Lifang Zou
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Lifang Zou has a total of 12 co-authors. Here are the top co-authors by number of shared publications:
Weiya Xu
Hohai University
2 shared publicationsArcady V. Dyskin
University of Western Australia
1 shared publicationBoris G. Tarasov
University of Western Australia
1 shared publicationDeepak P. Adhikary
CSIRO Earth Science and Resource Engineering
1 shared publication- Elena Pasternak
School of Engineering, the University of Western Australia, Perth 6009, Australia
1 shared publication Guotao Meng
PowerChina Huadong Engineering Corporation Limited
1 shared publication
Latest Publications
- Open Access
Permeability Tests and Numerical Simulation of Argillaceous Dolomite in the Jurong Pumped-Storage Power Station, China
Due to its poor hydro-physical properties and other characteristics, argillaceous dolomite is susceptible to seepage failure under high water pressure, affecting the seepage stability of a rock mass. To ensure the safety of the project, when the argillaceous dolomite is present, it is necessary to study the conditions pertaining to its seepage failure. Taking the argillaceous dolomite of Jurong Pumped Storage Power Station as the research object, the spatial distribution, occurrence, scale, degree of weathering, and mechanical and hydrogeological characteristics of the argillaceous dolomite were studied. Through on-site water pressure tests and laboratory variable head tests, the permeability characteristics of argillaceous dolomite were analyzed, and the hydraulic conductivity of the argillaceous dolomite in the upper reservoir and underground powerhouse areas was quantified. The argillaceous dolomite specimens were collected, and seepage failure tests were conducted to determine the critical water pressure for its seepage failure. Based on the results of the laboratory tests, a numerical model of groundwater flow was established. By changing the water level of the upper reservoir and the measures of the anti-seepage and drainage, the seepage stability of the argillaceous dolomite was discussed. The actual water pressure of argillaceous dolomite in the underground powerhouse area was identified during the operation of the Jurong pumped-storage power station. The calculations show that when fully enclosed anti-seepage and drainage measures are taken for the underground powerhouse, the maximum head of water is 98 m, which is lower than the critical water pressure of seepage failure for the argillaceous dolomite. Therefore, no seepage failure will occur. The results provide a scientific basis for the anti-seepage and drainage design of the underground powerhouse area.
Open AccessPermeability Tests and Numerical Simulation of Argillaceous Dolomite in the Jurong Pumped-Storage Power Station, China
Due to its poor hydro-physical properties and other characteristics, argillaceous dolomite is susceptible to seepage failure under high water pressure, affecting the seepage stability of a rock mass. To ensure the safety of the project, when the argillaceous dolomite is present, it is necessary to study the conditions pertaining to its seepage failure. Taking the argillaceous dolomite of Jurong Pumped Storage Power Station as the research object, the spatial distribution, occurrence, scale, degree of weathering, and mechanical and hydrogeological characteristics of the argillaceous dolomite were studied. Through on-site water pressure tests and laboratory variable head tests, the permeability characteristics of argillaceous dolomite were analyzed, and the hydraulic conductivity of the argillaceous dolomite in the upper reservoir and underground powerhouse areas was quantified. The argillaceous dolomite specimens were collected, and seepage failure tests were conducted to determine the critical water pressure for its seepage failure. Based on the results of the laboratory tests, a numerical model of groundwater flow was established. By changing the water level of the upper reservoir and the measures of the anti-seepage and drainage, the seepage stability of the argillaceous dolomite was discussed. The actual water pressure of argillaceous dolomite in the underground powerhouse area was identified during the operation of the Jurong pumped-storage power station. The calculations show that when fully enclosed anti-seepage and drainage measures are taken for the underground powerhouse, the maximum head of water is 98 m, which is lower than the critical water pressure of seepage failure for the argillaceous dolomite. Therefore, no seepage failure will occur. The results provide a scientific basis for the anti-seepage and drainage design of the underground powerhouse area.
- Open Access
- 8 May 2018
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 22 (10) , 3802-3809
Permeability Anisotropy of Columnar Jointed Rock Masses
- 8 May 2018
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 22 (10) , 3802-3809
Open AccessPermeability Anisotropy of Columnar Jointed Rock Masses
- 24 April 2012
- Published by Springer Nature in Rock Mechanics and Rock Engineering
- Vol. 46 (1) , 67-81
Physical Modelling of Stress-dependent Permeability in Fractured Rocks
- 24 April 2012
- Published by Springer Nature in Rock Mechanics and Rock Engineering
- Vol. 46 (1) , 67-81
Physical Modelling of Stress-dependent Permeability in Fractured Rocks