing ACM projects requires different knowledge, skills and management and coordination efforts than traditional design–bid–build (D–B–B) projects. The study found that the key success factors of implementing ACMs are the following: (1) establishment of an ACM champion; (2) active involvement of key staff throughout the ACM project development process; (3) appropriate use of consultants and (4) ACM training and staff development.Research limitations/implications: The issue on how to attract and retain talented staff and a committed core workforce with appropriate skills and competences for ACM implementation is vital for highway agencies, but it lacks information and guidance. The chief limitation of this research is that the primary data were collected from highway agencies in the United Sates. Any future research should include more data to enhance the validity of this study outside of the public transportation sector.Practical implications: Developing a sustainable level of core staff plays an important role in implementing an ACM program. The result of this research will help transportation agencies and other public owners to develop effective staffing strategies for successful implementation of ACMs. The findings of this research also address the appropriate use of consultants to supplement core staff with regard to delivery of ACM projects.Originality/value: This research is the first attempt to examine the staffing needs and utilization for ACM projects.
- 1 November 2011
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 137 (11) , 950-957
Simulation of Overlapping Design Activities in Concurrent Engineering
Concurrent engineering is the process of reducing the total project delivery time by overlapping activities that normally occur sequentially. The benefits are a shortening of delivery time and a possible reduction in overall costs. However, there are potential risks to overlapping dependent activities. The interaction between an upstream activity and a downstream activity relies on how information evolves in the upstream activity and how sensitive the downstream activity is to that changing information. This implies that if an upstream activity is slow to evolve information and a downstream activity is highly sensitive to changing information, the risk in overlapping these activities will be higher than activities that are fast to evolve and not as sensitive to changing information. The risk can manifest in rework, or reperforming some aspect of the downstream activity because of the evolution of the upstream activity and the amount of overlapping used. This research developed computer simulation models t...
- 1 November 2011
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 137 (11) , 950-957
Simulation of Overlapping Design Activities in Concurrent Engineering
Concurrent engineering is the process of reducing the total project delivery time by overlapping activities that normally occur sequentially. The benefits are a shortening of delivery time and a possible reduction in overall costs. However, there are potential risks to overlapping dependent activities. The interaction between an upstream activity and a downstream activity relies on how information evolves in the upstream activity and how sensitive the downstream activity is to that changing information. This implies that if an upstream activity is slow to evolve information and a downstream activity is highly sensitive to changing information, the risk in overlapping these activities will be higher than activities that are fast to evolve and not as sensitive to changing information. The risk can manifest in rework, or reperforming some aspect of the downstream activity because of the evolution of the upstream activity and the amount of overlapping used. This research developed computer simulation models t...