Cristina Batalla-García
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Cristina Batalla-García has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Joaquín Bautista
ETSEIB-UPC
8 shared publications - Rocío Alfaro-Pozo
ETSEIB-UPC
8 shared publications - Alberto Cano
Nissan Chair, Universitat Politècnica de Catalunya
2 shared publications - Sara María Llovera-Laborda
Universitat Politecnica de Catalunya
1 shared publication
Latest Publications
- Open Access
- 7 January 2016
- Published by Springer Nature in Progress in Artificial Intelligence
- Vol. 5 (1) , 35
Erratum to: GRASP for sequencing mixed models in an assembly line with work overload, useless time and production regularity
- 7 January 2016
- Published by Springer Nature in Progress in Artificial Intelligence
- Vol. 5 (1) , 35
Open AccessErratum to: GRASP for sequencing mixed models in an assembly line with work overload, useless time and production regularity
- Open Access
- 1 January 2016
- Published by Springer Nature in International Journal of Computational Intelligence Systems
- Vol. 9 (4) , 788-799
Maximizing comfort in Assembly Lines with temporal, spatial and ergonomic attributes
We aim at maximizing the comfort of operators in mixed-model assembly lines. To achieve this goal, we evaluate two assembly line balancing models: the first that minimizes the maximum ergonomic risk and the second one that minimizes the average absolute deviations of ergonomic risk. Through a case study we compare the results of the two models by two...
- 1 January 2016
- Published by Springer Nature in International Journal of Computational Intelligence Systems
- Vol. 9 (4) , 788-799
Open AccessMaximizing comfort in Assembly Lines with temporal, spatial and ergonomic attributes
We aim at maximizing the comfort of operators in mixed-model assembly lines. To achieve this goal, we evaluate two assembly line balancing models: the first that minimizes the maximum ergonomic risk and the second one that minimizes the average absolute deviations of ergonomic risk. Through a case study we compare the results of the two models by two...
- Open Access
- 15 December 2015
- Published by Springer Nature in Progress in Artificial Intelligence
- Vol. 5 (1) , 27-33
GRASP for sequencing mixed models in an assembly line with work overload, useless time and production regularity
- 15 December 2015
- Published by Springer Nature in Progress in Artificial Intelligence
- Vol. 5 (1) , 27-33
Open AccessGRASP for sequencing mixed models in an assembly line with work overload, useless time and production regularity
- 14 November 2015
- Published by Springer Nature
- p. 278-288
GRASP Approach to a Min-Max Problem of Ergonomic Risk in Restricted Assembly Lines
- 14 November 2015
- Published by Springer Nature
- p. 278-288
GRASP Approach to a Min-Max Problem of Ergonomic Risk in Restricted Assembly Lines
- Open Access
- 5 February 2015
- Published by Springer Nature
- p. 85-93
Ergonomic Risk Minimisation in Assembly Line Balancing
- 5 February 2015
- Published by Springer Nature
- p. 85-93
Open AccessErgonomic Risk Minimisation in Assembly Line Balancing
- 5 February 2015
- Published by Springer Nature
- p. 3-10
Mixed-Model Sequencing Problem Improving Labour Conditions
- 5 February 2015
- Published by Springer Nature
- p. 3-10
Mixed-Model Sequencing Problem Improving Labour Conditions
- 26 July 2014
- Published by Springer Nature
- p. 261-268
Incorporating the Work Pace Concept into the MMSP-W
- 26 July 2014
- Published by Springer Nature
- p. 261-268
Incorporating the Work Pace Concept into the MMSP-W
- Open Access
- 1 January 2013
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 46 (9) , 1908-1913
Hybrid procedure based on Bounded Dynamic Programming and Linear Programming for solving a variant of the MMSP-W
- 1 January 2013
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 46 (9) , 1908-1913
Open AccessHybrid procedure based on Bounded Dynamic Programming and Linear Programming for solving a variant of the MMSP-W