Richard Mielke
Research Subjects
Research Interests
Richard Mielke has a total of 27 co-authors. Here are the top co-authors by number of shared publications:
- Brent Keil
Corporate Chief Engineer, Northwest Pipe Company, 5721 SE Columbia Way, Suite 200, Vancouver, WA 98661
10 shared publications - Shah Rahman
Senior Conveyance Engineer, CH2M Hill, 1100 112th Ave NE, Suite 400, Bellevue, WA 98004
6 shared publications - Glenn Davidenko
Multisite Engineering Manager, Northwest Pipe Company, 351 Longhorn Rd., Saginaw, TX 76179
3 shared publications - Gregory C. Sarvanis
University of Thessaly, Volos, Greece
3 shared publications - Neal Kelemen
Northwest Pipe Co., Northwest Pipe Company
3 shared publications - Spyros A. Karamanos
Department of Mechanical Engineering, University of Thessaly, Volos, Greece
3 shared publications
Latest Publications
- 31 August 2023
- Published by Morressier GmbH
Safeguarding the Integrity of Large-Diameter Steel Water Pipelines Subjected to Differential Ground Settlements
The paper describes the application of a novel and promising concept, aimed at absorbing ground-induced displacements due to soil subsidence in b | POSTER
- 31 August 2023
- Published by Morressier GmbH
Safeguarding the Integrity of Large-Diameter Steel Water Pipelines Subjected to Differential Ground Settlements
The paper describes the application of a novel and promising concept, aimed at absorbing ground-induced displacements due to soil subsidence in b | POSTER
- 31 August 2023
- Published by Morressier GmbH
Strain-based Design of a Large-Diameter Steel Water Pipeline Crossing Ground Settlement Areas
This paper describes the structural design of a large-diameter buried steel pipeline crossing two areas of substantial soil settlement, which imp | POSTER
- 31 August 2023
- Published by Morressier GmbH
Strain-based Design of a Large-Diameter Steel Water Pipeline Crossing Ground Settlement Areas
This paper describes the structural design of a large-diameter buried steel pipeline crossing two areas of substantial soil settlement, which imp | POSTER
- 11 July 2018
- Published by American Society of Civil Engineers (ASCE)
- p. 433-443
Experimental Results of Steel Lap Welded Pipe Joints in Seismic Conditions
Welded lap joints are commonly used in large-diameter steel pipelines for water transmission. Their structural performance constitutes a key issue for safeguarding pipeline structural integrity with no loss of pressure containment, required even after a severe seismic event. Full-scale experiments are presented herein, and are part of an extensive project sponsored and coordinated by Northwest Pipe Co. on the structural performance of welded lap joints under severe ground-induced (seismic) actions. In the companion paper “Numerical Simulation of Steel Lap Welded Pipe Joint Behavior in Seismic Conditions” numerical simulation of the experiments are presented. The paper describes a series of large-scale experiments on welded lap joints in 25.75 in outside diameter steel pipes, with wall thickness of 0.135 in (3 specimens) or 0.250 in (3 specimens). The specimens were internally pressurized to 40% of yield pressure, and then subjected to four-point bending. Measurements of the bending load, characteristic displacements, and local strains at the joint area are reported. In all tests, the welded lap joints tested were capable of sustaining remarkable bending deformation, without any loss of pressure containment. This behavior supports the argument that welded lap joints, if appropriately constructed, can be used in seismic areas where severe and permanent ground-induced actions in the pipeline may occur.
- 11 July 2018
- Published by American Society of Civil Engineers (ASCE)
- p. 433-443
Experimental Results of Steel Lap Welded Pipe Joints in Seismic Conditions
Welded lap joints are commonly used in large-diameter steel pipelines for water transmission. Their structural performance constitutes a key issue for safeguarding pipeline structural integrity with no loss of pressure containment, required even after a severe seismic event. Full-scale experiments are presented herein, and are part of an extensive project sponsored and coordinated by Northwest Pipe Co. on the structural performance of welded lap joints under severe ground-induced (seismic) actions. In the companion paper “Numerical Simulation of Steel Lap Welded Pipe Joint Behavior in Seismic Conditions” numerical simulation of the experiments are presented. The paper describes a series of large-scale experiments on welded lap joints in 25.75 in outside diameter steel pipes, with wall thickness of 0.135 in (3 specimens) or 0.250 in (3 specimens). The specimens were internally pressurized to 40% of yield pressure, and then subjected to four-point bending. Measurements of the bending load, characteristic displacements, and local strains at the joint area are reported. In all tests, the welded lap joints tested were capable of sustaining remarkable bending deformation, without any loss of pressure containment. This behavior supports the argument that welded lap joints, if appropriately constructed, can be used in seismic areas where severe and permanent ground-induced actions in the pipeline may occur.
- 11 July 2018
- Published by American Society of Civil Engineers (ASCE)
- p. 444-455
Numerical Simulation of Steel Lap Welded Pipe Joint Behavior in Seismic Conditions
The present paper reports numerical calculations which complement experimental work reported in the companion paper entitled “Experimental Results of Steel Lap Welded Joints in Seismic Conditions”, also presented in ASCE 2018 Pipelines Conference. Nonlinear finite element simulation tools are employed to investigate the bending capacity of internally-pressurized welded-lap 24-in-diameter pipeline joints, considering two thicknesses (0.135 in and 0.250 in). The work presented in this paper: (a) simulates numerically the seven large-scale experiments presented in detail in the companion paper; (b) elucidates some interesting issues of welded lap joint behavior under severe bending deformation. In the final part of the paper, based on the above experimental and numerical results, a discussion is offered on the design of welded lap joints in pipelines constructed in seismic areas.
- 11 July 2018
- Published by American Society of Civil Engineers (ASCE)
- p. 444-455
Numerical Simulation of Steel Lap Welded Pipe Joint Behavior in Seismic Conditions
The present paper reports numerical calculations which complement experimental work reported in the companion paper entitled “Experimental Results of Steel Lap Welded Joints in Seismic Conditions”, also presented in ASCE 2018 Pipelines Conference. Nonlinear finite element simulation tools are employed to investigate the bending capacity of internally-pressurized welded-lap 24-in-diameter pipeline joints, considering two thicknesses (0.135 in and 0.250 in). The work presented in this paper: (a) simulates numerically the seven large-scale experiments presented in detail in the companion paper; (b) elucidates some interesting issues of welded lap joint behavior under severe bending deformation. In the final part of the paper, based on the above experimental and numerical results, a discussion is offered on the design of welded lap joints in pipelines constructed in seismic areas.
- 11 July 2016
- Published by American Society of Civil Engineers (ASCE)
- p. 1279-1289
Lessons Learned Installing a Critical Large-Diameter Spiral Welded Steel Water Pipe under New York Harbor
The Port of New York and New Jersey (PANYNJ) owns one of the most heavily used water transportation corridors in the World. It takes in nearly 1/3 of all the Eastern US shipping trade. The Anchorage Channel is the main “road-way” into the Metro New York Harbor from the Verrazano Narrows Bridge to the channel’s confluence with the Port Jersey Channel. In 2014, $125 Billion Dollars worth of goods and commodities were shipped into this Port. In the late 1990’s the Port Authority recognized that cargo volumes could double within the next 20 years and along with that the usage fees generated by the increased cargo. To accommodate the larger “mega” ships that were being designed and built for the 21st Century for these increased loads, the Anchorage Channel needed to be dredged to accommodate ships with drafts exceeding 50 feet.
- 11 July 2016
- Published by American Society of Civil Engineers (ASCE)
- p. 1279-1289
Lessons Learned Installing a Critical Large-Diameter Spiral Welded Steel Water Pipe under New York Harbor
The Port of New York and New Jersey (PANYNJ) owns one of the most heavily used water transportation corridors in the World. It takes in nearly 1/3 of all the Eastern US shipping trade. The Anchorage Channel is the main “road-way” into the Metro New York Harbor from the Verrazano Narrows Bridge to the channel’s confluence with the Port Jersey Channel. In 2014, $125 Billion Dollars worth of goods and commodities were shipped into this Port. In the late 1990’s the Port Authority recognized that cargo volumes could double within the next 20 years and along with that the usage fees generated by the increased cargo. To accommodate the larger “mega” ships that were being designed and built for the 21st Century for these increased loads, the Anchorage Channel needed to be dredged to accommodate ships with drafts exceeding 50 feet.
- 17 August 2015
- Published by American Society of Civil Engineers (ASCE)
- p. 586-593
Stulling of Large Diameter Steel Water Pipe—What It Is and What It Is Not
Large diameter steel water pipe is typically supplied with temporary internal bracing or “stulls” that have been shown to prevent damage to the pipe, particularly rigid lining and coating systems such as cement mortar lining and coating, during transportation and handling. They are also provided to assist with maintaining the shape of pipe ends to within AWWA C200 requirements for field jointing. Stulls are typically manufactured from rough cut lumber and on occasion, steel angle or poles. Stull sets are typically placed at pipe ends and at mid points, depending on diameter and thickness of the pipe. Stull sets typically consist of a minimum of one to three sets of stulls with various stiffeners, and may include shoes and blocks to assure the internal bracing will retain functionality during the handling process. Manufacturers may have variations in their stulling means and methods but all have the same goal of providing pipe integrity during handling and transport, and pipe-end roundness at the ditch, ready for joint assembly, installation and backfilling. Stulls may assist holding the pipe shape until side fill support is developed during backfill placement. Loads on top of the pipe, including construction loads, are distributed to the soil envelope around and adjacent to the pipe. The assumption that pipe stulls will limit or eliminate deflection has lead to misunderstandings, false expectations and even improper pipe installation due to over reliance on a stulling system’s ability to limit deflection of the pipe. Pipe stulls are not in themselves designed to withstand the unknown loadings generated by depth of soil cover or various construction equipment and vehicles during installation. This paper will illustrate the installation of stull sets at the factory, review their intended function, discuss flexible pipe deflection control methods and review installation requirements of the AWWA C604 buried steel pipe installation standard.
- 17 August 2015
- Published by American Society of Civil Engineers (ASCE)
- p. 586-593
Stulling of Large Diameter Steel Water Pipe—What It Is and What It Is Not
Large diameter steel water pipe is typically supplied with temporary internal bracing or “stulls” that have been shown to prevent damage to the pipe, particularly rigid lining and coating systems such as cement mortar lining and coating, during transportation and handling. They are also provided to assist with maintaining the shape of pipe ends to within AWWA C200 requirements for field jointing. Stulls are typically manufactured from rough cut lumber and on occasion, steel angle or poles. Stull sets are typically placed at pipe ends and at mid points, depending on diameter and thickness of the pipe. Stull sets typically consist of a minimum of one to three sets of stulls with various stiffeners, and may include shoes and blocks to assure the internal bracing will retain functionality during the handling process. Manufacturers may have variations in their stulling means and methods but all have the same goal of providing pipe integrity during handling and transport, and pipe-end roundness at the ditch, ready for joint assembly, installation and backfilling. Stulls may assist holding the pipe shape until side fill support is developed during backfill placement. Loads on top of the pipe, including construction loads, are distributed to the soil envelope around and adjacent to the pipe. The assumption that pipe stulls will limit or eliminate deflection has lead to misunderstandings, false expectations and even improper pipe installation due to over reliance on a stulling system’s ability to limit deflection of the pipe. Pipe stulls are not in themselves designed to withstand the unknown loadings generated by depth of soil cover or various construction equipment and vehicles during installation. This paper will illustrate the installation of stull sets at the factory, review their intended function, discuss flexible pipe deflection control methods and review installation requirements of the AWWA C604 buried steel pipe installation standard.
- 17 August 2015
- Published by American Society of Civil Engineers (ASCE)
- p. 1407-1418
Lessons Learned in the Design, Manufacture, Shipping, and Installation of the 108-inch Integrated Pipeline (IPL) Section 15-1
The Tarrant Regional Water District (TRWD) and the City of Dallas Water Utilities (DWU) are engaged in the planning, design and implementation of a 350 MGD raw water transmission system. Referred to as the Integrated Pipeline Project (IPL), the system consists of approximately 150 miles of 84- to primarily 108-inch diameter pipeline, a 5 mile 120-inch diameter tunnel, six 100—350 MGD pump stations, one 450 MG balancing reservoir, and ancillary facilities. When complete, the “integrated” system will provide a critically important source of water for the rapidly growing Dallas-Fort Worth Metroplex for the next five decades and beyond. After years of study, followed by design and construction of a 2 mile, 108-inch steel water pipe demonstration project, the Line J Project, the first segment of the pipeline, Section 15-1, bid in February 2014 and was awarded in March 2014. Steel pipe was chosen for the construction. Pipelines of this diameter and length are not common and come with their own set of challenges from the design, manufacture, shipping and installation standpoints. This paper will review design of this piping material and the practical aspects of furnishing and installing a line of this magnitude, with particular emphasis on lessons learned on both the Line J and the Section 15-1 Projects from the view point of the Owners, Engineer and Manufacturer.
- 17 August 2015
- Published by American Society of Civil Engineers (ASCE)
- p. 1407-1418
Lessons Learned in the Design, Manufacture, Shipping, and Installation of the 108-inch Integrated Pipeline (IPL) Section 15-1
The Tarrant Regional Water District (TRWD) and the City of Dallas Water Utilities (DWU) are engaged in the planning, design and implementation of a 350 MGD raw water transmission system. Referred to as the Integrated Pipeline Project (IPL), the system consists of approximately 150 miles of 84- to primarily 108-inch diameter pipeline, a 5 mile 120-inch diameter tunnel, six 100—350 MGD pump stations, one 450 MG balancing reservoir, and ancillary facilities. When complete, the “integrated” system will provide a critically important source of water for the rapidly growing Dallas-Fort Worth Metroplex for the next five decades and beyond. After years of study, followed by design and construction of a 2 mile, 108-inch steel water pipe demonstration project, the Line J Project, the first segment of the pipeline, Section 15-1, bid in February 2014 and was awarded in March 2014. Steel pipe was chosen for the construction. Pipelines of this diameter and length are not common and come with their own set of challenges from the design, manufacture, shipping and installation standpoints. This paper will review design of this piping material and the practical aspects of furnishing and installing a line of this magnitude, with particular emphasis on lessons learned on both the Line J and the Section 15-1 Projects from the view point of the Owners, Engineer and Manufacturer.
- 1 August 2013
- Published by American Society of Civil Engineers (ASCE) in Journal of Pipeline Systems Engineering and Practice
- Vol. 4 (3) , 156-169
Design, Analysis, and Full-Scale Testing of the Rolled Groove Gasket Joint System in AWWA C303 Bar-Wrapped, Steel-Cylinder Concrete Pressure Pipe
This paper presents full-scale testing results of a 1,370-mm (54-in.) nominal diameter prototype rolled groove joint incorporated into a bar-wrapped concrete pressure pipe manufactured to American Water Works Association (AWWA) standard C303 specifications. The acceptance criteria for the prototype were no leakage or deformation at 1 MPa (150 psi) working pressure and 1.6 MPa (225 psi) transient pressure. The joint was also required to be watertight at 2 MPa (300 psi), which represented a factor of safety of 2 over working pressure. A 25.4-mm (1-in.) pull was used in the full-scale test to reflect the worst case scenario of an angularly deflected joint in the field to assess its ability to tolerate unsymmetrical fit. The test pipe was loaded in excess of its circumferential elastic limit, without any visible leakage at the joint. The three-dimensional (3D) nonlinear numerical simulation of the pipe joint was created by using software, resulting in acceptable comparisons with the experimental data. Data collection instrumentation included strain gauges, cable displacement transducers, and acoustic emissions (AE) technology. Joint design included an optimal stab depth for the spigot and appropriate rod-wrap termination design in both the bell and spigot to provide sufficient stiffness. The strain in the internal and external cement mortar layers remained below the ultimate strain of 0.2% up to 1.7 MPa (250 psi). A steel cylinder with complete-penetration helical butt welded seams, which will allow a groove to be roll-formed on the cylinder, with a minimum cylinder thickness of 3.4 mm (), are noted as minimum requirements for the joint.- 1 August 2013
- Published by American Society of Civil Engineers (ASCE) in Journal of Pipeline Systems Engineering and Practice
- Vol. 4 (3) , 156-169
Design, Analysis, and Full-Scale Testing of the Rolled Groove Gasket Joint System in AWWA C303 Bar-Wrapped, Steel-Cylinder Concrete Pressure Pipe
This paper presents full-scale testing results of a 1,370-mm (54-in.) nominal diameter prototype rolled groove joint incorporated into a bar-wrapped concrete pressure pipe manufactured to American Water Works Association (AWWA) standard C303 specifications. The acceptance criteria for the prototype were no leakage or deformation at 1 MPa (150 psi) working pressure and 1.6 MPa (225 psi) transient pressure. The joint was also required to be watertight at 2 MPa (300 psi), which represented a factor of safety of 2 over working pressure. A 25.4-mm (1-in.) pull was used in the full-scale test to reflect the worst case scenario of an angularly deflected joint in the field to assess its ability to tolerate unsymmetrical fit. The test pipe was loaded in excess of its circumferential elastic limit, without any visible leakage at the joint. The three-dimensional (3D) nonlinear numerical simulation of the pipe joint was created by using software, resulting in acceptable comparisons with the experimental data. Data collection instrumentation included strain gauges, cable displacement transducers, and acoustic emissions (AE) technology. Joint design included an optimal stab depth for the spigot and appropriate rod-wrap termination design in both the bell and spigot to provide sufficient stiffness. The strain in the internal and external cement mortar layers remained below the ultimate strain of 0.2% up to 1.7 MPa (250 psi). A steel cylinder with complete-penetration helical butt welded seams, which will allow a groove to be roll-formed on the cylinder, with a minimum cylinder thickness of 3.4 mm (), are noted as minimum requirements for the joint.- 11 June 2013
- Published by American Society of Civil Engineers (ASCE)
- p. 30-41
Large-Diameter Transmission Pipeline Corrosion Control State-of-the-Art: Advances in the Steel Water Pipe Industry
Various studies in the past 15 years have highlighted the dire consequences of failing to proactively protect buried metallic water distribution and transmission infrastructure from the effects of corrosion. Metallic municipal pipelines are composed of cast and ductile iron, composite concrete pressure pipes, and steel pipe. For more than a hundred years, the buried steel pipe industry has employed effective corrosion protection, both on the inside and outside walls of pipelines. Lines more than 100 years old serve as testimony of the effectiveness of these systems. Both rigid cementitious and flexible dielectric corrosion barriers - combined with cathodic protection, when required - have ensured long service lives. By the 1940's, the American Water Works Association (AWWA) had published two standards for corrosion protection of steel pipes, one for cementitious systems and the other for dielectric systems. With advances in technology, many other technologies have been added to the list of standards, the most recent as recently as 2008. This paper will provide an update on the state-of-the-art lining and coating systems currently specified for steel pipe by the engineering community at large. AWWA, NACE International, and other standards-writing organizations' documents will be discussed. Focus on corrosion prevention through surface preparation for lining and coating applications, quality control, handling, repair, joint completion, and installation will be highlighted.
- 11 June 2013
- Published by American Society of Civil Engineers (ASCE)
- p. 30-41
Large-Diameter Transmission Pipeline Corrosion Control State-of-the-Art: Advances in the Steel Water Pipe Industry
Various studies in the past 15 years have highlighted the dire consequences of failing to proactively protect buried metallic water distribution and transmission infrastructure from the effects of corrosion. Metallic municipal pipelines are composed of cast and ductile iron, composite concrete pressure pipes, and steel pipe. For more than a hundred years, the buried steel pipe industry has employed effective corrosion protection, both on the inside and outside walls of pipelines. Lines more than 100 years old serve as testimony of the effectiveness of these systems. Both rigid cementitious and flexible dielectric corrosion barriers - combined with cathodic protection, when required - have ensured long service lives. By the 1940's, the American Water Works Association (AWWA) had published two standards for corrosion protection of steel pipes, one for cementitious systems and the other for dielectric systems. With advances in technology, many other technologies have been added to the list of standards, the most recent as recently as 2008. This paper will provide an update on the state-of-the-art lining and coating systems currently specified for steel pipe by the engineering community at large. AWWA, NACE International, and other standards-writing organizations' documents will be discussed. Focus on corrosion prevention through surface preparation for lining and coating applications, quality control, handling, repair, joint completion, and installation will be highlighted.
- 17 August 2012
- Published by American Society of Civil Engineers (ASCE)
- p. 494-504
Rehabilitation of Large Diameter PCCP: Relining and Sliplining with Steel Pipe
Failures of Prestressed Concrete Cylinder Pipe (PCCP) throughout North American municipal water transmission systems since the 1970's has led to the development of a myriad of rehabilitation technologies. Besides removing and replacing full sections of distressed pipe with new pipe, the most widely used method of rehabilitation of PCCP is the structurally independent, Type IV relining of the host pipe with steel cylinders. Referred to as Steel Cylinder Relining or Sliplining, both of these semi-trenchless technologies allow a fully structural renewal of long lengths of PCCP in an economical and expeditious manner. The differences between Relining and Sliplining are discussed from the standpoint of manufacture, flow capacities, design, planning, installation and corrosion protection. The paper also provides a description and comparison of other rehab technologies.
- 17 August 2012
- Published by American Society of Civil Engineers (ASCE)
- p. 494-504
Rehabilitation of Large Diameter PCCP: Relining and Sliplining with Steel Pipe
Failures of Prestressed Concrete Cylinder Pipe (PCCP) throughout North American municipal water transmission systems since the 1970's has led to the development of a myriad of rehabilitation technologies. Besides removing and replacing full sections of distressed pipe with new pipe, the most widely used method of rehabilitation of PCCP is the structurally independent, Type IV relining of the host pipe with steel cylinders. Referred to as Steel Cylinder Relining or Sliplining, both of these semi-trenchless technologies allow a fully structural renewal of long lengths of PCCP in an economical and expeditious manner. The differences between Relining and Sliplining are discussed from the standpoint of manufacture, flow capacities, design, planning, installation and corrosion protection. The paper also provides a description and comparison of other rehab technologies.