Haitao Yu
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Haitao Yu has a total of 21 co-authors. Here are the top co-authors by number of shared publications:
- Mohamed Al-Hussein
Univ. of Alberta
5 shared publications - Don Mah
Ph.D. Candidate, Hole School of Construction Engineering, Department of Civil and Environmental Engineering, University of Alberta, Edmonton, Canada
4 shared publications - Farook Hamzeh
University of Alberta
3 shared publications - Mustafa Gül
University of Alberta
3 shared publications - Ahmed Bouferguene
University of Alberta
2 shared publications - Hong Xian Li
School of Architecture and Built Environment, Deakin University, 1 Gheringhap Street, Geelong, VIC 3220, Australia
2 shared publications
Latest Publications
- Open Access
- 22 June 2026
- Published by IGLC
- p. 811-823
An adaptive WIP controller framework for dynamic buffer management in modular construction
Lean construction principles emphasize maintaining production flow and managing variability to eliminate waste. However, in modular construction, high product mix and strict spatial constraints frequently disrupt this flow, rendering static buffering strategies ineffective. To address this challenge, this paper proposes …
- 22 June 2026
- Published by IGLC
- p. 811-823
Open AccessAn adaptive WIP controller framework for dynamic buffer management in modular construction
Lean construction principles emphasize maintaining production flow and managing variability to eliminate waste. However, in modular construction, high product mix and strict spatial constraints frequently disrupt this flow, rendering static buffering strategies ineffective. To address this challenge, this paper proposes …
- Open Access
- 22 June 2026
- Published by IGLC
- p. 787-797
Safety risk factors associated with a lean wood-framing prefabrication facility: a case study
The construction industry in North America has a disproportionate share of job-site incidents. Numerous studies have been performed to identify a multitude of macro and micro factors that impact the safety in construction workplaces. Prefabricated construction in North America is …
- 22 June 2026
- Published by IGLC
- p. 787-797
Open AccessSafety risk factors associated with a lean wood-framing prefabrication facility: a case study
The construction industry in North America has a disproportionate share of job-site incidents. Numerous studies have been performed to identify a multitude of macro and micro factors that impact the safety in construction workplaces. Prefabricated construction in North America is …
- Open Access
- 22 June 2026
- Published by IGLC
- p. 824-836
A digital-twin based CONWIP framework for work in progress (WIP) management in modular construction
Effective Work-in-Process (WIP) management is a principle of lean production, and pull-based control methods such as Kanban and CONWIP have been shown to regulate WIP levels and improve production flow. However, conventional implementations based on physical cards or visual signals …
- 22 June 2026
- Published by IGLC
- p. 824-836
Open AccessA digital-twin based CONWIP framework for work in progress (WIP) management in modular construction
Effective Work-in-Process (WIP) management is a principle of lean production, and pull-based control methods such as Kanban and CONWIP have been shown to regulate WIP levels and improve production flow. However, conventional implementations based on physical cards or visual signals …
- Open Access
- 22 June 2026
- Published by IGLC
- p. 862-874
Minimizing rework in offsite construction: error propagation analysis and quality control
Offsite construction (OSC) is increasingly used to enhance productivity, quality, and schedule reliability through industrialized, standardized production processes. However, OSC systems remain susceptible to local execution errors that propagate across interconnected production stations, resulting in rework, delays, and waste. This …
- 22 June 2026
- Published by IGLC
- p. 862-874
Open AccessMinimizing rework in offsite construction: error propagation analysis and quality control
Offsite construction (OSC) is increasingly used to enhance productivity, quality, and schedule reliability through industrialized, standardized production processes. However, OSC systems remain susceptible to local execution errors that propagate across interconnected production stations, resulting in rework, delays, and waste. This …
- Open Access
- 2 June 2025
- Published by IGLC
- p. 729-738
Impacts of Prefabrication on Construction Workers’ Wellbeing: a Case Study
The Industrial Revolution had lasting impacts on our social structures as well as on the built environment. The paradigm shift from a mostly agrarian society dominated by agricultural activities outdoors within a rural setting to working in an indoor environment within an urban setting has radically changed the way of life for individuals, families, and communities around the world. However, until recently, industrialization had not transformed the construction sector to the extent that is had other industrial sectors. Due to advances in modular construction, though, the construction sector is beginning to see transformation, bringing with favourable impacts on the construction workforce. Prefabrication has improved safety in construction; improved the lifestyle of workers by reducing fatigue and short-term and long-term disability claims; lowered the barriers to increased participation of women in the workforce; and enabled those less highly skilled to enter the construction job market. This paper systematically analyzes these trends in reference to a case study of the transformation of a large residential builder from traditional on-site construction to factory-based panelized construction.
- 2 June 2025
- Published by IGLC
- p. 729-738
Open AccessImpacts of Prefabrication on Construction Workers’ Wellbeing: a Case Study
The Industrial Revolution had lasting impacts on our social structures as well as on the built environment. The paradigm shift from a mostly agrarian society dominated by agricultural activities outdoors within a rural setting to working in an indoor environment within an urban setting has radically changed the way of life for individuals, families, and communities around the world. However, until recently, industrialization had not transformed the construction sector to the extent that is had other industrial sectors. Due to advances in modular construction, though, the construction sector is beginning to see transformation, bringing with favourable impacts on the construction workforce. Prefabrication has improved safety in construction; improved the lifestyle of workers by reducing fatigue and short-term and long-term disability claims; lowered the barriers to increased participation of women in the workforce; and enabled those less highly skilled to enter the construction job market. This paper systematically analyzes these trends in reference to a case study of the transformation of a large residential builder from traditional on-site construction to factory-based panelized construction.
- 25 September 2015
- Published by American Society of Civil Engineers (ASCE)
- p. 351-360
Energy Simulation of a Building Envelope for NetZero Energy Home (NZEH) Design
Energy consumption due to residential building operation is a crucial issue in cold-climate regions. In order to alleviate the energy demand from residential building operation, the concept of NetZero energy homes (NZEHs) has emerged as a solution. Appropriate design of the building envelope for NZEHs, (including insulation type and thickness, configuration, and other parameters), is a key to ensuring a high level of energy performance of NZEHs, and energy simulation provides a tool to investigate the energy performance of design options for each component of the NZEH building envelope. HOT2000, which is a widely used energy simulation tool in Canada, is used for energy simulation in this research; in order to achieve the goal of simulation automation, the batch version of HOT2000 is utilized. The energy performance of design options is simulated for such main components of NZEH building envelope as main wall, exposed floor, attic, basement wall, and basement floor, and, based on the simulation results, the functions and charts of energy performance are developed for these components. This research contributes to the body of research in this area by analyzing the energy performance of design options for NZEH building envelope.
- 25 September 2015
- Published by American Society of Civil Engineers (ASCE)
- p. 351-360
Energy Simulation of a Building Envelope for NetZero Energy Home (NZEH) Design
Energy consumption due to residential building operation is a crucial issue in cold-climate regions. In order to alleviate the energy demand from residential building operation, the concept of NetZero energy homes (NZEHs) has emerged as a solution. Appropriate design of the building envelope for NZEHs, (including insulation type and thickness, configuration, and other parameters), is a key to ensuring a high level of energy performance of NZEHs, and energy simulation provides a tool to investigate the energy performance of design options for each component of the NZEH building envelope. HOT2000, which is a widely used energy simulation tool in Canada, is used for energy simulation in this research; in order to achieve the goal of simulation automation, the batch version of HOT2000 is utilized. The energy performance of design options is simulated for such main components of NZEH building envelope as main wall, exposed floor, attic, basement wall, and basement floor, and, based on the simulation results, the functions and charts of energy performance are developed for these components. This research contributes to the body of research in this area by analyzing the energy performance of design options for NZEH building envelope.
- 13 May 2014
- Published by American Society of Civil Engineers (ASCE)
- p. 2255-2265
Evaluation of the Thermal and Structural Performance of Potential Energy Efficient Wall Systems for Mid-Rise Wood-Frame Buildings
Approximately 30% of energy use in Canada is consumed in buildings. The largest component of this energy consumption in multifamily residential buildings is space heating. One of the primary functions of building enclosure is reducing space-heating energy. Although heat flow cannot be completely prevented, it can be controlled to reduce energy consumption, create a sustainable environment, and implement indoor human comfort. However, this can be achieved by constructing a thermally resistant building enclosure. This study aims at developing and evaluating some innovative potential energy-efficient wall systems for mid-rise, wood- frame buildings in terms of their thermal and structural performances. Regarding the thermal resistance performance, four wall systems were developed, installed in a full-scale testing house, and examined on a long-term period along with a baseline wall system. The selection of the wall systems was based on specific considerations: current practice, preliminary structural analysis, prefabricability, and expected energy efficiency. Several sensors were installed at each wall system: heat flux, thermocouple and humidity sensors. The results from the thermal analysis and the structural tests provide useful directions toward future development of energy-efficient wall systems.
- 13 May 2014
- Published by American Society of Civil Engineers (ASCE)
- p. 2255-2265
Evaluation of the Thermal and Structural Performance of Potential Energy Efficient Wall Systems for Mid-Rise Wood-Frame Buildings
Approximately 30% of energy use in Canada is consumed in buildings. The largest component of this energy consumption in multifamily residential buildings is space heating. One of the primary functions of building enclosure is reducing space-heating energy. Although heat flow cannot be completely prevented, it can be controlled to reduce energy consumption, create a sustainable environment, and implement indoor human comfort. However, this can be achieved by constructing a thermally resistant building enclosure. This study aims at developing and evaluating some innovative potential energy-efficient wall systems for mid-rise, wood- frame buildings in terms of their thermal and structural performances. Regarding the thermal resistance performance, four wall systems were developed, installed in a full-scale testing house, and examined on a long-term period along with a baseline wall system. The selection of the wall systems was based on specific considerations: current practice, preliminary structural analysis, prefabricability, and expected energy efficiency. Several sensors were installed at each wall system: heat flux, thermocouple and humidity sensors. The results from the thermal analysis and the structural tests provide useful directions toward future development of energy-efficient wall systems.
- 13 May 2014
- Published by American Society of Civil Engineers (ASCE)
- p. 494-503
Carbon Footprint of Panelized Construction: An Empirical and Comparative Study
Compared with the conventional stick-built construction method, panelized construction offers greater sustainability in terms of energy, waste, and emissions reduction. The empirical research presented in this paper addresses the carbon footprint of panelized construction by quantifying and comparing the carbon emissions during the framing stage between panelized and conventional stick-built construction methods. The data for quantifying the emissions of panelized construction are collected from a prefabrication plant, Landmark Building Solutions (LBS), whereas the data for conventional construction are drawn from previous research of one of the coauthors. The framing phase of panelized construction, including panel fabrication in the plant, panel transportation to the site, and panel erection onsite is investigated and compared with the stick-built method. The associated emission comparison includes operational emissions and embodied emissions; the former has to do with direct emissions during fabrication and construction, and the latter is related to resources during the process, measured in terms of embodied emissions. Different research methods, such as reviews of accounting records and discussion with experts in a task-group setting, are customized to different elements. The research results indicate that carbon emissions are reduced significantly through the use of a panelized construction method compared to the conventional stick-built method.
- 13 May 2014
- Published by American Society of Civil Engineers (ASCE)
- p. 494-503
Carbon Footprint of Panelized Construction: An Empirical and Comparative Study
Compared with the conventional stick-built construction method, panelized construction offers greater sustainability in terms of energy, waste, and emissions reduction. The empirical research presented in this paper addresses the carbon footprint of panelized construction by quantifying and comparing the carbon emissions during the framing stage between panelized and conventional stick-built construction methods. The data for quantifying the emissions of panelized construction are collected from a prefabrication plant, Landmark Building Solutions (LBS), whereas the data for conventional construction are drawn from previous research of one of the coauthors. The framing phase of panelized construction, including panel fabrication in the plant, panel transportation to the site, and panel erection onsite is investigated and compared with the stick-built method. The associated emission comparison includes operational emissions and embodied emissions; the former has to do with direct emissions during fabrication and construction, and the latter is related to resources during the process, measured in terms of embodied emissions. Different research methods, such as reviews of accounting records and discussion with experts in a task-group setting, are customized to different elements. The research results indicate that carbon emissions are reduced significantly through the use of a panelized construction method compared to the conventional stick-built method.
- 1 January 2013
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 29 (1) , 103-111
Lean Transformation in a Modular Building Company: A Case for Implementation
Encouraged by the remarkable productivity improvements in the manufacturing sector, the construction industry has a long history of trying to garner the benefits of manufacturing technologies. Whereas industrialized construction methods, such as modular and manufactured buildings, have evolved over decades, core techniques used in prefabrication plants vary only slightly from those employed in traditional site-built construction. The objective of this research was to develop and implement a production system for the effective application of lean tools in building components prefabrication. To overcome the prevalent skepticism among middle management, the lean journey started with a pilot project involving one production line. Over a six-month period, lean tools such as 5S (sort, straighten, shine, standardize, and sustain), standardized work, takt time planning, variation management, and value stream mapping were implemented to a communication shelter production line. The implementation successful...
- 1 January 2013
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 29 (1) , 103-111
Lean Transformation in a Modular Building Company: A Case for Implementation
Encouraged by the remarkable productivity improvements in the manufacturing sector, the construction industry has a long history of trying to garner the benefits of manufacturing technologies. Whereas industrialized construction methods, such as modular and manufactured buildings, have evolved over decades, core techniques used in prefabrication plants vary only slightly from those employed in traditional site-built construction. The objective of this research was to develop and implement a production system for the effective application of lean tools in building components prefabrication. To overcome the prevalent skepticism among middle management, the lean journey started with a pilot project involving one production line. Over a six-month period, lean tools such as 5S (sort, straighten, shine, standardize, and sustain), standardized work, takt time planning, variation management, and value stream mapping were implemented to a communication shelter production line. The implementation successful...