Douglas H. Grabenstetter
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Douglas H. Grabenstetter has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- John M. Usher
Mississippi State University
3 shared publications Jeff Whittle
Milwaukee Sch Engn Univ, Mech Engn Dept, Ind Engn Program, Milwaukee, WI 53202 USA
1 shared publicationNipa Phojanamongkolkij
1 shared publication- Omar Ghrayeb
Northern Illinois University
1 shared publication Ramez Rashid
Milwaukee Sch Engn Univ, Mech Engn Dept, Ind Engn Program, Milwaukee, WI 53202 USA
1 shared publication
Latest Publications
- Open Access
- 19 August 2020
- Published by Cambridge University Press (CUP) in Journal of Clinical and Translational Science
- Vol. 5 (1) , 1-20
Using a process improvement approach to identifying barriers to research in a CTSA hub environment
For the past 4 years, as part of the National Institutes of Health (NIH) Clinical and Translational Science Award (CTSA) grant award number UL1TR001436, the Clinical Translational Science Institute of Southeast Wisconsin (CTSI) has used process engineering approaches to identify and understand barriers that local researchers and other stakeholders face when engaging in clinical and translational science. We describe these approaches and present preliminary results. We identified barriers from published and unpublished work at other CTSA hubs, supplemented by surveys and semi-structured interviews of CTSI faculty. We then used a multifaceted approach to organize, visualize, and analyze the barriers. We have identified 27 barriers to date. We ranked their priority for CTSI to address based on the barrier's impact, the feasibility of intervention, and whether addressing the barrier aligned with CTSI's institutional role. This approach provides a systematic framework to scope and address the "barriers to research problem" at CTSI institutions.
- 19 August 2020
- Published by Cambridge University Press (CUP) in Journal of Clinical and Translational Science
- Vol. 5 (1) , 1-20
Open AccessUsing a process improvement approach to identifying barriers to research in a CTSA hub environment
For the past 4 years, as part of the National Institutes of Health (NIH) Clinical and Translational Science Award (CTSA) grant award number UL1TR001436, the Clinical Translational Science Institute of Southeast Wisconsin (CTSI) has used process engineering approaches to identify and understand barriers that local researchers and other stakeholders face when engaging in clinical and translational science. We describe these approaches and present preliminary results. We identified barriers from published and unpublished work at other CTSA hubs, supplemented by surveys and semi-structured interviews of CTSI faculty. We then used a multifaceted approach to organize, visualize, and analyze the barriers. We have identified 27 barriers to date. We ranked their priority for CTSI to address based on the barrier's impact, the feasibility of intervention, and whether addressing the barrier aligned with CTSI's institutional role. This approach provides a systematic framework to scope and address the "barriers to research problem" at CTSI institutions.
- Open Access
- 12 January 2015
- Published by Taylor & Francis in Production & Manufacturing Research
- Vol. 3 (1) , 201-217
Sequencing jobs in an engineer-to-order engineering environment
Engineer–to-order (ETO) firms produce complex – one of a kind – products and desire shorter lead time as a key component to cost competitiveness. In ETO firms, the engineering process is the largest controllable consumer of lead time. Given that lead time is a function of completion rate and scheduling policy, one critical process is to accurately sequence jobs in front of the engineering function. However, unlike other manufacturing models, such as make–to-stock or make-to-order models, the design for an ETO product is not realized until after the engineering process has been completed. Hence, the only information available does not include data normally required by most sequencing algorithms. Therefore, the problem becomes the determination of an accurate schedule within a complex transactional process for jobs which have not even been designed yet. This paper investigates this topic in the context of the engineering process within the ETO model. Based on research conducted in conjunction with multiple firms, common factors are identified which drive complexity, and a new framework and algorithm are presented for using these factors to sequence jobs. Using discrete event simulation, the performance of this new algorithm is found to be a significant improvement over current industry and published methods.
- 12 January 2015
- Published by Taylor & Francis in Production & Manufacturing Research
- Vol. 3 (1) , 201-217
Open AccessSequencing jobs in an engineer-to-order engineering environment
Engineer–to-order (ETO) firms produce complex – one of a kind – products and desire shorter lead time as a key component to cost competitiveness. In ETO firms, the engineering process is the largest controllable consumer of lead time. Given that lead time is a function of completion rate and scheduling policy, one critical process is to accurately sequence jobs in front of the engineering function. However, unlike other manufacturing models, such as make–to-stock or make-to-order models, the design for an ETO product is not realized until after the engineering process has been completed. Hence, the only information available does not include data normally required by most sequencing algorithms. Therefore, the problem becomes the determination of an accurate schedule within a complex transactional process for jobs which have not even been designed yet. This paper investigates this topic in the context of the engineering process within the ETO model. Based on research conducted in conjunction with multiple firms, common factors are identified which drive complexity, and a new framework and algorithm are presented for using these factors to sequence jobs. Using discrete event simulation, the performance of this new algorithm is found to be a significant improvement over current industry and published methods.
- 23 July 2014
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 52 (21) , 6349-6361
Developing due dates in an engineer-to-order engineering environment
- 23 July 2014
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 52 (21) , 6349-6361
Developing due dates in an engineer-to-order engineering environment
- 9 June 2013
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 51 (19) , 5728-5740
Determining job complexity in an engineer to order environment for due date estimation using a proposed framework
The engineer to order (ETO) environment is a common operating strategy found in industry today. ETO is a growing strategy as customers are increasingly demanding personalized solutions. In ETO, the engineering process is the largest controllable consumer of lead-time consuming one half of the total. A critical process is to determine engineering complexity for purposes of flow time prediction. One distinguishing factor of ETO is that each product is the culmination of a unique design prepared for a particular customer order. The only information available is limited to that which has been gathered during the quoting stage. Hence, the question becomes how does one determine the job difficulty in a complex transactional process when the job has not even been designed yet? This paper presents the results of a study that was conducted in conjunction with multiple ETO firms to identify factors which drive complexity in the engineering environment. One important application of these complexity factors is as a potential input to the accurate prediction of flow times. This paper presents a framework for using these complexity factors to predict ETO engineering flow times.
- 9 June 2013
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 51 (19) , 5728-5740
Determining job complexity in an engineer to order environment for due date estimation using a proposed framework
The engineer to order (ETO) environment is a common operating strategy found in industry today. ETO is a growing strategy as customers are increasingly demanding personalized solutions. In ETO, the engineering process is the largest controllable consumer of lead-time consuming one half of the total. A critical process is to determine engineering complexity for purposes of flow time prediction. One distinguishing factor of ETO is that each product is the culmination of a unique design prepared for a particular customer order. The only information available is limited to that which has been gathered during the quoting stage. Hence, the question becomes how does one determine the job difficulty in a complex transactional process when the job has not even been designed yet? This paper presents the results of a study that was conducted in conjunction with multiple ETO firms to identify factors which drive complexity in the engineering environment. One important application of these complexity factors is as a potential input to the accurate prediction of flow times. This paper presents a framework for using these complexity factors to predict ETO engineering flow times.
- 31 December 2003
- Published by Elsevier in Journal of Manufacturing Systems
- Vol. 22 (2) , 148-156
Scheduling jobs to improve weighted on-time performance of a single machine
- 31 December 2003
- Published by Elsevier in Journal of Manufacturing Systems
- Vol. 22 (2) , 148-156
Scheduling jobs to improve weighted on-time performance of a single machine