Chi-Wei Lin
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Chi-Wei Lin has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Tin-Chih Toly Chen
Department of Industrial Engineering and Management, National Yang Ming Chiao Tung University, Hsinchu, Taiwan
9 shared publications Tin-Chih Toly Chen
5 shared publicationsToly Chen
2 shared publicationsMin-Chi Chiu
1 shared publication- Min-Chi Chiu
Department of Industrial Engineering and Management, National Chin-Yi University of Technology, Taichung City, Taiwan
1 shared publication - Yang-Kuei Lin
Department of Industrial Engineering and Systems Management, Feng Chia University, Taichung 407102, Taiwan
1 shared publication
Latest Publications
- 20 August 2026
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 146 (5-6) , 3163-3184
Multi-objective job scheduling optimization in flexible job shops using dedicated GenAI system
- 20 August 2026
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 146 (5-6) , 3163-3184
Multi-objective job scheduling optimization in flexible job shops using dedicated GenAI system
- Open Access
- 18 June 2026
- Published by Elsevier in Supply Chain Analytics
- Vol. 15
A visualization analytics framework for interpreting fuzzy inference systems in supply chain management
- 18 June 2026
- Published by Elsevier in Supply Chain Analytics
- Vol. 15
Open AccessA visualization analytics framework for interpreting fuzzy inference systems in supply chain management
- 30 May 2026
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 145 (1-2) , 771-791
Domain-specific automated modelling for solving job scheduling problems in a three-echelon supply chain
- 30 May 2026
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 145 (1-2) , 771-791
Domain-specific automated modelling for solving job scheduling problems in a three-echelon supply chain
- Open Access
- 2 May 2026
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 144 (7-8) , 6031-6043
Trustworthy predictive maintenance in smart manufacturing using neutrosophic reasoning approach
Sophisticated machine learning (ML) and deep learning (DL) methodologies have been widely applied in predictive maintenance. However, such applications focus on optimizing overall prediction (or classification) accuracy across all learned examples, making it difficult to determine whether the prediction result for a single case is trustworthy. To fill this gap, a neutrosophic reasoning approach is proposed in this study for trustworthy predictive maintenance in smart manufacturing. In the proposed neutrosophic reasoning approach, a deep neutrosophic neural network (DNNN) is constructed and trained to predict the next time to failure of a machine, so as to arrange preventive maintenance in advance. By considering the overall prediction accuracy and the local prediction accuracy and learning sufficiency of each case, the three memberships of the neutrosophic time-to-failure forecast are derived. If the indeterminacy of the neutrosophic time-to-failure forecast exceeds a threshold, the prediction result is considered not trustworthy, because similar cases were either mis-predicted or rarely predicted before. The methodology proposed in this study has been applied to a case of a computer numeric control (CNC) tool in the literature to validate its applicability. According to the experimental results, the prediction results of about 6% of unlearned cases were not sufficiently trustworthy and should not be casually communicated to maintenance engineers. In addition, the trustworthiness can be economically enhanced by collecting the data of three more similar examples for each case. Furthermore, improving local prediction accuracy by 40% appeared to be a cost-effective approach to increasing the effectiveness of predictive maintenance in smart manufacturing.
- 2 May 2026
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 144 (7-8) , 6031-6043
Open AccessTrustworthy predictive maintenance in smart manufacturing using neutrosophic reasoning approach
Sophisticated machine learning (ML) and deep learning (DL) methodologies have been widely applied in predictive maintenance. However, such applications focus on optimizing overall prediction (or classification) accuracy across all learned examples, making it difficult to determine whether the prediction result for a single case is trustworthy. To fill this gap, a neutrosophic reasoning approach is proposed in this study for trustworthy predictive maintenance in smart manufacturing. In the proposed neutrosophic reasoning approach, a deep neutrosophic neural network (DNNN) is constructed and trained to predict the next time to failure of a machine, so as to arrange preventive maintenance in advance. By considering the overall prediction accuracy and the local prediction accuracy and learning sufficiency of each case, the three memberships of the neutrosophic time-to-failure forecast are derived. If the indeterminacy of the neutrosophic time-to-failure forecast exceeds a threshold, the prediction result is considered not trustworthy, because similar cases were either mis-predicted or rarely predicted before. The methodology proposed in this study has been applied to a case of a computer numeric control (CNC) tool in the literature to validate its applicability. According to the experimental results, the prediction results of about 6% of unlearned cases were not sufficiently trustworthy and should not be casually communicated to maintenance engineers. In addition, the trustworthiness can be economically enhanced by collecting the data of three more similar examples for each case. Furthermore, improving local prediction accuracy by 40% appeared to be a cost-effective approach to increasing the effectiveness of predictive maintenance in smart manufacturing.
- Open Access
- 25 April 2025
- Published by Springer Nature in Operational Research
- Vol. 25 (2) , 1-29
A hybrid XAI-FCI approach for job cycle time range estimation: wafer fabrication as an example
Fuzzified deep learning (DL) models have been widely used to estimate the job cycle time range to contain the actual value. However, this is a challenging task for DL models with complex structures and operations. To overcome this challenge, a hybrid explainable artificial intelligence (XAI)-fuzzy collaborative intelligence (FCI) approach is proposed in this study for job cycle time range estimation. In the proposed methodology, experts collaborate to predict the job cycle time using DL models. Each DL model is then explained by a random forest (RF), and the RFs of all DL models collaborate to fuzzify the DL output to estimate the job cycle time range. In this way, the DL model is fuzzified precisely in a post hoc way regardless of its complex structure and operations. Subsequently, another FCI mechanism is used to aggregate the job cycle time ranges estimated by all experts. The proposed methodology is novel as it is the first attempt to combine XAI and FCI. In addition, the first FCI layer collaborates multiple decision trees, while the second FCI layer collaborates between experts. Furthermore, the two FCI layers collaborates using most possible range (MPR) and partial-consensus fuzzy intersection (PCFI), respectively. The hybrid XAI-FCI approach has been applied to a real case. According to the experimental results, the hybrid XAI-FCI improved the precision of estimating the job cycle time range by up to 41%.
- 25 April 2025
- Published by Springer Nature in Operational Research
- Vol. 25 (2) , 1-29
Open AccessA hybrid XAI-FCI approach for job cycle time range estimation: wafer fabrication as an example
Fuzzified deep learning (DL) models have been widely used to estimate the job cycle time range to contain the actual value. However, this is a challenging task for DL models with complex structures and operations. To overcome this challenge, a hybrid explainable artificial intelligence (XAI)-fuzzy collaborative intelligence (FCI) approach is proposed in this study for job cycle time range estimation. In the proposed methodology, experts collaborate to predict the job cycle time using DL models. Each DL model is then explained by a random forest (RF), and the RFs of all DL models collaborate to fuzzify the DL output to estimate the job cycle time range. In this way, the DL model is fuzzified precisely in a post hoc way regardless of its complex structure and operations. Subsequently, another FCI mechanism is used to aggregate the job cycle time ranges estimated by all experts. The proposed methodology is novel as it is the first attempt to combine XAI and FCI. In addition, the first FCI layer collaborates multiple decision trees, while the second FCI layer collaborates between experts. Furthermore, the two FCI layers collaborates using most possible range (MPR) and partial-consensus fuzzy intersection (PCFI), respectively. The hybrid XAI-FCI approach has been applied to a real case. According to the experimental results, the hybrid XAI-FCI improved the precision of estimating the job cycle time range by up to 41%.
- Open Access
- 7 January 2025
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 136 (5-6) , 2893-2908
Feasibility of a clouds and edge computing scheme for internal due date assignment in advanced manufacturing systems
Most of the existing edge computing applications in manufacturing systems are used for machine status detection, material transportation tracking, resource management, process control, and production planning, but are rarely used to support management activities. To fill this gap, this study designs a cloud and edge computing scheme for internal due date assignment, in which a sales representative visits a customer and negotiates with him/her the due date of a possible order. In the past, such tasks were accomplished by querying a deep learning system on the backend or cloud server, which was affected by difficulties such as cloud computing application licensing, network speed, and bandwidth. To overcome these difficulties, in the cloud and edge computing scheme, a possible order is broken down into lots that are released based on daily quotas. A deep neural network (DNN) is then constructed on the cloud server to estimate the output time of each lot, thereby obtaining the completion time of the possible order for internal due date assignment. A random forest (RF) is also built to approximate the trained DNN for internal due date assignment using edge computing. The cloud and edge computing scheme for internal due date assignment has been experimentally applied to a wafer fabrication case. According to the experimental results, the cloud and edge computing scheme provided a portable, self-contained, and instant solution for internal due date assignment that the common practice and cloud computing counterparts could not achieve. The cloud and edge computing scheme also avoided the potential leakage of confidential production condition data.
- 7 January 2025
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 136 (5-6) , 2893-2908
Open AccessFeasibility of a clouds and edge computing scheme for internal due date assignment in advanced manufacturing systems
Most of the existing edge computing applications in manufacturing systems are used for machine status detection, material transportation tracking, resource management, process control, and production planning, but are rarely used to support management activities. To fill this gap, this study designs a cloud and edge computing scheme for internal due date assignment, in which a sales representative visits a customer and negotiates with him/her the due date of a possible order. In the past, such tasks were accomplished by querying a deep learning system on the backend or cloud server, which was affected by difficulties such as cloud computing application licensing, network speed, and bandwidth. To overcome these difficulties, in the cloud and edge computing scheme, a possible order is broken down into lots that are released based on daily quotas. A deep neural network (DNN) is then constructed on the cloud server to estimate the output time of each lot, thereby obtaining the completion time of the possible order for internal due date assignment. A random forest (RF) is also built to approximate the trained DNN for internal due date assignment using edge computing. The cloud and edge computing scheme for internal due date assignment has been experimentally applied to a wafer fabrication case. According to the experimental results, the cloud and edge computing scheme provided a portable, self-contained, and instant solution for internal due date assignment that the common practice and cloud computing counterparts could not achieve. The cloud and edge computing scheme also avoided the potential leakage of confidential production condition data.
- 16 July 2024
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 134 (1-2) , 113-125
Enhancing the effectiveness of output projection in wafer fabrication using an Industry 4.0 and XAI approach
- 16 July 2024
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 134 (1-2) , 113-125
Enhancing the effectiveness of output projection in wafer fabrication using an Industry 4.0 and XAI approach
- 23 June 2023
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 127 (9-10) , 4111-4121
Optimizing 3D printing facility selection for ubiquitous manufacturing using an evolving fuzzy big data analytics approach
- 23 June 2023
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 127 (9-10) , 4111-4121
Optimizing 3D printing facility selection for ubiquitous manufacturing using an evolving fuzzy big data analytics approach
- Open Access
- 24 March 2023
- Published by Springer Nature in Research Square
Optimizing 3D printing facility selection for ubiquitous manufacturing using an evolving fuzzy big data analytics approach
Three-dimensional (3D) printing has been considered a sustainable and competitive tool for manufacturing products and their components in numerous industries. However, since there are more and more available 3D printing facilities providing unequal services, choosing a suitable 3D printing facility remains a challenging task to manufacturers. In addition, a decision maker also needs to make negotiation between selection criteria that may be conflicting and dependent. To overcome this challenge, this study proposes an evolving fuzzy big data analytics approach. In the proposed methodology, the modified evolving fuzzy assessment (MEFA) method is devised to improve the accuracy of deriving the fuzzy priorities of criteria efficiently. Subsequently, to remove the dependency between criteria, PCA is applied. Finally, the dependency-removed fuzzy technique for order preference via similarity to ideal solutions (FTOPSIS) (Dr-FTOPSIS) is proposed to assess and compare the 3D printing facilities under consideration. The evolving fuzzy big data analytics approach has been applied to a real case of choosing suitable 3D printing facilities in a prosthetic limb supply chain. The experimental results supported the effectiveness of the proposed methodology in improving the derivation process and making a more reasonable choice of suitable 3D printing facilities.
- 24 March 2023
- Published by Springer Nature in Research Square
Open AccessOptimizing 3D printing facility selection for ubiquitous manufacturing using an evolving fuzzy big data analytics approach
Three-dimensional (3D) printing has been considered a sustainable and competitive tool for manufacturing products and their components in numerous industries. However, since there are more and more available 3D printing facilities providing unequal services, choosing a suitable 3D printing facility remains a challenging task to manufacturers. In addition, a decision maker also needs to make negotiation between selection criteria that may be conflicting and dependent. To overcome this challenge, this study proposes an evolving fuzzy big data analytics approach. In the proposed methodology, the modified evolving fuzzy assessment (MEFA) method is devised to improve the accuracy of deriving the fuzzy priorities of criteria efficiently. Subsequently, to remove the dependency between criteria, PCA is applied. Finally, the dependency-removed fuzzy technique for order preference via similarity to ideal solutions (FTOPSIS) (Dr-FTOPSIS) is proposed to assess and compare the 3D printing facilities under consideration. The evolving fuzzy big data analytics approach has been applied to a real case of choosing suitable 3D printing facilities in a prosthetic limb supply chain. The experimental results supported the effectiveness of the proposed methodology in improving the derivation process and making a more reasonable choice of suitable 3D printing facilities.
- Open Access
- 4 May 2022
- Published by Springer Nature in Complex & Intelligent Systems
- Vol. 8 (6) , 5087-5099
Assessing cloud manufacturing applications using an optimally rectified FAHP approach
Cloud Manufacturing (CMfg) is a new manufacturing paradigm that promises to reduce costs, improve data analysis, increase efficiency and flexibility, and provide manufacturers with closer partnerships. However, most past CMfg research has focused on either the information technology infrastructure or the planning and scheduling of a hypothetical CMfg system. In addition, the cost effectiveness of a CMfg application has rarely been assessed. As a result, a manufacturer is not sure whether to adopt a CMfg application or not. To address this issue, an optimally rectified fuzzy analytical hierarchy process (OR-FAHP) approach is proposed in this study to assess a CMfg application. The OR-FAHP approach solves the inconsistency problem of the conventional FAHP method, a well-known technology assessment technique, to make the analysis results more trustable. The OR-FAHP approach has been applied to assess and compare 10 CMfg applications.
- 4 May 2022
- Published by Springer Nature in Complex & Intelligent Systems
- Vol. 8 (6) , 5087-5099
Open AccessAssessing cloud manufacturing applications using an optimally rectified FAHP approach
Cloud Manufacturing (CMfg) is a new manufacturing paradigm that promises to reduce costs, improve data analysis, increase efficiency and flexibility, and provide manufacturers with closer partnerships. However, most past CMfg research has focused on either the information technology infrastructure or the planning and scheduling of a hypothetical CMfg system. In addition, the cost effectiveness of a CMfg application has rarely been assessed. As a result, a manufacturer is not sure whether to adopt a CMfg application or not. To address this issue, an optimally rectified fuzzy analytical hierarchy process (OR-FAHP) approach is proposed in this study to assess a CMfg application. The OR-FAHP approach solves the inconsistency problem of the conventional FAHP method, a well-known technology assessment technique, to make the analysis results more trustable. The OR-FAHP approach has been applied to assess and compare 10 CMfg applications.