Carl Horst Albrecht
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Carl Horst Albrecht has a total of 18 co-authors. Here are the top co-authors by number of shared publications:
- Breno Pinheiro Jacob
UFRJ - Universidade Federal do Rio de Janeiro
4 shared publications Antonio Roberto de Medeiros
Petrobras, Rio de Janeiro, RJ, Brazil
2 shared publications- Aline Aparecida1 shared publication
- Beatriz Souza Leite Pires de Lima
Civil Engineering Program, COPPE/Federal University of Rio de Janeiro, Rio de Janeiro, Brazil
1 shared publication Breno Pinheiro Jacob Federal University of Rio de Janeiro
Federal University of Rio de Janeiro
1 shared publicationBruno Martins Jacovazzo
UFRJ, Rio de Janeiro, RJ, Brazil
1 shared publication
Latest Publications
- Open Access
- 2 December 2024
- Published by Softaliza Tecnologias LTDA in Ibero-Latin American Congress on Computational Methods in Engineering (CILAMCE)
Artificial Neural Networks for Optimization procedures of Mooring System of Floating Platforms
Floating production systems (FPS) are widely used for oil exploitation by offshore industry. Installation of these systems have been advanced to deep and ultra-deep water subject to both extreme and operational environmental conditions. Under these conditions, mooring systems assume a fundamental role of keeping the FPS on the location and thus ensuring the integrity of other systems. Numerical model of these systems requires rigorous nonlinear static and dynamic analysis in the time domain using Finite Element Method (FEM) which have high computational costs. Therefore, an optimization process that may requires hundreds or thousands of analyses of the candidate solutions can take a long time. Thus, this work aims to optimize a mooring system of a floating production system, changing the evaluation of the objective function and the associated constraints from Finite Element Procedure by an Artificial Neural Network, in order to reduce the computational costs. Such reduction of time consuming may favor the accomplishment of several studies of the system in question. Case study presents a real-world scenario and the optimization tool employs the Particle Swarm Optimization (PSO) method. From the results we can see that the replacement of the FEM analyses by ANN meta-model has a high level of accuracy and presents low computational cost.
- 2 December 2024
- Published by Softaliza Tecnologias LTDA in Ibero-Latin American Congress on Computational Methods in Engineering (CILAMCE)
Open AccessArtificial Neural Networks for Optimization procedures of Mooring System of Floating Platforms
Floating production systems (FPS) are widely used for oil exploitation by offshore industry. Installation of these systems have been advanced to deep and ultra-deep water subject to both extreme and operational environmental conditions. Under these conditions, mooring systems assume a fundamental role of keeping the FPS on the location and thus ensuring the integrity of other systems. Numerical model of these systems requires rigorous nonlinear static and dynamic analysis in the time domain using Finite Element Method (FEM) which have high computational costs. Therefore, an optimization process that may requires hundreds or thousands of analyses of the candidate solutions can take a long time. Thus, this work aims to optimize a mooring system of a floating production system, changing the evaluation of the objective function and the associated constraints from Finite Element Procedure by an Artificial Neural Network, in order to reduce the computational costs. Such reduction of time consuming may favor the accomplishment of several studies of the system in question. Case study presents a real-world scenario and the optimization tool employs the Particle Swarm Optimization (PSO) method. From the results we can see that the replacement of the FEM analyses by ANN meta-model has a high level of accuracy and presents low computational cost.
- 22 January 2010
- Published by Springer Nature in Optimization and Engineering
- Vol. 12 (1-2) , 215-235
Tailoring the particle swarm optimization algorithm for the design of offshore oil production risers
- 22 January 2010
- Published by Springer Nature in Optimization and Engineering
- Vol. 12 (1-2) , 215-235
Tailoring the particle swarm optimization algorithm for the design of offshore oil production risers
- 1 January 2008
- Published by ASME International
- p. 273-280
Numerical Simulation of the “Floating Spiral” Pipeline Installation Procedure: Second Stage, Spiral Transportation, Behavior Under Waves
The Floating Spiral pipeline installation method consists basically in winding the pipeline into a huge floating spiral, and towing this assembly to the installation site, where the spiral is then unwound and lowered to the seabed. In this method the pipeline is fabricated onshore, as the spiral is created, under well controlled conditions and relatively relaxed time constraints. Therefore the welds can be better inspected, which allows for optimal control of quality in pipeline manufacturing. The first stage of the installation process by this method consists in setting the pipeline afloat and winding it elastically to form a large flat spiral. This stage is studied in a companion paper [1], to be also presented at IPC2008. The second stage consists in towing the floating spiral pipeline employing standard tugboats before laying it at the installation site. The objective of this work is, therefore, to present results of parametric studies for a large length pipeline at this second stage of the Floating Spiral method. The focus now is in the pipeline behavior under wave environmental conditions during transportation. Several numerical simulations are performed and the results are discussed and compared.
- 1 January 2008
- Published by ASME International
- p. 273-280
Numerical Simulation of the “Floating Spiral” Pipeline Installation Procedure: Second Stage, Spiral Transportation, Behavior Under Waves
The Floating Spiral pipeline installation method consists basically in winding the pipeline into a huge floating spiral, and towing this assembly to the installation site, where the spiral is then unwound and lowered to the seabed. In this method the pipeline is fabricated onshore, as the spiral is created, under well controlled conditions and relatively relaxed time constraints. Therefore the welds can be better inspected, which allows for optimal control of quality in pipeline manufacturing. The first stage of the installation process by this method consists in setting the pipeline afloat and winding it elastically to form a large flat spiral. This stage is studied in a companion paper [1], to be also presented at IPC2008. The second stage consists in towing the floating spiral pipeline employing standard tugboats before laying it at the installation site. The objective of this work is, therefore, to present results of parametric studies for a large length pipeline at this second stage of the Floating Spiral method. The focus now is in the pipeline behavior under wave environmental conditions during transportation. Several numerical simulations are performed and the results are discussed and compared.
- 1 January 2008
- Published by ASME International
- p. 247-256
Numerical Simulation of the ‘Floating Spiral’ Pipeline Installation Procedure: First Stage, Spiral Assembly
The underlying concept for the Floating Spiral pipeline installation method is to wind the pipeline into a huge floating spiral, and then tow this assembly to the installation site, where the spiral is then unwound and lowered to the seabed in a single operation. In this method the pipes are fabricated on shore, which allows for optimal control of costs and quality in pipeline manufacturing. The first stage of the installation process by this method consists in setting the pipeline afloat and winding it elastically to form a large flat spiral, which is then ready to be towed to the installation site by standard tugboats. The objective of this work is to present results of studies for a long pipeline length at this first stage of the Floating Spiral method. The focus here is the process of moving the pipeline around a fixed structure to wind it and form the floating spiral. Problems related to modeling of contact between pipeline and its guides at the first spiral cycle, as well as contact between further pipeline cycles, are rigorously analyzed. Several numerical simulations are performed; the results are presented and discussed. Other stages of this installation method have also been studied, and are presented in a companion paper [1].
- 1 January 2008
- Published by ASME International
- p. 247-256
Numerical Simulation of the ‘Floating Spiral’ Pipeline Installation Procedure: First Stage, Spiral Assembly
The underlying concept for the Floating Spiral pipeline installation method is to wind the pipeline into a huge floating spiral, and then tow this assembly to the installation site, where the spiral is then unwound and lowered to the seabed in a single operation. In this method the pipes are fabricated on shore, which allows for optimal control of costs and quality in pipeline manufacturing. The first stage of the installation process by this method consists in setting the pipeline afloat and winding it elastically to form a large flat spiral, which is then ready to be towed to the installation site by standard tugboats. The objective of this work is to present results of studies for a long pipeline length at this first stage of the Floating Spiral method. The focus here is the process of moving the pipeline around a fixed structure to wind it and form the floating spiral. Problems related to modeling of contact between pipeline and its guides at the first spiral cycle, as well as contact between further pipeline cycles, are rigorously analyzed. Several numerical simulations are performed; the results are presented and discussed. Other stages of this installation method have also been studied, and are presented in a companion paper [1].
- 1 January 2003
- Published by ASME International
- p. 621-626
Computational Systems for Offshore Pipeline Launching Simulations
Computational systems have been developed to help the BGL-1 crew to perform safe mooring procedures. They calculate the deformed catenary configuration of all mooring lines, and simulate the pipeline launching operation itself, regarding the subsea interferences and the local environmental conditions. An onboard real case validation test was carried out and a comparison between the two systems was evaluated, with good agreement between the results of several mooring line parameters.
- 1 January 2003
- Published by ASME International
- p. 621-626
Computational Systems for Offshore Pipeline Launching Simulations
Computational systems have been developed to help the BGL-1 crew to perform safe mooring procedures. They calculate the deformed catenary configuration of all mooring lines, and simulate the pipeline launching operation itself, regarding the subsea interferences and the local environmental conditions. An onboard real case validation test was carried out and a comparison between the two systems was evaluated, with good agreement between the results of several mooring line parameters.