Kristian Schatz
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Kristian Schatz has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Uwe Rüppel
Institute of Numerical Methods and Informatics in Civil Engineering, Technical University of Darmstadt, 64287 Darmstadt, Germany
2 shared publications D. Ullrich
Technische Universität Darmstadt
1 shared publicationJ. Schlittenlacher
Technische Universität Darmstadt
1 shared publication- Wolfgang Ellermeier
Institute of Psychology, Technical University of Darmstadt, Darmstadt, Germany
1 shared publication
Latest Publications
- 17 June 2014
- Published by American Society of Civil Engineers (ASCE)
- p. 267-274
Visualization of a Fire Risk Index Method with Combined Deferred Maintenance Cost Estimation within a BIM Environment
The goals of fire protection activities are to prevent fires, rescue people and ensure the effectiveness of firefighting. To achieve these goals for complex buildings, holistic fire protection concepts are developed which should take into account the special characteristics of each building. To ensure fire safety during the building lifecycle, a maintenance strategy is required. This includes recurring site inspections by experts, especially when a building needs to be refurbished or in the context of a technical due diligence during real estate transactions. If a malfunction of a fire safety element is detected in the context of these inspections, this is called a fire protection deficiency. These deficiencies decrease the fire safety rating of the building, increase the risk level, and result in deferred maintenance costs. For the analysis of the fire risk level and for risk comparisons between buildings and fire protection concepts, different techniques and approaches are available and are summarized under the term risk methods. A problem during this process is that findings and results from risk assessments are difficult to bring together with the real building. Information of the influence of individual fire safety deficiencies (technical, structural fire protection elements/components) on the risk level of the whole building and the associated repair and replacement costs are not directly related. This relationship must be associated in the expert's mind based on different documents. To overcome these limitations and to support the planning of deferred maintenance tasks, the goal of the presented approach is to visualize all required information within a BIM environment.
- 17 June 2014
- Published by American Society of Civil Engineers (ASCE)
- p. 267-274
Visualization of a Fire Risk Index Method with Combined Deferred Maintenance Cost Estimation within a BIM Environment
The goals of fire protection activities are to prevent fires, rescue people and ensure the effectiveness of firefighting. To achieve these goals for complex buildings, holistic fire protection concepts are developed which should take into account the special characteristics of each building. To ensure fire safety during the building lifecycle, a maintenance strategy is required. This includes recurring site inspections by experts, especially when a building needs to be refurbished or in the context of a technical due diligence during real estate transactions. If a malfunction of a fire safety element is detected in the context of these inspections, this is called a fire protection deficiency. These deficiencies decrease the fire safety rating of the building, increase the risk level, and result in deferred maintenance costs. For the analysis of the fire risk level and for risk comparisons between buildings and fire protection concepts, different techniques and approaches are available and are summarized under the term risk methods. A problem during this process is that findings and results from risk assessments are difficult to bring together with the real building. Information of the influence of individual fire safety deficiencies (technical, structural fire protection elements/components) on the risk level of the whole building and the associated repair and replacement costs are not directly related. This relationship must be associated in the expert's mind based on different documents. To overcome these limitations and to support the planning of deferred maintenance tasks, the goal of the presented approach is to visualize all required information within a BIM environment.
- 6 December 2013
- Published by Springer Nature
- p. 1113-1121
Investigating Human Factors in Fire Evacuation: A Serious-Gaming Approach
- 6 December 2013
- Published by Springer Nature
- p. 1113-1121
Investigating Human Factors in Fire Evacuation: A Serious-Gaming Approach