Shujin Jia
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Shujin Jia has a total of 8 co-authors. Here are the top co-authors by number of shared publications:
B. Du
Department of Automation , Shanghai Jiao Tong University, and Key Laboratory of System Control and Information Processing, Ministry of Education of China , Shanghai , China ; Research Institute of Automation, Academy of Baoshan Iron & Steel Co., Ltd. , Shanghai , China
1 shared publicationBin Du
Department of Automation, Shanghai Jiao Tong University, Shanghai, China
1 shared publicationG.K. Yang
Department of Automation , Shanghai Jiao Tong University, and Key Laboratory of System Control and Information Processing, Ministry of Education of China , Shanghai , China
1 shared publicationGenke Yang
Department of Automation, Shanghai Jiao Tong University, Shanghai, China
1 shared publicationJ. Yi
School of Information Science and Engineering , Northeastern University , Shenyang , China ; Research Institute of Automation, Academy of Baoshan Iron & Steel Co., Ltd. , Shanghai , China
1 shared publicationJ. Zhu
School of Information Science and Engineering , Northeastern University , Shenyang , China ; Research Institute of Automation, Academy of Baoshan Iron & Steel Co., Ltd. , Shanghai , China
1 shared publication
Latest Publications
- 1 February 2013
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 51 (3) , 667-681
A multi-objective optimisation algorithm for the hot rolling batch scheduling problem
The hot rolling batch scheduling problem is a hard problem in the steel industry. In this paper, the problem is formulated as a multi-objective prize collecting vehicle routing problem (PCVRP) model. In order to avoid the selection of weight coefficients encountered in single objective optimisation, a multi-objective optimisation algorithm based on Pareto-dominance is used to solve this model. Firstly, the Pareto ℳ𝒜𝒳–ℳℐ𝒩 Ant System (P-ℳℳAS), which is a brand new multi-objective ant colony optimisation algorithm, is proposed to minimise the penalties caused by jumps between adjacent slabs, and simultaneously maximise the prizes collected. Then a multi-objective decision-making approach based on TOPSIS is used to select a final rolling batch from the Pareto-optimal solutions provided by P-ℳℳAS. The experimental results using practical production data from Shanghai Baoshan Iron & Steel Co., Ltd. have indicated that the proposed model and algorithm are effective and efficient.
- 1 February 2013
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 51 (3) , 667-681
A multi-objective optimisation algorithm for the hot rolling batch scheduling problem
The hot rolling batch scheduling problem is a hard problem in the steel industry. In this paper, the problem is formulated as a multi-objective prize collecting vehicle routing problem (PCVRP) model. In order to avoid the selection of weight coefficients encountered in single objective optimisation, a multi-objective optimisation algorithm based on Pareto-dominance is used to solve this model. Firstly, the Pareto ℳ𝒜𝒳–ℳℐ𝒩 Ant System (P-ℳℳAS), which is a brand new multi-objective ant colony optimisation algorithm, is proposed to minimise the penalties caused by jumps between adjacent slabs, and simultaneously maximise the prizes collected. Then a multi-objective decision-making approach based on TOPSIS is used to select a final rolling batch from the Pareto-optimal solutions provided by P-ℳℳAS. The experimental results using practical production data from Shanghai Baoshan Iron & Steel Co., Ltd. have indicated that the proposed model and algorithm are effective and efficient.
- 9 December 2011
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 61 (5-8) , 487-501
A decomposition-based hierarchical optimization algorithm for hot rolling batch scheduling problem
- 9 December 2011
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 61 (5-8) , 487-501
A decomposition-based hierarchical optimization algorithm for hot rolling batch scheduling problem