Sebastian Kain
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Sebastian Kain has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Frank Schiller
Technische Universität München, Institute of Automation and Information Systems, Automation Group, Boltzmannstr. 15, 85748 Garching, Germany
5 shared publications Martin Merz
Lehrstuhl für Informationstechnik im Maschinenwesen, TU München
2 shared publications- Sven Dominka
Institute of Information Technology in Mechanical Engineering, Technical University Munich, D-85748 Garching near Munich, Germany
2 shared publications Timo Frank
Lehrstuhl für Informationstechnik im Maschinenwesen, TU München
2 shared publications- Eduard Brocker
Institute of Information Technology in Mechanical Engineering, Technical University Munich, D-85748 Garching near Munich, Germany
1 shared publication - Hao Ding1 shared publication
Latest Publications
- 17 June 2010
- Published by Vulkan-Verlag GmbH in atp magazin
- Vol. 52 (6) , 50-59
Betriebsparallele Simulationsanwendungen
Anlagen mit ihren Maschinen stellen hochkomplexe Systeme dar. Steigender Wettbewerb und maßgeschneiderte Fertigung nach Kundenwunsch selbst bei geringen Stückzahlen erfordern die effiziente Nutzung der vorhandenen Ressourcen, um Wirtschaftlichkeit zu erreichen. Mit Simulationsverfahren kann das Anlagenverhalten analysiert und auf Gütekriterien und Optimierungspotenzial im Betrieb untersucht werden. Vorgestellt wird eine Klassifikation betriebsparalleler Simulationsverfahren, die die systematische Analyse des Anlagenverhaltens erlauben und die Auswahl einer dazu passenden betriebs- und anlagenspezifischen Simulationsanwendung ermöglicht.
- 17 June 2010
- Published by Vulkan-Verlag GmbH in atp magazin
- Vol. 52 (6) , 50-59
Betriebsparallele Simulationsanwendungen
Anlagen mit ihren Maschinen stellen hochkomplexe Systeme dar. Steigender Wettbewerb und maßgeschneiderte Fertigung nach Kundenwunsch selbst bei geringen Stückzahlen erfordern die effiziente Nutzung der vorhandenen Ressourcen, um Wirtschaftlichkeit zu erreichen. Mit Simulationsverfahren kann das Anlagenverhalten analysiert und auf Gütekriterien und Optimierungspotenzial im Betrieb untersucht werden. Vorgestellt wird eine Klassifikation betriebsparalleler Simulationsverfahren, die die systematische Analyse des Anlagenverhaltens erlauben und die Auswahl einer dazu passenden betriebs- und anlagenspezifischen Simulationsanwendung ermöglicht.
- 1 June 2010
- Published by Vulkan-Verlag GmbH in atp magazin
- Vol. 52 (6) , 50
Betriebsparallele Simulationsanwendungen
- 1 June 2010
- Published by Vulkan-Verlag GmbH in atp magazin
- Vol. 52 (6) , 50
Betriebsparallele Simulationsanwendungen
- 1 January 2009
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 42 (8) , 1533-1538
Increasing Reliability of Intelligent Manufacturing Systems by Adaptive Optimization and Safety Supervision
- 1 January 2009
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 42 (8) , 1533-1538
Increasing Reliability of Intelligent Manufacturing Systems by Adaptive Optimization and Safety Supervision
- 1 July 2007
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 170-177
Modification of Field Bus Telegrams for Hybrid Commissioning; Merge-Tool for PROFIBUS
The commissioning of production plants is still a critical phase and represents a high percentage of the overall engineering process. The Hybrid Commissioning method is a new approach to increase the efficiency of the commissioning, i.e. to reduce costs and the danger of damages. Hybrid Commissioning starts with a simulation of the complete plant and the components of the simulated plant are substituted stepwise by their real counterparts. Especially for field bus driven production plants, this kind of parallel operation poses a challenge. Therefore, a supporting tool system with a specific architecture is necessary. In order to combine signal values of real and simulated components within this architecture in a useful way, a so called Merge-Tool has been developed. In this paper, the Merge-Tool, its requirements, its functionality, and its implementation for PROFIBUS driven production plants are described.
- 1 July 2007
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 170-177
Modification of Field Bus Telegrams for Hybrid Commissioning; Merge-Tool for PROFIBUS
The commissioning of production plants is still a critical phase and represents a high percentage of the overall engineering process. The Hybrid Commissioning method is a new approach to increase the efficiency of the commissioning, i.e. to reduce costs and the danger of damages. Hybrid Commissioning starts with a simulation of the complete plant and the components of the simulated plant are substituted stepwise by their real counterparts. Especially for field bus driven production plants, this kind of parallel operation poses a challenge. Therefore, a supporting tool system with a specific architecture is necessary. In order to combine signal values of real and simulated components within this architecture in a useful way, a so called Merge-Tool has been developed. In this paper, the Merge-Tool, its requirements, its functionality, and its implementation for PROFIBUS driven production plants are described.
- 1 May 2007
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-6
Hybrid Commissioning - Speeding-up Commissioning of Field Bus Driven Production Plants
The commissioning of complex mechatronical industrial systems like production plants is still a critical phase and represents a high percentage of the overall engineering process. The Hybrid Commissioning method is a new approach to increase the efficiency of the commissioning, i.e. to reduce the costs and the danger of damages. Hybrid Commissioning starts with a simulation of the complete plant and the components of the simulated plant are substituted stepwise by their real counterparts. Especially for field bus driven production plants, this kind of parallel operation poses a challenge. Therefore, a supporting tool system with a specific architecture is necessary. In order to combine signal values of real and simulated components within this architecture in a useful way, a so called merge tool has been developed. In this paper, the Hybrid Commissioning method is introduced by means of an example of a PROFIBUS driven production plant.
- 1 May 2007
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-6
Hybrid Commissioning - Speeding-up Commissioning of Field Bus Driven Production Plants
The commissioning of complex mechatronical industrial systems like production plants is still a critical phase and represents a high percentage of the overall engineering process. The Hybrid Commissioning method is a new approach to increase the efficiency of the commissioning, i.e. to reduce the costs and the danger of damages. Hybrid Commissioning starts with a simulation of the complete plant and the components of the simulated plant are substituted stepwise by their real counterparts. Especially for field bus driven production plants, this kind of parallel operation poses a challenge. Therefore, a supporting tool system with a specific architecture is necessary. In order to combine signal values of real and simulated components within this architecture in a useful way, a so called merge tool has been developed. In this paper, the Hybrid Commissioning method is introduced by means of an example of a PROFIBUS driven production plant.