Shalini Shukla
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Shalini Shukla has a total of 3 co-authors. Here are the top co-authors by number of shared publications:
- Chandra Shekhar
Department of Mathematics, Birla Institute of Technology and Science Pilani, Pilani, India
4 shared publications - Madhu Jain
Indian Institute of Technology Roorkee
3 shared publications - Madhu Jain
Indian Institute of Technology Roorkee
1 shared publication
Latest Publications
- 1 October 2016
- Published by EDP Sciences in RAIRO - Operations Research
- Vol. 50 (4-5) , 891-907
N-policy for a repairable redundant machining system with controlled rates
The present investigation deals with a multi-component machining system operating under N-policy. There is a provision of k type of mixed standbys units and maintenance crew consisting of permanent repairman as well as removable additional repairmen. The life time and repair time of the units are exponentially distributed with interdependent rates. The permanent repairman can start the repair only when N failed units are accumulated in the system. As soon as a unit fails, it is replaced by an available standby unit. In case when all the standby units are exhausted, the machining system starts to function in a degraded mode due to overload. Markov model is developed by constructing the governing transient state equations which are solved by using Runge−Kutta method. Various performance measures viz. queue size distribution, expected number of failed units, cost function, etc. are evaluated. By taking numerical illustration, numerical results are computed and also depicted with the help of graphs and figures.
- 1 October 2016
- Published by EDP Sciences in RAIRO - Operations Research
- Vol. 50 (4-5) , 891-907
N-policy for a repairable redundant machining system with controlled rates
The present investigation deals with a multi-component machining system operating under N-policy. There is a provision of k type of mixed standbys units and maintenance crew consisting of permanent repairman as well as removable additional repairmen. The life time and repair time of the units are exponentially distributed with interdependent rates. The permanent repairman can start the repair only when N failed units are accumulated in the system. As soon as a unit fails, it is replaced by an available standby unit. In case when all the standby units are exhausted, the machining system starts to function in a degraded mode due to overload. Markov model is developed by constructing the governing transient state equations which are solved by using Runge−Kutta method. Various performance measures viz. queue size distribution, expected number of failed units, cost function, etc. are evaluated. By taking numerical illustration, numerical results are computed and also depicted with the help of graphs and figures.
- Open Access
- 5 February 2016
- Published by Springer Nature in Journal of Industrial Engineering International
- Vol. 12 (2) , 145-157
A time-shared machine repair problem with mixed spares under N-policy
- 5 February 2016
- Published by Springer Nature in Journal of Industrial Engineering International
- Vol. 12 (2) , 145-157
Open AccessA time-shared machine repair problem with mixed spares under N-policy
- 23 December 2015
- Published by Springer Nature in Proceedings of the National Academy of Sciences, India Section A: Physical Sciences
- Vol. 86 (1) , 21-31
Queueing Analysis of Machine Repair Problem with Controlled Rates and Working Vacation Under F-Policy
- 23 December 2015
- Published by Springer Nature in Proceedings of the National Academy of Sciences, India Section A: Physical Sciences
- Vol. 86 (1) , 21-31
Queueing Analysis of Machine Repair Problem with Controlled Rates and Working Vacation Under F-Policy
- 10 July 2013
- Published by Springer Nature in OPSEARCH
- Vol. 51 (3) , 416-433
Machine repair problem with an unreliable server and controlled arrival of failed machines
- 10 July 2013
- Published by Springer Nature in OPSEARCH
- Vol. 51 (3) , 416-433
Machine repair problem with an unreliable server and controlled arrival of failed machines