Hamid Lesani
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Hamid Lesani has a total of 31 co-authors. Here are the top co-authors by number of shared publications:
- Farrokh Aminifar
Quanta Technology, LLC, Raleigh, United States
3 shared publications - Alireza Fereidunian
Faculty of Electrical Engineering, K.N. Toosi University of Technology, Tehran, Iran
2 shared publications - Seyed Mahmoud Modaresi
Islamic Azad University
2 shared publications - A. Fereidunian
University of Tehran
1 shared publication A. Rajabloo
Islamic Azad Univesrity, Science and Technology Branch, Tehran Iran
1 shared publication- Ali Alizadeh
Huawei Technologies Canada, Montreal, QC, Canada
1 shared publication
Latest Publications
- Open Access
- 20 February 2024
- Published by Apex Publishing in Industrial Innovations: Requirements and Strategies
- Vol. 1 (4) , 409-422
Analyzing and Evaluating the Parameters of the Process of Innovation and Idea Generation
با شتابگیری استفاده از شبکههای هوشمند در نقاط مختلف دنیا و پیشرفتهای روزافزون آن، توجه و همگامی با این تکنولوژی و انطباق با تغییرات الکترونیکی از دیدگاه اسناد بالادستی و سند چشمانداز کشور، توسعه ملی امری ممکن به نظر میرسد. نوآوری در صنعت برق و زیرساختهای مرتبط با آن بهشدت موجب ایجاد ارزشافزوده و مزیت رقابتی برای سازمانها و نهادهای مرتبط با این صنعت میگردد. بنابراین هدف از این پژوهش، تحلیل و ارزیابی پارامترهای فرایند نوآوری و ایدهپردازی است. مطالعه حاضر بر اساس هدف کاربردی و ازنظر روش از نوع پیمایشی تحلیلی میباشد. ابتدا با انجام مطالعه کتابخانهای و بهرهگیری از پایگاههای علمی، پیشینه تحقیق بررسی و از طریق روش فراترکیب پارامترهای فرایند جذب ایده و نوآوری در سازمانها و مراکز تحقیقاتی شناسایی شد که صاحبنظران با آنها تعامل علمی و دانشی دارند. پس از مشخص شدن پارامترهای فرایند و میزان تأثیرگذاری آنها، مدل نظری پژوهش شکل میگیرد. سپس از طریق پرسشنامه نظرات 50 نفر از نمونههای آماری که از متخصصین دانشگاهی و صاحبنظران صنایع مرتبط بودند با استفاده از تکنیک تحلیل مسیر و روش معادلات ساختاری،...
- 20 February 2024
- Published by Apex Publishing in Industrial Innovations: Requirements and Strategies
- Vol. 1 (4) , 409-422
Open AccessAnalyzing and Evaluating the Parameters of the Process of Innovation and Idea Generation
با شتابگیری استفاده از شبکههای هوشمند در نقاط مختلف دنیا و پیشرفتهای روزافزون آن، توجه و همگامی با این تکنولوژی و انطباق با تغییرات الکترونیکی از دیدگاه اسناد بالادستی و سند چشمانداز کشور، توسعه ملی امری ممکن به نظر میرسد. نوآوری در صنعت برق و زیرساختهای مرتبط با آن بهشدت موجب ایجاد ارزشافزوده و مزیت رقابتی برای سازمانها و نهادهای مرتبط با این صنعت میگردد. بنابراین هدف از این پژوهش، تحلیل و ارزیابی پارامترهای فرایند نوآوری و ایدهپردازی است. مطالعه حاضر بر اساس هدف کاربردی و ازنظر روش از نوع پیمایشی تحلیلی میباشد. ابتدا با انجام مطالعه کتابخانهای و بهرهگیری از پایگاههای علمی، پیشینه تحقیق بررسی و از طریق روش فراترکیب پارامترهای فرایند جذب ایده و نوآوری در سازمانها و مراکز تحقیقاتی شناسایی شد که صاحبنظران با آنها تعامل علمی و دانشی دارند. پس از مشخص شدن پارامترهای فرایند و میزان تأثیرگذاری آنها، مدل نظری پژوهش شکل میگیرد. سپس از طریق پرسشنامه نظرات 50 نفر از نمونههای آماری که از متخصصین دانشگاهی و صاحبنظران صنایع مرتبط بودند با استفاده از تکنیک تحلیل مسیر و روش معادلات ساختاری،...
- Open Access
- 1 January 2024
- Published by Wiley in International Journal of Energy Research
- Vol. 2024 (1)
Operation Scheduling of Distribution Network with Photovoltaic/Wind/Battery Multi‐Microgrids and Reconfiguration considering Reliability and Self‐Healing
In this paper, a new simultaneous framework of distribution network operation is proposed based on the scheduling of photovoltaic/wind/battery multi‐microgrids with network reconfiguration considering self‐healing. The objective function is considered to minimize the energy losses, and multi‐microgrids cost and improve the reliability indices including minimization of energy not‐supplied (ENS) and minimizing system average interruption duration (SAIDI) and system average interruption frequency (SAIFI) indices. The optimization variables are defined as the situation of the distribution network switches to find the network’s optimal configuration with the installation location and size of renewable resources and battery energy storage during 24 hours. An improved beluga whale optimization (IBWO) based on a nonlinearly diminishing inertia weight (NDIW) approach is used to find the optimal variable set of the problem. The recommended methodology is implemented on 33‐bus and real 59‐bus distribution networks. The results demonstrated that by obtaining an optimal state of the network switches in the event of a fault, as well as the optimal scheduling of the two microgrids, the energy losses have decreased and the reliability indices have improved. The outcomes of the proposed methodology based on the hybrid multi‐microgrid allocation and network reconfiguration are stated that the losses, ENS, SAIDI, and SAIFI are reduced by 66.39%, 54.00%, 50.24%, and 33.61%, respectively, for 33‐bus network and are declined by 65.29%, 57.44%, 48.63%, and 62.33%, respectively, for the real 59‐bus Ahvaz network in comparison with the base network. The obtained results illustrated that in the condition of the network line outage, by simultaneously implementing the reconfiguration with the change of network switches and the optimal allocation and scheduling of HMGs in the network, self‐healing is provided to prevent a significant weakening of the network performance so that the resilience is improved in addition to minimizing the energy losses and the cost of HMG energy injection compared to the base network. The findings revealed that the objectives including losses, ENS, SAIFI, and SAIDI are increased by 78.29%, 33.00%, 83.33%, and 35.11%, respectively, due to outage of line 22 of the 33‐bus network and these objectives are increased by 52.32%, 10.30%, 32.29%, and 79.66%, respectively, due to outage of line 12 of the 59‐bus network compared with not considering the line outage. Moreover, the superior capability of the recommended NDIW‐based IBWO has been confirmed in comparison with the well‐known particle swarm optimizer (PSO) and ant lion optimizer (ALO) in solving the problem to achieve better objective value.
- 1 January 2024
- Published by Wiley in International Journal of Energy Research
- Vol. 2024 (1)
Open AccessOperation Scheduling of Distribution Network with Photovoltaic/Wind/Battery Multi‐Microgrids and Reconfiguration considering Reliability and Self‐Healing
In this paper, a new simultaneous framework of distribution network operation is proposed based on the scheduling of photovoltaic/wind/battery multi‐microgrids with network reconfiguration considering self‐healing. The objective function is considered to minimize the energy losses, and multi‐microgrids cost and improve the reliability indices including minimization of energy not‐supplied (ENS) and minimizing system average interruption duration (SAIDI) and system average interruption frequency (SAIFI) indices. The optimization variables are defined as the situation of the distribution network switches to find the network’s optimal configuration with the installation location and size of renewable resources and battery energy storage during 24 hours. An improved beluga whale optimization (IBWO) based on a nonlinearly diminishing inertia weight (NDIW) approach is used to find the optimal variable set of the problem. The recommended methodology is implemented on 33‐bus and real 59‐bus distribution networks. The results demonstrated that by obtaining an optimal state of the network switches in the event of a fault, as well as the optimal scheduling of the two microgrids, the energy losses have decreased and the reliability indices have improved. The outcomes of the proposed methodology based on the hybrid multi‐microgrid allocation and network reconfiguration are stated that the losses, ENS, SAIDI, and SAIFI are reduced by 66.39%, 54.00%, 50.24%, and 33.61%, respectively, for 33‐bus network and are declined by 65.29%, 57.44%, 48.63%, and 62.33%, respectively, for the real 59‐bus Ahvaz network in comparison with the base network. The obtained results illustrated that in the condition of the network line outage, by simultaneously implementing the reconfiguration with the change of network switches and the optimal allocation and scheduling of HMGs in the network, self‐healing is provided to prevent a significant weakening of the network performance so that the resilience is improved in addition to minimizing the energy losses and the cost of HMG energy injection compared to the base network. The findings revealed that the objectives including losses, ENS, SAIFI, and SAIDI are increased by 78.29%, 33.00%, 83.33%, and 35.11%, respectively, due to outage of line 22 of the 33‐bus network and these objectives are increased by 52.32%, 10.30%, 32.29%, and 79.66%, respectively, due to outage of line 12 of the 59‐bus network compared with not considering the line outage. Moreover, the superior capability of the recommended NDIW‐based IBWO has been confirmed in comparison with the well‐known particle swarm optimizer (PSO) and ant lion optimizer (ALO) in solving the problem to achieve better objective value.
- Open Access
- 1 January 2024
- Published by International Digital Organization for Scientific Information (IDOSI) in International Journal of Engineering
- Vol. 37 (8) , 1466-1474
Second Order Sliding Mode Control of Three Phase Neutral Point Clamped Inverter in Stationary Frame
Grid-tied Neutral-Point-Clamped (NPC) inverters have been widely used in various applications recently. A superior control method is required to achieve the desired performance of a grid-connected NPC inverter. Accordingly, a second-order sliding mode control (SOSMC) method, which is designed in the stationary frame, is utilized for achieving this aim in this paper. The super-twisting second-order sliding mode control is used for solving the chattering problem of conventional first-order sliding mode control (FOSMC). In comparison to control methods which are applied in rotation frame, this method is not required transformation from rotating frame to a-b-c frame and vice versa and decoupling of d and q components. The Lyapunov stability analysis is used for designing of this controller. The performance of proposed method is evaluated by simulation results implemented in MATLAB/Simulink software. The performance of the SOSMC is also compared with FOSMC. The results show that the incorporation of SOSMC can improve current reference tracking of the NPC inverter in different scenarios.
- 1 January 2024
- Published by International Digital Organization for Scientific Information (IDOSI) in International Journal of Engineering
- Vol. 37 (8) , 1466-1474
Open AccessSecond Order Sliding Mode Control of Three Phase Neutral Point Clamped Inverter in Stationary Frame
Grid-tied Neutral-Point-Clamped (NPC) inverters have been widely used in various applications recently. A superior control method is required to achieve the desired performance of a grid-connected NPC inverter. Accordingly, a second-order sliding mode control (SOSMC) method, which is designed in the stationary frame, is utilized for achieving this aim in this paper. The super-twisting second-order sliding mode control is used for solving the chattering problem of conventional first-order sliding mode control (FOSMC). In comparison to control methods which are applied in rotation frame, this method is not required transformation from rotating frame to a-b-c frame and vice versa and decoupling of d and q components. The Lyapunov stability analysis is used for designing of this controller. The performance of proposed method is evaluated by simulation results implemented in MATLAB/Simulink software. The performance of the SOSMC is also compared with FOSMC. The results show that the incorporation of SOSMC can improve current reference tracking of the NPC inverter in different scenarios.
- 20 October 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Delivery
- Vol. 38 (2) , 1440-1451
A Multi-Period Regulation Methodology for Reliability as Service Quality Considering Reward-Penalty Scheme
In distribution systems, reliability insurance and financial performance are often hard to reconcile due to a natural monopoly. While many studies have proposed regulatory design of reward-penalty scheme (RPS) as an effective performance-based regulation framework to compensate for this natural monopoly, little attention is devoted to consideration of RPS in reliability as service quality. In this paper a novel methodology is proposed for considering an RPS in regard to reliability assessment problems to ensure a reasonable balance between reliability improvement and financial performance. In the proposed methodology, the impact of the utilities' financial and reliability performance in one regulation period is considered as to how it influences the next periods, i.e. multi-period modeling. The implementation results in an IEEE test system are utilized to reveal possible improvements in both reliability and financial performance, which lead to the delivery of a satisfactory level of service quality to customers in both the short- and long-term. The proposed methodology can be regarded as a performance-based standard for reliability improvement and efficient investment in distribution systems.
- 20 October 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Delivery
- Vol. 38 (2) , 1440-1451
A Multi-Period Regulation Methodology for Reliability as Service Quality Considering Reward-Penalty Scheme
In distribution systems, reliability insurance and financial performance are often hard to reconcile due to a natural monopoly. While many studies have proposed regulatory design of reward-penalty scheme (RPS) as an effective performance-based regulation framework to compensate for this natural monopoly, little attention is devoted to consideration of RPS in reliability as service quality. In this paper a novel methodology is proposed for considering an RPS in regard to reliability assessment problems to ensure a reasonable balance between reliability improvement and financial performance. In the proposed methodology, the impact of the utilities' financial and reliability performance in one regulation period is considered as to how it influences the next periods, i.e. multi-period modeling. The implementation results in an IEEE test system are utilized to reveal possible improvements in both reliability and financial performance, which lead to the delivery of a satisfactory level of service quality to customers in both the short- and long-term. The proposed methodology can be regarded as a performance-based standard for reliability improvement and efficient investment in distribution systems.
- 1 February 2018
- Published by Zhejiang University Press in Frontiers of Information Technology & Electronic Engineering
- Vol. 19 (2) , 297-307
New method to determine optimum impedance of fault current limiters for symmetrical and/or asymmetrical faults in power systems
To select the type and value of the impedance of fault current limiters (FCLs) for power network designers, we introduce a new method to calculate the optimum value of FCL impedance depending on its...
- 1 February 2018
- Published by Zhejiang University Press in Frontiers of Information Technology & Electronic Engineering
- Vol. 19 (2) , 297-307
New method to determine optimum impedance of fault current limiters for symmetrical and/or asymmetrical faults in power systems
To select the type and value of the impedance of fault current limiters (FCLs) for power network designers, we introduce a new method to calculate the optimum value of FCL impedance depending on its...
- 13 November 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Industrial Informatics
- Vol. 14 (5) , 1909-1919
Long-Term Maintenance Scheduling and Budgeting in Electricity Distribution Systems Equipped With Automatic Switches
Maintenance management, as a key part of the asset management practices, plays a vital role in enhancing the reliability of the electricity distribution systems (EDS) where realizing a highly reliable EDS is being attributed higher and higher criticality in modern society. In this paper, a new approach is proposed to improve the reliability of EDS through optimal scheduling of preventive maintenance (PM) tasks and allocation of automatic switches. The suggested objective is to minimize a combined customer-based (SAIDI and SAIFI) and cost-based reliability indices. The total reliability cost (TRC) includes those associated with the corrective maintenance (CM) actions, PM tasks, and automatic switch investments. The proposed approach is implemented in three different scenarios: (1) switch placement, (2) PM tasks scheduling and budget management, as well as (3) a joint switch and PM tasks decision-making. The aforementioned scenarios are applied on a standard reliability test system (RBTS4) followed by multiple sensitivity analysis to further demonstrate the efficacy and performance of the proposed framework.
- 13 November 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Industrial Informatics
- Vol. 14 (5) , 1909-1919
Long-Term Maintenance Scheduling and Budgeting in Electricity Distribution Systems Equipped With Automatic Switches
Maintenance management, as a key part of the asset management practices, plays a vital role in enhancing the reliability of the electricity distribution systems (EDS) where realizing a highly reliable EDS is being attributed higher and higher criticality in modern society. In this paper, a new approach is proposed to improve the reliability of EDS through optimal scheduling of preventive maintenance (PM) tasks and allocation of automatic switches. The suggested objective is to minimize a combined customer-based (SAIDI and SAIFI) and cost-based reliability indices. The total reliability cost (TRC) includes those associated with the corrective maintenance (CM) actions, PM tasks, and automatic switch investments. The proposed approach is implemented in three different scenarios: (1) switch placement, (2) PM tasks scheduling and budget management, as well as (3) a joint switch and PM tasks decision-making. The aforementioned scenarios are applied on a standard reliability test system (RBTS4) followed by multiple sensitivity analysis to further demonstrate the efficacy and performance of the proposed framework.
- 25 October 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 33 (4) , 4275-4284
Resilience-Oriented Proactive Management of Microgrids Against Windstorms
This paper presents a microgrid (MG) proactive management framework to cope with adverse impacts of extreme windstorms. Upon receiving alerts for the forecasted windstorm, the framework finds a conservative schedule of MG with the minimum number of vulnerable branches in service while total load is served. The schedule ensures the MG normal operation prior to the windstorm while reducing the MG vulnerability at the event onset. The proposed method makes benefit of network reconfiguration, generation reschedule, conservation voltage regulation, optimal parameter settings of droop-controlled units, demand-side resources, and backup generation capacity. A vulnerability index (VI) is defined to assess the effectiveness of the proposed proactive management in reducing the MG vulnerability at the event onset. The proposed model is linearized which guarantees simplicity, robustness, and computational efficiency of the solution. The effectiveness of the proposed method is tested on a real-scale MG against a windstorm.
- 25 October 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 33 (4) , 4275-4284
Resilience-Oriented Proactive Management of Microgrids Against Windstorms
This paper presents a microgrid (MG) proactive management framework to cope with adverse impacts of extreme windstorms. Upon receiving alerts for the forecasted windstorm, the framework finds a conservative schedule of MG with the minimum number of vulnerable branches in service while total load is served. The schedule ensures the MG normal operation prior to the windstorm while reducing the MG vulnerability at the event onset. The proposed method makes benefit of network reconfiguration, generation reschedule, conservation voltage regulation, optimal parameter settings of droop-controlled units, demand-side resources, and backup generation capacity. A vulnerability index (VI) is defined to assess the effectiveness of the proposed proactive management in reducing the MG vulnerability at the event onset. The proposed model is linearized which guarantees simplicity, robustness, and computational efficiency of the solution. The effectiveness of the proposed method is tested on a real-scale MG against a windstorm.
- 2 October 2017
- Published by Wiley in International Transactions on Electrical Energy Systems
- Vol. 27 (11) , e2379
Analysis of the effect of location and failure rates of fault current limiters on substations reliability
- 2 October 2017
- Published by Wiley in International Transactions on Electrical Energy Systems
- Vol. 27 (11) , e2379
Analysis of the effect of location and failure rates of fault current limiters on substations reliability
- 12 May 2017
- Published by Springer Nature in Electrical Engineering
- Vol. 100 (2) , 823-838
Power transformer optimal design (PTOD) using an innovative heuristic method combined with FEM technique
- 12 May 2017
- Published by Springer Nature in Electrical Engineering
- Vol. 100 (2) , 823-838
Power transformer optimal design (PTOD) using an innovative heuristic method combined with FEM technique