Ali Farhang Mehr
Ali Farhang Mehr has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Alejandro R. Diaz
Michigan State University
1 shared publication - Christopher Hoyle
Northwestern University, Evanston, IL 60208
1 shared publication - G. Li
University of Maryland
1 shared publication - Irem Y. Tumer
School of Mechanical, Industrial and Manufacturing Engineering, Oregon State University, Corvallis, OR 97331
1 shared publication - Irem Y. Tumer
NASA Ames Research Center, M/S 269, Moffett Field, CA 94035
1 shared publication - Shapour Azarm
Department of Mechanical Engineering, University of Maryland, College Park, MD, USA
1 shared publication
Latest Publications
- 1 January 2007
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-7
On Quantifying Cost-Benefit of ISHM in Aerospace Systems
Integrated systems health management (ISHM) is a desired system engineering capability to detect, assess, and isolate faults in complex aerospace systems to improve safety and reliability. At the conceptual design level, system-level engineers must make decisions regarding the extent of vehicle fault coverage using on-board sensors and the data collection, processing, interpretation, display, and action capabilities for the various subsystems, all considered essential parts of ISHM. In this paper, we propose a Cost-Benefit Analysis approach to initiate the ISHM design process. The key to this analysis is the formulation of an objective function that explicitly quantifies the cost-benefit factors involved with using ISHM technology in various subsystems. In the end, to determine the best ISHM system configuration, an objective is formulated, referred to as Profit, which is expressed as the product of system availability (A) and revenue per unit availability (R), minus the sum of cost of detection (CD) and cost of risk (CR). Cost of detection includes the cost of periodic inspection/maintenance and the cost of including ISHM; Cost of Risk quantifies risk in financial terms as a function of the consequential cost of a fault and the probabilities of occurrence and detection. Increasing the ISHM footprint will generally lower cost of risk while raising cost of detection, while Availability will increase or decrease based upon the balance of the reliability and detectability of the sensors added, versus their ability to reduce total maintenance time. The analysis is conducted at the system functional level, with ISHM allocated to functional blocks in the optimization analysis. The proposed method is demonstrated using a simplified aerospace system design problem resulting in a configuration of sensors which optimizes the cost-benefit of the ISHM system for the given input parameters. In this problem, profit was increased by 11%, inspection interval increased by a factor of 1.5, and cost of risk reduced by a factor of 2.4.
- 1 January 2007
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-7
On Quantifying Cost-Benefit of ISHM in Aerospace Systems
Integrated systems health management (ISHM) is a desired system engineering capability to detect, assess, and isolate faults in complex aerospace systems to improve safety and reliability. At the conceptual design level, system-level engineers must make decisions regarding the extent of vehicle fault coverage using on-board sensors and the data collection, processing, interpretation, display, and action capabilities for the various subsystems, all considered essential parts of ISHM. In this paper, we propose a Cost-Benefit Analysis approach to initiate the ISHM design process. The key to this analysis is the formulation of an objective function that explicitly quantifies the cost-benefit factors involved with using ISHM technology in various subsystems. In the end, to determine the best ISHM system configuration, an objective is formulated, referred to as Profit, which is expressed as the product of system availability (A) and revenue per unit availability (R), minus the sum of cost of detection (CD) and cost of risk (CR). Cost of detection includes the cost of periodic inspection/maintenance and the cost of including ISHM; Cost of Risk quantifies risk in financial terms as a function of the consequential cost of a fault and the probabilities of occurrence and detection. Increasing the ISHM footprint will generally lower cost of risk while raising cost of detection, while Availability will increase or decrease based upon the balance of the reliability and detectability of the sensors added, versus their ability to reduce total maintenance time. The analysis is conducted at the system functional level, with ISHM allocated to functional blocks in the optimization analysis. The proposed method is demonstrated using a simplified aerospace system design problem resulting in a configuration of sensors which optimizes the cost-benefit of the ISHM system for the given input parameters. In this problem, profit was increased by 11%, inspection interval increased by a factor of 1.5, and cost of risk reduced by a factor of 2.4.
- 28 February 2006
- Published by Springer Nature in Structural and Multidisciplinary Optimization
- Vol. 31 (4) , 260-269
Approximation of multiresponse deterministic engineering simulations: a dependent metamodeling approach
- 28 February 2006
- Published by Springer Nature in Structural and Multidisciplinary Optimization
- Vol. 31 (4) , 260-269
Approximation of multiresponse deterministic engineering simulations: a dependent metamodeling approach
- 29 January 2006
- Published by Wiley in Journal of Mechanical Design
- Vol. 128 (4) , 1014-1022
Risk-Based Decision-Making for Managing Resources During the Design of Complex Space Exploration Systems
Complex space exploration systems are often designed in collaborative engineering environments where requirements and design decisions by various subsystem engineers have a great impact on the overall risk of the mission. As a result, the system-level management should allocate risk mitigation resources (e.g., capital to place additional sensors or to improve the current technology) among various risk elements such that the main objectives of the system are achieved as closely as possible. Minimizing risk has been long accepted as one of the major drivers for system-level decisions and particularly resource management. In this context, Risk-Based Decision Making refers to a process that allocates resources in such a way that the expected risk of the overall system is minimized. This paper presents a new risk-based design decision-making method, referred to as Risk and Uncertainty Based Concurrent Integrated Design Methodology or RUBIC Design Methodology for short. The new approach is based on concepts from portfolio optimization theory and continuous resource management, extended to provide a mathematical rigor for risk-based decision-making during the design of complex space exploration systems. The RUBIC design method is based on the idea that a unit of resource, allocated to mitigate a certain risk in the system, contributes to the overall system risk reduction in the following two ways: (1) by mitigating that particular risk; and (2) by impacting other risk elements in the system (i.e., the correlation among various risk elements). RUBIC then provides a probabilistic framework for reducing the expected risk of the final system via optimal allocation of available risk-mitigation resources. The application of the proposed approach is demonstrated using a satellite reaction wheel example.
- 29 January 2006
- Published by Wiley in Journal of Mechanical Design
- Vol. 128 (4) , 1014-1022
Risk-Based Decision-Making for Managing Resources During the Design of Complex Space Exploration Systems
Complex space exploration systems are often designed in collaborative engineering environments where requirements and design decisions by various subsystem engineers have a great impact on the overall risk of the mission. As a result, the system-level management should allocate risk mitigation resources (e.g., capital to place additional sensors or to improve the current technology) among various risk elements such that the main objectives of the system are achieved as closely as possible. Minimizing risk has been long accepted as one of the major drivers for system-level decisions and particularly resource management. In this context, Risk-Based Decision Making refers to a process that allocates resources in such a way that the expected risk of the overall system is minimized. This paper presents a new risk-based design decision-making method, referred to as Risk and Uncertainty Based Concurrent Integrated Design Methodology or RUBIC Design Methodology for short. The new approach is based on concepts from portfolio optimization theory and continuous resource management, extended to provide a mathematical rigor for risk-based decision-making during the design of complex space exploration systems. The RUBIC design method is based on the idea that a unit of resource, allocated to mitigate a certain risk in the system, contributes to the overall system risk reduction in the following two ways: (1) by mitigating that particular risk; and (2) by impacting other risk elements in the system (i.e., the correlation among various risk elements). RUBIC then provides a probabilistic framework for reducing the expected risk of the final system via optimal allocation of available risk-mitigation resources. The application of the proposed approach is demonstrated using a satellite reaction wheel example.