BBBranko Božić

Branko Božić

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Branko Božić has a total of 25 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • CASE STUDY OF STABILITY OF ZENITH TROPOSPHERIC DELAY FROM PPP PROCESSING BASED ON TWO MULTI-HOUR GNSS SESSIONS

    by Sanja Tucikešić, Tanja Đukanović, Branko Božić, Ankica Milinković, Siniša Drobnjak

    The paper presents a case study based on two multi-hour static GNSS measurement sessions processed by the Precise Point Positioning (PPP) method in the gLAB software, where the zenith tropospheric delay (ZTD) was estimated as an independent parameter. The analysis is based on data from one stabilized point within the GNSS network for object monitoring using measurements from two time periods (summer and winter). GNSS observations are divided into time subintervals in order to analyze the behavior of ZTD time series and their dependence on the measurement duration. Special attention is paid to the initial phase of convergence of the PPP solution, as well as the transition to a stable assessment regime. The results show that ZTD estimates have increased variability in the initial phase, while more stable behavior is achieved with longer measurement durations. Differences between the analyzed sessions (summer and winter) were observed, but they were not statistically significant. The results indicate the importance of observation duration and convergence effects in the estimation of the ZTD parameter.

  • Open Access

    Integration of GPS Data and Seismic Events using Lomb-Scargle Spectral Analysis: a Study of GPS Station SPLT

    by Sanja Tucikešić, Tanja Đukanović, Branko Božić, Ankica Milinković, Sandra Kosić Jeremić

    This study analyzes the long-term and seasonal variations in the GPS time series of the SPLT station, located in a seismically active region. By integrating data on seismic events with a time series of GPS coordinates, we identify coseismic displacem...

  • Open Access

    TROPOSPHERIC INFLUENCE IN GNSS POSITIONING

    by Sanja Tucikešić, Tanja Đukanović, Ankica Milinković, Branko Božić

    Atmospheric influences, mainly caused by ionospheric and tropospheric conditions, lead to delays and distortions of GNSS signals that travel from satellites to receivers on Earth. This impact must be considered for projects that require high positioning and navigation accuracy. The troposphere dominates in areas with a large amount of water vapour and can also cause measurement errors due to changes in signal propagation speed. In this work, the tropospheric influence on GNSS positioning was analysed. The focus is on their cause, how they affect the accuracy of GNSS measurements, and the methods and technologies used to reduce or eliminate this influence. A 3D geodetic network of permanent stations was levelled using different empirical tropospheric models. Understanding and correcting these factors are important for improving GNSS technology's accuracy, reliability and practical use in modern geodetic and scientific research. The tropospheric delay is usually modelled in the zenith direction and is called the zenith tropospheric delay. As the zenith angle increases, the delay itself increases. So-called reduction functions obtain the relationship between the zenith and oblique delays. The GNSS-Lab Tool software and data collection and processing methods were used to calculate and obtain the zenith tropospheric delay (ZTK) value.


  • Open Access

    Examining the impact of Ground Control point quantity on the geometric accuracy of UAV photogrammetric products formed using Structure-from-Motion approach

    by Ratko R. Nikolić, Nenad D. Brodić, Branko S. Božić

    The positional and vertical accuracy of UAV aerial photogrammetry products generated using the Structure from Motion (SfM) approach depends on various factors, such as flight plan parameters, camera quality, camera calibration, the SfM algorithm used, and the georeferencing process. The influence of the quantity of Ground Control Points (GCPs) on the geometric quality of generated models and the stability of camera calibration parameters assessed through self-calibration in the block-aerotriangulation process was investigated in this study. Three software systems were used to process the collected UAV photogrammetry images: Pix4D Mapper, Agisoft Metashape, and Trimble Inpho UASMaster. Standard statistical quality assessments were employed to assess the accuracy of the block-aerotriangulation. The research findings indicate that augmenting the quantity of GCPs enhances model reliability and decreases the RMSE values of vertical deviation on the control points. The RMSE values of vertical deviation on the check points for all three used software systems converged to approximately twice the value of the average spatial resolution. Additionally, the RMSE values of positional deviation on check points converged to the value of the average spatial resolution.


  • Open Access

    Analysis of the stability of the Lipovica dam using the Karlsruhe method

    by Vladan B. Bošković, Milutin M. Pejović, Branko S. Božić, Zagorka I. Gospavić

    The topic of the paper deals with the analysis of the stability of the geodetic 2D network of the "Lipovica" dam using the Karlsruhe method of deformation analysis. In the first part of the paper, in a concise manner, a general classification of deformation models that are used in the realization of geodetic observation is given. A separate chapter is dedicated to the description of the Karlsruhe method itself, its algorithm and the method of application. The effectiveness of the method was separately discussed on the practical example of the geodetic 2D network of the "Lipovica" dam, whose control ephe data were simulated. This analysis determined the agreement between the simulated displacement values and the values detected by the Karlsruhe method, with all input data necessary for repeating the procedure available in the work.

  • Open Access

    Assessment the movement of the engineering structures within PANDA software package

    by Branko S. Božić, Branko Đ. Milovanović, Sanja S. Tucikešić, Slavko S. Vasiljević

    The paper describes the assessment of the significance of the displacement of the points of the deformation structure (object) by the geodetic method of deformation analysis using the PANDA software package. According to the pre-assumed displacement and the measurement plan, the data of length measurements in two different time epochs were simulated. and the intensity and direction of deformation were assessed using the PANDA program. Within the deformation assessment, different assessment strategies were analyzed, through a one - and two - step procedure. In both cases, the expected agreement of the displacement estimate with the pre-assumed value was reached.


  • Open Access

    GEODETIC CONTROL OF GEOMETRY OF ENGINEERING FACILITY DURING CONSTRUCTION – CASE STUDY RESIDENTIAL–BUSINESS FACILITY IN SRBAC

    by Vladan Janković, Slavko Vasiljević, Branko Božić

    The paper presents the procedure of geodetic control of the geometry of a residential-business building under construction, by testing the compliance of the position of the designed and constructed characteristic points of the building. It is described the manner of designing and establishing a geodetic network from which the marking and control of geometry was performed. Based on the obtained results, it was concluded that the derived geometry is agreed with designed one. In this way, it was once again confirmed that the establishment of a quality geodetic network, marking and the application of suitable models for testing linear hypotheses play an important role in the successful realization of the projected geometry of the object using geodetic methods.

  • Absolute Time Series GNSS Point Positioning-Data Cleaning and Noise Characterization

    by Sanja Tucikešić, Branko Božić, Medžida Mulić

    Time series data of GNSS point positioning are considerably used for the purpose of geophysical research. The velocity estimates and their uncertainties derive from time series data of GNSS point positioning affected by seasonal signals and the stochastic noise, contained in the series. Data cleaning of GNSS time series is a prerequisite for the noise characterization and analysing. In this article one point positioning of time series was analysed in four different periods during the five year interval. The noise characteristics were estimated for all periods. By applying Lomb-Scargle algorithm the comparable results were also provided. Lomb-Scargle algorithm used to estimate the spectral strength density of unequal sampled data is a typical tool for this kind of analysis. Spectral indices have been estimated before cleaning data and after removing linear, annual and semi-annual signals and outliers. The spectral indices estimated from time series data of GNSS point positioning were located in the area of fractional Gaussian noises, and stationary stochastic process was described for the whole research time period.


  • Open Access

    The importance of geodetic engineering in the engineering-technical fields

    by Branko S. Božić

    The paper deals with the presentation of the valid legal role of geodetic activity in the field of civil engineering in the Republic of Serbia. Permanent diminution of the importance and role of the geodetic profession in practice is pointed out, which can lead to serious consequences and significant material damage to society and the individual. While under previous regulations nothing could be built and put into operation without control by the geodetic profession, with a number of new regulations this phase is neglected or skipped, often relying on visual control. Geodetic control was one of the most important stages without which work could not be started, continued or work permit issued. The assumption is that the motive for this situation lies in the pervasive need to accelerate technological construction procedures with the aim of reaching unrealistic deadlines and creating the idea of greater efficiency of work, contrary to the quality and safety of construction, will be turned out very quickly.


  • Open Access

    Project oriented problem based learning: The first experiances of using this approach at the study program of Geodesy and geoinformatics

    by Branko S. Božić, Marko M. Pejić, Sanja S. Tucikešić

    In this article the PBL approach was used at the course level as the method of learning. Through the Adjustment calculation course a group of seven students was selected and started to work an accordance to PBL methodology. The method of work followed the PBL phylosophy related to widellz accepted seven PBL steps. The students recognized a lot of benefits of PBL. They have been faced to the real life problem, worked and communicate toogheter and built the content ow work in accordance to the project needs. They shared ideas, analyse them and made decisions. After completing the process they presented the results. At the end of the process the survey was organized and the students valuated their efforts and assessed the quality of the PBL process.