Helmut Huber
Helmut Huber has a total of 11 co-authors. Here are the top co-authors by number of shared publications:
- Hanns Wagner
ÖBB‐Infrastruktur AG Europaplatz 2 8020 Graz Austria
2 shared publications - Helmut Posch
IGT Geotechnik und Tunnelbau, ZT‐GmbH Mauracherstraße 9 5020 Salzburg Austria
2 shared publications - Matthias Kager
ÖBB – Infrastruktur AG GB Projekte Neu‐/Ausbau, PLK 3 Europaplatz 2 8020 Graz Austria
2 shared publications - Richard Otto
ÖBA KAT2 ARGE ILF-IGT-3G, 3G Gruppe Geotechnik Graz, ZT-GmbH, Triesterstr. 478a, 8055 Graz-Seiersberg, Austria
2 shared publications - Roland Murr
Pöyry Infra GmbH; Materialversuchsanstalt Strass; Oberdorf 103 6261 Strass i. Z
2 shared publications - Anton Schweighofer
Bridge Building Department Office of the Provincial Government of Lower Austria St Pölten Austria
1 shared publication
Latest Publications
- 3 August 2015
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 8 (4) , 340-347
Recycling of tunnel excavation using the example of the Koralm Tunnel, contract KAT2 – Status April 2015 / Verwertung von Tunnelausbruch am Beispiel des Koralmtunnels, Baulos KAT2 – Stand April 2015
Contract KAT2 will produce about 8.6 m. t of material excavated from the tunnel. In the course of the design work, maximum reuse of this material was intended, always considering economics and while reducing the environmental impact by minimizing transport and saving resources. More than half of the suitable tunnel spoil will be preliminarily screened and then processed for the production of aggregates for concrete production. After the first year of production, the high losses associated with the preliminary screening and processing demanded measures to improve the processing, which led to an improvement of the recycling quota. The aggregates produced on site so far fulfil the technical requirements for concrete production, even for high strength concrete grades.Am Baulos KAT2 fallen insgesamt rund 8,6 Mio. t Tunnelausbruchmaterial an. In der Projektplanung wurde eine maximale Wiederverwertbarkeit des Ausbruchmaterials unter Berücksichtigung der Wirtschaftlichkeit bei einer geringen Umweltbelastung durch Minimierung der Transportvorgänge und eine weitgehende Ressourcenschonung angestrebt. Mehr als die Hälfte des geeigneten Tunnelausbruchmaterials wird für die Produktion von Gesteinskörnungen zur Betonherstellung vorabgesiebt und anschließend weiter aufbereitet. Die hohen Vorabsiebungs‐ und Aufbereitungsverluste erforderten nach dem ersten Produktionsjahr Verbesserungsmaßnahmen im Aufbereitungsprozess, die zu einer Erhöhung der Aufbereitungsquote führten. Die bisher vor Ort hergestellten Gesteinskörnungen erfüllen die technischen Anforderungen für die Betonerzeugung und darüber hinaus auch für Betonsorten mit hohen Druckfestigkeiten.
- 3 August 2015
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 8 (4) , 340-347
Recycling of tunnel excavation using the example of the Koralm Tunnel, contract KAT2 – Status April 2015 / Verwertung von Tunnelausbruch am Beispiel des Koralmtunnels, Baulos KAT2 – Stand April 2015
Contract KAT2 will produce about 8.6 m. t of material excavated from the tunnel. In the course of the design work, maximum reuse of this material was intended, always considering economics and while reducing the environmental impact by minimizing transport and saving resources. More than half of the suitable tunnel spoil will be preliminarily screened and then processed for the production of aggregates for concrete production. After the first year of production, the high losses associated with the preliminary screening and processing demanded measures to improve the processing, which led to an improvement of the recycling quota. The aggregates produced on site so far fulfil the technical requirements for concrete production, even for high strength concrete grades.Am Baulos KAT2 fallen insgesamt rund 8,6 Mio. t Tunnelausbruchmaterial an. In der Projektplanung wurde eine maximale Wiederverwertbarkeit des Ausbruchmaterials unter Berücksichtigung der Wirtschaftlichkeit bei einer geringen Umweltbelastung durch Minimierung der Transportvorgänge und eine weitgehende Ressourcenschonung angestrebt. Mehr als die Hälfte des geeigneten Tunnelausbruchmaterials wird für die Produktion von Gesteinskörnungen zur Betonherstellung vorabgesiebt und anschließend weiter aufbereitet. Die hohen Vorabsiebungs‐ und Aufbereitungsverluste erforderten nach dem ersten Produktionsjahr Verbesserungsmaßnahmen im Aufbereitungsprozess, die zu einer Erhöhung der Aufbereitungsquote führten. Die bisher vor Ort hergestellten Gesteinskörnungen erfüllen die technischen Anforderungen für die Betonerzeugung und darüber hinaus auch für Betonsorten mit hohen Druckfestigkeiten.
- 1 October 2014
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 7 (5) , 437-450
Tunnel excavation – The conflict between waste and recycling through the example of the Koralm Tunnel, contract KAT2 / Tunnelausbruch – Das Spannungsfeld zwischen Abfall und Verwertung am Beispiel Koralmtunnel, Baulos KAT2
- 1 October 2014
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 7 (5) , 437-450
Tunnel excavation – The conflict between waste and recycling through the example of the Koralm Tunnel, contract KAT2 / Tunnelausbruch – Das Spannungsfeld zwischen Abfall und Verwertung am Beispiel Koralmtunnel, Baulos KAT2
- 2 December 2013
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 6 (6) , 661-668
Use of recycled material for segments and inner lining – first experience of on‐site processing on KAT 2 / Verwendung von Tunnelausbruchmaterial – von der TBM bis zum Tübbing, erste Erfahrungen mit der Materialaufbereitung vor Ort im Baulos KAT 2
- 2 December 2013
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 6 (6) , 661-668
Use of recycled material for segments and inner lining – first experience of on‐site processing on KAT 2 / Verwendung von Tunnelausbruchmaterial – von der TBM bis zum Tübbing, erste Erfahrungen mit der Materialaufbereitung vor Ort im Baulos KAT 2
- 12 April 2010
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 3 (2) , 185-200
New development of a crack-limited invert slab / . Neuentwicklung einer rissebeschränkten Sohlplatte
- 12 April 2010
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 3 (2) , 185-200
New development of a crack-limited invert slab / . Neuentwicklung einer rissebeschränkten Sohlplatte