Vincent Chapurlat
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Vincent Chapurlat has a total of 52 co-authors. Here are the top co-authors by number of shared publications:
- Nicolas Daclin
IMT-Mines Ales, LSR, 6 Avenue de Clavières, 30100 Alès, France
9 shared publications - François Pfister
LGI2P; Parc scientifique Georges Besse; 30035 Nîmes CEDEX 1 - France
5 shared publications - Robert Plana
Technology & Innovation, Assystem, 92400 Courbevoie, France
5 shared publications - Blazo Nastov
Axellience, Lille, France
3 shared publications - Christophe Dony
Lirmm Laboratory
3 shared publications - Victor Richet
Assystem STUP , Third Floor, 77A, Shaheed Ripon Katyal Marg, East Block, Sector 18, Gurugram 122002, Haryana, India
3 shared publications
Latest Publications
- Open Access
- 21 October 2024
- Published by EDP Sciences in EPJ Nuclear Sciences & Technologies
- Vol. 10, 12
A contribution for dismantling of nuclear facilities: a functional pattern for dismantling operations and indicators design and management
Optimizing nuclear installation decommissioning and dismantling operations is an ongoing quest. Faced with the complexity of this activity, Model Based System Engineering promotes relevant principles and modeling techniques. It motivated the definition of a functional generic pattern model of the waste package production line and the decommissioning of the facility. It proposes a global and generic functional architecture of such a system aiming to reduce the level of the pollutant. This pattern is coupled with a process of logistics. Six functions are combined to define this functional pattern. The application of this pattern model to a case of waste recovery in a pit shows the relevance of the model-based system engineering approach, reducing the weight of the history in the development of scenarios by optimizing the control means for nuclear safety and product quality.
- 21 October 2024
- Published by EDP Sciences in EPJ Nuclear Sciences & Technologies
- Vol. 10, 12
Open AccessA contribution for dismantling of nuclear facilities: a functional pattern for dismantling operations and indicators design and management
Optimizing nuclear installation decommissioning and dismantling operations is an ongoing quest. Faced with the complexity of this activity, Model Based System Engineering promotes relevant principles and modeling techniques. It motivated the definition of a functional generic pattern model of the waste package production line and the decommissioning of the facility. It proposes a global and generic functional architecture of such a system aiming to reduce the level of the pollutant. This pattern is coupled with a process of logistics. Six functions are combined to define this functional pattern. The application of this pattern model to a case of waste recovery in a pit shows the relevance of the model-based system engineering approach, reducing the weight of the history in the development of scenarios by optimizing the control means for nuclear safety and product quality.
- 1 January 2023
- Published by Research Publishing Services
- p. 1959-1966
Contribution of a Risks Management Method for Depollution Projects Based on MBSE Approach
- 1 January 2023
- Published by Research Publishing Services
- p. 1959-1966
Contribution of a Risks Management Method for Depollution Projects Based on MBSE Approach
Towards a Method to Operationalize Modelling, Verification, and Evaluation of Architectural Solutions in the Field of Nuclear Critical Infrastructure Engineering
Nuclear infrastructure development projects are increasing in complexity, involving numerous and various stakeholders. Highly constrained, they are often subject to many hazards. This has an impact on the number of desired design alternatives generated throughout the facility life cycle and their evolving assessment. In order to secure the delivery of such projects, the Évaluation for Critical Infrastructures Model‐based system Engineering (EVA‐CIME) method is proposed to implement and operate the architecture evaluation at the scales both of an organization and of projects. This article presents the elements justifying the formalization of such method and the obstacles to overcome. This method must be technically and organizationally usable by the different actors of a nuclear infrastructure development project. It is composed of 5 elements: concepts; languages; operational approach; tools and repository of knowledge and expertise. The good orchestration of these different components allows to set up an environment within the organization to carry out effective architecture evaluations with the aim of helping the architects to choose between the alternatives that they will imagine from the beginning of the project.
Towards a Method to Operationalize Modelling, Verification, and Evaluation of Architectural Solutions in the Field of Nuclear Critical Infrastructure Engineering
Nuclear infrastructure development projects are increasing in complexity, involving numerous and various stakeholders. Highly constrained, they are often subject to many hazards. This has an impact on the number of desired design alternatives generated throughout the facility life cycle and their evolving assessment. In order to secure the delivery of such projects, the Évaluation for Critical Infrastructures Model‐based system Engineering (EVA‐CIME) method is proposed to implement and operate the architecture evaluation at the scales both of an organization and of projects. This article presents the elements justifying the formalization of such method and the obstacles to overcome. This method must be technically and organizationally usable by the different actors of a nuclear infrastructure development project. It is composed of 5 elements: concepts; languages; operational approach; tools and repository of knowledge and expertise. The good orchestration of these different components allows to set up an environment within the organization to carry out effective architecture evaluations with the aim of helping the architects to choose between the alternatives that they will imagine from the beginning of the project.
- 15 November 2021
- Published by Springer Nature
- p. 227-236
Collaborative Safety Requirements Engineering: An Approach for Modelling and Assessment of Nuclear Safety Requirements in MBSE Context
- 15 November 2021
- Published by Springer Nature
- p. 227-236
Collaborative Safety Requirements Engineering: An Approach for Modelling and Assessment of Nuclear Safety Requirements in MBSE Context
- Open Access
- 22 September 2021
- Published by MDPI AG in Sustainability
- Vol. 13 (19) , 10520
A Model Based System Commissioning Approach for Nuclear Facilities
Commissioning is considered as a critical phase in the delivery of a Nuclear Facility (NF) as it is the first stage in the authorization of the NF to be exploited. Most of the nuclear projects start to overrun costs during commissioning mainly since this phase is not addressed properly and is affected by many issues from previous phases (Design, Procurement, and Construction). This article proposes a general methodology to prepare and realize the commissioning activities. Using models to do so improves communication and removes ambiguities between stakeholders. It also formalizes and clarifies the commissioning organization and activities prior to any implementation. It also allows for capitalizing and sharing the experience from previous projects, by drawing references models and good practices patterns. The so-called Model Based commissioning method is elaborated around concepts, languages, processes, tools, and patterns inspired from Model Based System Engineering (MBSE) principles and practices. The theoretical foundations will be supported by results from nuclear facilities demonstrating the added value.
- 22 September 2021
- Published by MDPI AG in Sustainability
- Vol. 13 (19) , 10520
Open AccessA Model Based System Commissioning Approach for Nuclear Facilities
Commissioning is considered as a critical phase in the delivery of a Nuclear Facility (NF) as it is the first stage in the authorization of the NF to be exploited. Most of the nuclear projects start to overrun costs during commissioning mainly since this phase is not addressed properly and is affected by many issues from previous phases (Design, Procurement, and Construction). This article proposes a general methodology to prepare and realize the commissioning activities. Using models to do so improves communication and removes ambiguities between stakeholders. It also formalizes and clarifies the commissioning organization and activities prior to any implementation. It also allows for capitalizing and sharing the experience from previous projects, by drawing references models and good practices patterns. The so-called Model Based commissioning method is elaborated around concepts, languages, processes, tools, and patterns inspired from Model Based System Engineering (MBSE) principles and practices. The theoretical foundations will be supported by results from nuclear facilities demonstrating the added value.
A Model‐Based Approach to Design, Organize, and Monitor Dismantling and Decommissioning of Nuclear Facilities
Dismantling and Decommissioning (D&D) of nuclear facilities involves complex operations, requiring various activities’ many stakeholders to collaborate, and must address numerous significant constraints. The CEA (French Alternative Energies and Atomic Energy Commission), is conducting research to better pilot these operations, reduce their costs and timeframes, and improve overall performance. However, many issues remain, leading to studying and implementing, in the form of a method with appropriate tools, systemic principles and complex project and systems engineering. This method first formalizes and specifies the entire requirement set to consider. Second, based on these requirements, the method will enable the project team to structure, check, and demonstrate the project's coherence and feasibility from both the technological and organizational viewpoints. Lastly, the method should permit a constant D&D strategy and product management re‐evaluation, depending on the possible D&D project evolution. Developing demonstration software aims to provide the functionalities requested for the design, and future enterprise software implementation and maintenance, which should provide a complete D&D project Digital Mock‐Up being interoperable and connected to the tools and databases of the stakeholders’ information systems.
A Model‐Based Approach to Design, Organize, and Monitor Dismantling and Decommissioning of Nuclear Facilities
Dismantling and Decommissioning (D&D) of nuclear facilities involves complex operations, requiring various activities’ many stakeholders to collaborate, and must address numerous significant constraints. The CEA (French Alternative Energies and Atomic Energy Commission), is conducting research to better pilot these operations, reduce their costs and timeframes, and improve overall performance. However, many issues remain, leading to studying and implementing, in the form of a method with appropriate tools, systemic principles and complex project and systems engineering. This method first formalizes and specifies the entire requirement set to consider. Second, based on these requirements, the method will enable the project team to structure, check, and demonstrate the project's coherence and feasibility from both the technological and organizational viewpoints. Lastly, the method should permit a constant D&D strategy and product management re‐evaluation, depending on the possible D&D project evolution. Developing demonstration software aims to provide the functionalities requested for the design, and future enterprise software implementation and maintenance, which should provide a complete D&D project Digital Mock‐Up being interoperable and connected to the tools and databases of the stakeholders’ information systems.