Seyed Hamid Reza Pasandideh
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Seyed Hamid Reza Pasandideh has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Seyed Taghi Akhavan Niaki
Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran
3 shared publications - J. Rahmani1 shared publication
Kobra Asadi
Department of Industrial Engineering, Faculty of Engineering, Kharazmi University, Tehran, Iran
1 shared publication- Mohammad Hemmati Far
Department of Industrial & Mechanical Engineering Islamic Azad University Qazvin Branch Qazvin Iran
1 shared publication - Reza Rashidi
Department of Industrial Engineering, Faculty of Industrial and Mechanical Engineering, Islamic Azad University, Qazvin, Iran
1 shared publication - Tahereh Mohammadi
Department of Industrial Engineering, Science and Research Branch, Islamic Azad University, Tehran 1477893855, Iran
1 shared publication
Latest Publications
- 1 January 2017
- Published by Inderscience Publishers in International Journal of Mathematics in Operational Research
- Vol. 10 (3) , 316
A multiproduct EOQ model with permissible delay in payments and shortage within warehouse space constraint: a genetic algorithm approach
In today's business transactions, sometimes customers are allowed to pay in a grace period, i.e., permissible delay in payment occurs. This policy is advantageous both for the suppliers and for the customers. This paper formulates a multi-product economic order quantity (EOQ) problem with an order-quantity-dependent permissible delay in payment. In this problem, the shortage is backlogged and there is a warehouse constraint. We show that the model of the problem is a constrained nonlinear-integer-program and propose a genetic algorithm (GA) to solve it. Moreover, a statistical approach is employed to calibrate the parameters of the GA. A numerical example is presented at the end to not only demonstrate the application of the proposed parameter-tuned GA, but also to verify the results and to show GA performs better than a simulated annealing (SA) approach.
- 1 January 2017
- Published by Inderscience Publishers in International Journal of Mathematics in Operational Research
- Vol. 10 (3) , 316
A multiproduct EOQ model with permissible delay in payments and shortage within warehouse space constraint: a genetic algorithm approach
In today's business transactions, sometimes customers are allowed to pay in a grace period, i.e., permissible delay in payment occurs. This policy is advantageous both for the suppliers and for the customers. This paper formulates a multi-product economic order quantity (EOQ) problem with an order-quantity-dependent permissible delay in payment. In this problem, the shortage is backlogged and there is a warehouse constraint. We show that the model of the problem is a constrained nonlinear-integer-program and propose a genetic algorithm (GA) to solve it. Moreover, a statistical approach is employed to calibrate the parameters of the GA. A numerical example is presented at the end to not only demonstrate the application of the proposed parameter-tuned GA, but also to verify the results and to show GA performs better than a simulated annealing (SA) approach.
- 30 June 2015
- Published by Universidade Federal de Santa Catarina (UFSC) in Iberoamerican Journal of Industrial Engineering
- Vol. 7 (13)
Optimal Selection of Retailers for a Manufacturing Vendor in a Vendor-Managed Inventory System with Genetic Algorithm
In this paper, we consider a two-leveled chain of supply that includes a manufacturer and a few retailers and in this chain VMI (Vendor-Managed Inventory) policy has been used.
- 30 June 2015
- Published by Universidade Federal de Santa Catarina (UFSC) in Iberoamerican Journal of Industrial Engineering
- Vol. 7 (13)
Optimal Selection of Retailers for a Manufacturing Vendor in a Vendor-Managed Inventory System with Genetic Algorithm
In this paper, we consider a two-leveled chain of supply that includes a manufacturer and a few retailers and in this chain VMI (Vendor-Managed Inventory) policy has been used.
- 29 September 2014
- Published by Taylor & Francis in International Journal of Management Science and Engineering Management
- Vol. 11 (1) , 8-21
A priority-based modified encoding–decoding procedure for the design of a bi-objective SC network using meta-heuristic algorithms
This paper aims at a bi-objective optimization of the multi-periodic multi-product supply chain network design (SCND) problem under uncertainty consisting of manufacturing centers, distribution centers, and customer nodes. The problem is considered as a two-stage transportation model while there are several candidate transportation options for each plant. The supposed uncertainty is related to the services of the warehouses and affects the decision making of the SCND that are critical issues. So, the goal is to make the best decisions to maximize the minimum average percentages of products dispatched for each customer in each period while minimizing the sum of strategic, tactical and operational costs. Since the proposed model is of constrained bi-objective mixed-integer nonlinear programming type, we apply a linear programming metric and goal attainment methods to turn the problem into a single-objective model. Each of two methods is separately embedded in simulated annealing, a genetic algorithm, and an imperialist competition algorithm to solve this bi-objective model by MATLAB™ software. Furthermore, we extend a priority-based encoding–decoding method that leads to feasible solutions. The performance of the proposed algorithms is examined on a set of problem instances. Then, some numerical results are provided to demonstrate the algorithm's effectiveness and efficiency further. For this purpose, we propose Duncan's multi-range test and TOPSIS methods.
- 29 September 2014
- Published by Taylor & Francis in International Journal of Management Science and Engineering Management
- Vol. 11 (1) , 8-21
A priority-based modified encoding–decoding procedure for the design of a bi-objective SC network using meta-heuristic algorithms
This paper aims at a bi-objective optimization of the multi-periodic multi-product supply chain network design (SCND) problem under uncertainty consisting of manufacturing centers, distribution centers, and customer nodes. The problem is considered as a two-stage transportation model while there are several candidate transportation options for each plant. The supposed uncertainty is related to the services of the warehouses and affects the decision making of the SCND that are critical issues. So, the goal is to make the best decisions to maximize the minimum average percentages of products dispatched for each customer in each period while minimizing the sum of strategic, tactical and operational costs. Since the proposed model is of constrained bi-objective mixed-integer nonlinear programming type, we apply a linear programming metric and goal attainment methods to turn the problem into a single-objective model. Each of two methods is separately embedded in simulated annealing, a genetic algorithm, and an imperialist competition algorithm to solve this bi-objective model by MATLAB™ software. Furthermore, we extend a priority-based encoding–decoding method that leads to feasible solutions. The performance of the proposed algorithms is examined on a set of problem instances. Then, some numerical results are provided to demonstrate the algorithm's effectiveness and efficiency further. For this purpose, we propose Duncan's multi-range test and TOPSIS methods.
- 11 March 2011
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 56 (9-12) , 1205-1214
A two-echelon single-period inventory control problem under budget constraint
- 11 March 2011
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 56 (9-12) , 1205-1214
A two-echelon single-period inventory control problem under budget constraint
- 29 May 2010
- Published by Springer Nature in Journal of Intelligent Manufacturing
- Vol. 23 (3) , 651-659
Genetic application in a facility location problem with random demand within queuing framework
- 29 May 2010
- Published by Springer Nature in Journal of Intelligent Manufacturing
- Vol. 23 (3) , 651-659
Genetic application in a facility location problem with random demand within queuing framework