JBJan Van Belle
Jan Van Belle
*This is an algorithmically generated author record based on publicly available information.
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Jan Van Belle has a total of 10 co-authors. Here are the top co-authors by number of shared publications:
- Paul Valckenaers
Katholieke Universiteit Leuven
4 shared publications - Bart Saint Germain
KU Leuven
3 shared publications - Hendrik Van Brussel
Katholieke Universiteit Leuven
2 shared publications - Juan M. Novas
INTEC (UNL-CONICET)
2 shared publications - Dirk Cattrysse
KU Leuven
1 shared publication - Johan Philips
KU Leuven
1 shared publication
Latest Publications
- 1 January 2013
- Published by Springer Nature
- p. 3-17
A Collaborative Framework between a Scheduling System and a Holonic Manufacturing Execution System
- 1 January 2013
- Published by Springer Nature
- p. 3-17
A Collaborative Framework between a Scheduling System and a Holonic Manufacturing Execution System
- 1 May 2012
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 45 (6) , 728-733
An Approach for the Integration of a Scheduling System and a Multi-Agent Manufacturing Execution System. Towards a Collaborative Framework.
- 1 May 2012
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 45 (6) , 728-733
An Approach for the Integration of a Scheduling System and a Multi-Agent Manufacturing Execution System. Towards a Collaborative Framework.
- 1 January 2012
- Published by Springer Nature
- p. 1-20
A Service-Oriented Approach for Holonic Manufacturing Control and Beyond
- 1 January 2012
- Published by Springer Nature
- p. 1-20
A Service-Oriented Approach for Holonic Manufacturing Control and Beyond
- 1 January 2010
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 43 (4) , 90-95
Cooperation between a Holonic Schedule Execution System and the i2 Factory Planner
- 1 January 2010
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 43 (4) , 90-95
Cooperation between a Holonic Schedule Execution System and the i2 Factory Planner