Magnus Thor Jonsson
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Research Interests
Magnus Thor Jonsson has a total of 40 co-authors. Here are the top co-authors by number of shared publications:
- Halldor Palsson
Faculty of Industrial Engineering, Mechanical Engineering and Computer Science, School of Engineering and Natural Sciences, University of Iceland, Reykjavik, Iceland
8 shared publications - Björn Margeirsson
Faculty of Industrial Engineering, Mechanical Engineering and Computer Science, University of Iceland, Hjardarhagi 2-6, IS-107 Reykjavik, Iceland
3 shared publications - Fjola Jonsdottir
Faculty of Industrial Engineering, Mechanical Engineering and Computer Science, University of Iceland, 107 Reykjavik, Iceland
3 shared publications Radovan Gospavic
3 shared publications- Runar Unnthorsson
University of Iceland
3 shared publications Sigurjón Arason
3 shared publications
Latest Publications
- 16 July 2017
- Published by ASME International
Coupled Pump and Pipe System Analysis for Optimum Design of District Heating System
This paper describes a novel approach for optimizing a district heating distribution network under various flow rate conditions. For district heating systems, the demand or the flow and pressure at each node varies over the time of year. The flow control that affects the operational cost can be based on the variable speed and the on/off control on serial pumping or pressure controlled valves. In the pipe system design, the topology, or the pipe layout, and the pipe diameter is optimized using genetic algorithms. Standardized methods are used for calculating the pipe thickness, supports, anchors and the thermal expansion loops. The interconnection between the pipe system and the pump station design is discussed. The objective is to minimize the total or life cycle cost (capital maintenance and operational cost), subject to ensuring demands or constraints at all points. The results are compared to classical methods where the pump station and the pipe system are designed separately and the improvements are discussed. The problem is formulated by developing an objective function where the optimization parameters define the pump arrangement, pipe system topology, and pipe diameters. The pump station and pipe system optimization consist of selecting components from a pre-defined set of elements and is implemented with discrete decision variables. Optimization of pipe elements consists of optimizing the diameter, after the topology has been defined, and is implemented with discrete variables. Flow distribution and pressure analysis is performed. Thicknesses, pressure classes, supports, expansion loops and anchors are not part of the optimization parameters, but are determined during the evaluation of the objective function. Each time the objective function is evaluated, the pipe system is designed in a sub-optimization according to given loads. The pressure head constraints are used to design the pumping curves. The method is tested on a district heating system in Reykjavik, Iceland.
- 16 July 2017
- Published by ASME International
Coupled Pump and Pipe System Analysis for Optimum Design of District Heating System
This paper describes a novel approach for optimizing a district heating distribution network under various flow rate conditions. For district heating systems, the demand or the flow and pressure at each node varies over the time of year. The flow control that affects the operational cost can be based on the variable speed and the on/off control on serial pumping or pressure controlled valves. In the pipe system design, the topology, or the pipe layout, and the pipe diameter is optimized using genetic algorithms. Standardized methods are used for calculating the pipe thickness, supports, anchors and the thermal expansion loops. The interconnection between the pipe system and the pump station design is discussed. The objective is to minimize the total or life cycle cost (capital maintenance and operational cost), subject to ensuring demands or constraints at all points. The results are compared to classical methods where the pump station and the pipe system are designed separately and the improvements are discussed. The problem is formulated by developing an objective function where the optimization parameters define the pump arrangement, pipe system topology, and pipe diameters. The pump station and pipe system optimization consist of selecting components from a pre-defined set of elements and is implemented with discrete decision variables. Optimization of pipe elements consists of optimizing the diameter, after the topology has been defined, and is implemented with discrete variables. Flow distribution and pressure analysis is performed. Thicknesses, pressure classes, supports, expansion loops and anchors are not part of the optimization parameters, but are determined during the evaluation of the objective function. Each time the objective function is evaluated, the pipe system is designed in a sub-optimization according to given loads. The pressure head constraints are used to design the pumping curves. The method is tested on a district heating system in Reykjavik, Iceland.
- 16 July 2017
- Published by ASME International
Minimizing Visual Effects and Optimizing Routes and Locations for Geothermal Steam Gathering System
In geothermal power plants, the steam system is a costly component of the infrastructure in terms of construction requirements. The steam system consists of geothermal wells, well head equipment, pipelines and separators connecting wells to the separators and the separators to the power plant. This paper describes an approach for optimum design of a steam system, with focus on topology and route selection for pipelines transporting two-phase fluid from geothermal wells to a separation station and single-phase pipelines from the separator stations to the power plant. This article proposes a new approach for selecting the locations of the separators and power plant and routes for both two phase-flow and single-phase flow pipelines in a geothermal steam gathering system. Multiple weighted distance maps calculated by uniform cost Dijkstra’s algorithm are used to find the optimum location of a site for a steam separator based on the flow capacity of geothermal wells. The two-phase flow routes are monotonic and the incline is slight in order to minimize the pressure drop and the slug flow conditions in the pipeline. Once the location of separators has been optimized, the optimum location of the power plant can be determined based on the route selection for both the pipelines transporting steam to the power plant and the pipelines transporting the used geothermal fluid from the power plant to the injection wells. The objective is to minimize both cost and visual effects. A comparison of this method to traditional methods shows that when the method described in this paper is used, shorter routes and cheaper systems can be designed with less environmental impact.
- 16 July 2017
- Published by ASME International
Minimizing Visual Effects and Optimizing Routes and Locations for Geothermal Steam Gathering System
In geothermal power plants, the steam system is a costly component of the infrastructure in terms of construction requirements. The steam system consists of geothermal wells, well head equipment, pipelines and separators connecting wells to the separators and the separators to the power plant. This paper describes an approach for optimum design of a steam system, with focus on topology and route selection for pipelines transporting two-phase fluid from geothermal wells to a separation station and single-phase pipelines from the separator stations to the power plant. This article proposes a new approach for selecting the locations of the separators and power plant and routes for both two phase-flow and single-phase flow pipelines in a geothermal steam gathering system. Multiple weighted distance maps calculated by uniform cost Dijkstra’s algorithm are used to find the optimum location of a site for a steam separator based on the flow capacity of geothermal wells. The two-phase flow routes are monotonic and the incline is slight in order to minimize the pressure drop and the slug flow conditions in the pipeline. Once the location of separators has been optimized, the optimum location of the power plant can be determined based on the route selection for both the pipelines transporting steam to the power plant and the pipelines transporting the used geothermal fluid from the power plant to the injection wells. The objective is to minimize both cost and visual effects. A comparison of this method to traditional methods shows that when the method described in this paper is used, shorter routes and cheaper systems can be designed with less environmental impact.
- 12 February 2017
- Published by Springer Nature
- p. 955-966
Modelling and Analysis of a Horizontal Direct Chill Casting Process
- 12 February 2017
- Published by Springer Nature
- p. 955-966
Modelling and Analysis of a Horizontal Direct Chill Casting Process
- 1 July 2016
- Published by Elsevier in Geothermics
- Vol. 62, 1-11
Structural modeling of the casings in the IDDP-1 well: Load history analysis
- 1 July 2016
- Published by Elsevier in Geothermics
- Vol. 62, 1-11
Structural modeling of the casings in the IDDP-1 well: Load history analysis
- 1 May 2015
- Published by Elsevier in Geothermics
- Vol. 55, 126-137
Structural modeling of the casings in high temperature geothermal wells
- 1 May 2015
- Published by Elsevier in Geothermics
- Vol. 55, 126-137
Structural modeling of the casings in high temperature geothermal wells
- 29 July 2013
- Published by ASME International
Specified Maintenance of Steam Turbines in Geothermal Power Plants
In a geothermal power plant the working fluid used to produce electricity is often wet steam composed of corrosives chemicals. In this situation, more frequent maintenance of the equipment is required. By constructing an overview for maintenance in geothermal power plants and how it can be done with minimum power outages and cost, the geothermal energy can be made more competitive in comparison to other energy resources. This work is constructed as a part of a project, which has the aim of mapping the maintenance management system at the Hellisheiði geothermal power plant in Iceland. The object of the project is to establish Reliability Centered Maintenance (RCM) program for Hellisheiði power plant that can be utilized to establish efficient maintenance management procedures. The focus of this paper is to examine the steam turbines, which have been defined as one of the main subsystems of the power plant at Hellisheiði. A close look will be taken at the maintenance needed for the steam turbines by studying for example which parts break down and how frequently they fail. The local ability of the staff to repair or construct turbine parts on-site is explored. The paper explores how the maintenance and condition monitoring is carried out today and what can be improved in order to reduce cost. The data collected is analyzed using Failure Mode and Effect Analysis (FMEA) in order to get an overview of the system and to help organizing maintenance and condition monitoring of the power plant in the future. Furthermore, the paper presents an overview of currently employed maintenance methods at Hellisheiði power plant, the domestic ability for maintaining and repairing steam turbines and the power plant’s need for repairs. The results show that the need for maintenance of the geothermal steam turbines at Hellisheiði power plant is high and that on-site maintenance and repairs can decrease the cost.
- 29 July 2013
- Published by ASME International
Specified Maintenance of Steam Turbines in Geothermal Power Plants
In a geothermal power plant the working fluid used to produce electricity is often wet steam composed of corrosives chemicals. In this situation, more frequent maintenance of the equipment is required. By constructing an overview for maintenance in geothermal power plants and how it can be done with minimum power outages and cost, the geothermal energy can be made more competitive in comparison to other energy resources. This work is constructed as a part of a project, which has the aim of mapping the maintenance management system at the Hellisheiði geothermal power plant in Iceland. The object of the project is to establish Reliability Centered Maintenance (RCM) program for Hellisheiði power plant that can be utilized to establish efficient maintenance management procedures. The focus of this paper is to examine the steam turbines, which have been defined as one of the main subsystems of the power plant at Hellisheiði. A close look will be taken at the maintenance needed for the steam turbines by studying for example which parts break down and how frequently they fail. The local ability of the staff to repair or construct turbine parts on-site is explored. The paper explores how the maintenance and condition monitoring is carried out today and what can be improved in order to reduce cost. The data collected is analyzed using Failure Mode and Effect Analysis (FMEA) in order to get an overview of the system and to help organizing maintenance and condition monitoring of the power plant in the future. Furthermore, the paper presents an overview of currently employed maintenance methods at Hellisheiði power plant, the domestic ability for maintaining and repairing steam turbines and the power plant’s need for repairs. The results show that the need for maintenance of the geothermal steam turbines at Hellisheiði power plant is high and that on-site maintenance and repairs can decrease the cost.
- Open Access
- 9 November 2012
- Published by ASME International
- p. 635-642
Thermoelectric-Based Power Generator for Powering Microcontroller Based Security Camera
This paper presents the design, implementation and evaluation of a thermoelectric-based point of use power generation system with no moving parts. The power system was designed to be robust and stable, capable of being clamped onto the outer wall of a hot steam pipe with a temperature of over 160°C using only heat pipes and natural convection of ambient air for cooling. Several systems were built and tested. One system was built and tested at the Cooper Union in New York City. The power generation was evaluated for different ambient and steam pipe temperatures. The other systems were attached to an 85°C geothermal hot water pipe and a 100–120°C geothermal steam pipe in Iceland. The Cooper Union system was used to power two microcontroller based security cameras, one with wireless LAN and another with cellular connectivity. Additional testing of the PV voltage controller and the generator were conducted in Iceland. The results show that the system can be used to power surveillance systems, even in remote locations without access to the electrical grid. Because the system does not require grid access, it will run constantly, and hence improve security. Furthermore, the unit’s power generation is greater in colder environments that substantially degrade battery performance.
- 9 November 2012
- Published by ASME International
- p. 635-642
Open AccessThermoelectric-Based Power Generator for Powering Microcontroller Based Security Camera
This paper presents the design, implementation and evaluation of a thermoelectric-based point of use power generation system with no moving parts. The power system was designed to be robust and stable, capable of being clamped onto the outer wall of a hot steam pipe with a temperature of over 160°C using only heat pipes and natural convection of ambient air for cooling. Several systems were built and tested. One system was built and tested at the Cooper Union in New York City. The power generation was evaluated for different ambient and steam pipe temperatures. The other systems were attached to an 85°C geothermal hot water pipe and a 100–120°C geothermal steam pipe in Iceland. The Cooper Union system was used to power two microcontroller based security cameras, one with wireless LAN and another with cellular connectivity. Additional testing of the PV voltage controller and the generator were conducted in Iceland. The results show that the system can be used to power surveillance systems, even in remote locations without access to the electrical grid. Because the system does not require grid access, it will run constantly, and hence improve security. Furthermore, the unit’s power generation is greater in colder environments that substantially degrade battery performance.
- 1 August 2012
- Published by Elsevier in International Journal of Refrigeration
- Vol. 35 (5) , 1318-1326
Numerical modelling of temperature fluctuations in superchilled fish loins packaged in expanded polystyrene and stored at dynamic temperature conditions
- 1 August 2012
- Published by Elsevier in International Journal of Refrigeration
- Vol. 35 (5) , 1318-1326
Numerical modelling of temperature fluctuations in superchilled fish loins packaged in expanded polystyrene and stored at dynamic temperature conditions