Angus Jeang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Angus Jeang has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
An Jen Chiang
Kaohsiung Vet Gen Hosp, Dept Obstet & Gynecol, Kaohsiung, Taiwan
2 shared publicationsAbdur Rahim
Department of Business Administration, University of New Brunswick
1 shared publicationPei Yu Tung
Feng Chia Univ, Dept Ind Engn & Syst Management, Taichung, Taiwan
1 shared publicationPo Sheng Chiang
Feng Chia Univ, Dept Ind Engn & Syst Management, Taichung, Taiwan
1 shared publication
Latest Publications
- 1 April 2018
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 118, 180-201
Robust parameters determination for ergonomical product design via computer musculoskeletal modeling and multi-objective optimization
- 1 April 2018
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 118, 180-201
Robust parameters determination for ergonomical product design via computer musculoskeletal modeling and multi-objective optimization
- 29 January 2018
- Published by Taylor & Francis in International Journal of Systems Science: Operations & Logistics
- Vol. 6 (3) , 193-236
Lot size determination for finite horizon under the effect of productivity and quality learning process
Traditional models for determining economic production quantity assume a constant production rate. One result of this assumption is that the number of units produced in a given period is constant. The constant production rate assumption is not valid whenever an operator begins production of a new product, changes to a new machine and restarts after a long break, or implements a new production process. In such situations, the learning effect on production planning and inventory management cannot be ignored. The conventional Wright's learning curve is a curve that solely depicts productivity increasing at a constant percentage as a cumulative number of units are produced. Thus, in addition to the productivity learning process, the quality learning process should also be considered. With the recent development of learning curves that simultaneously take into account quality and productivity, a modified production inventory model has been built to periodically determine the optimal lot size for a finite plan horizon. The productivity considered is the unit production time, while the quality concerned is the unit standard deviation of the production quality level. For the purposes of explanation and comparison, four cases are introduced in this research, and examples are provided for demonstration.
- 29 January 2018
- Published by Taylor & Francis in International Journal of Systems Science: Operations & Logistics
- Vol. 6 (3) , 193-236
Lot size determination for finite horizon under the effect of productivity and quality learning process
Traditional models for determining economic production quantity assume a constant production rate. One result of this assumption is that the number of units produced in a given period is constant. The constant production rate assumption is not valid whenever an operator begins production of a new product, changes to a new machine and restarts after a long break, or implements a new production process. In such situations, the learning effect on production planning and inventory management cannot be ignored. The conventional Wright's learning curve is a curve that solely depicts productivity increasing at a constant percentage as a cumulative number of units are produced. Thus, in addition to the productivity learning process, the quality learning process should also be considered. With the recent development of learning curves that simultaneously take into account quality and productivity, a modified production inventory model has been built to periodically determine the optimal lot size for a finite plan horizon. The productivity considered is the unit production time, while the quality concerned is the unit standard deviation of the production quality level. For the purposes of explanation and comparison, four cases are introduced in this research, and examples are provided for demonstration.
- 6 March 2017
- Published by Springer Nature in Journal of Intelligent Manufacturing
- Vol. 30 (3) , 1221-1245
Robust DEA methodology via computer model for conceptual design under uncertainty
- 6 March 2017
- Published by Springer Nature in Journal of Intelligent Manufacturing
- Vol. 30 (3) , 1221-1245
Robust DEA methodology via computer model for conceptual design under uncertainty
- 24 February 2015
- Published by Taylor & Francis in International Journal of Systems Science: Operations & Logistics
- Vol. 2 (4) , 211-230
Stochastic project management via computer simulation and optimisation method
The proposed approach combines program evaluation review technique (PERT) and critical path method (CPM) into a single-project scheduling problem. Given that activity time and cost are uncertain, a robust design for project scheduling using the response surface methodology (RSM) is presented in the proposed research. The controllable variables are the mean and tolerance of activity time, which are both cost related. In order to simulate an actual application, activity times, activity tolerances, activity time costs and activity tolerance costs are all randomly created from known probabilistic distributions. The probabilistic values of completion time within a promised date and of total cost under a given budget are also considered as response values for statistical optimisation. As is already known, the solutions found using RSM are solutions that are optimised for a single objective only. In the case of multiple objectives, actions for further optimisation are necessitated within a limited project budget, restricted completion time, allowable total cost probability, and acceptable completion time probability. Hence, after gathering response functions using RSM, an optimisation technique, mathematical programming, is used to formulate the problem in an integral fashion and solve multiple objectives under various constraints.
- 24 February 2015
- Published by Taylor & Francis in International Journal of Systems Science: Operations & Logistics
- Vol. 2 (4) , 211-230
Stochastic project management via computer simulation and optimisation method
The proposed approach combines program evaluation review technique (PERT) and critical path method (CPM) into a single-project scheduling problem. Given that activity time and cost are uncertain, a robust design for project scheduling using the response surface methodology (RSM) is presented in the proposed research. The controllable variables are the mean and tolerance of activity time, which are both cost related. In order to simulate an actual application, activity times, activity tolerances, activity time costs and activity tolerance costs are all randomly created from known probabilistic distributions. The probabilistic values of completion time within a promised date and of total cost under a given budget are also considered as response values for statistical optimisation. As is already known, the solutions found using RSM are solutions that are optimised for a single objective only. In the case of multiple objectives, actions for further optimisation are necessitated within a limited project budget, restricted completion time, allowable total cost probability, and acceptable completion time probability. Hence, after gathering response functions using RSM, an optimisation technique, mathematical programming, is used to formulate the problem in an integral fashion and solve multiple objectives under various constraints.
- 2 September 2014
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 53 (5) , 1503-1526
Project management for uncertainty with multiple objectives optimisation of time, cost and reliability
This research adopts an approach that uses computer simulation and statistical analysis of uncertain activity time, activity cost, due date and project budget to address quality and the learning process with regard to project scheduling. Since the learning process affects the scheduling problem, a Cobb–Douglas multiplicative power model is used to represent the relationship between the dependent variable, which is the standard deviation of activity time, and the independent variables, which are the cumulative trials and the mean of activity time. The mean value and standard deviation are used to randomly generate activity times for project scheduling analysis. Response surface methodology (RSM) is used in order to develop a rationale of the time-cost trade-off problem. The solutions found with RSM are optimised only for a single objective, such as project completion time, total project cost, completion time probability and total cost probability. Thus, multiple objectives for further optimisation become necessary and a limited project budget, restricted completion time, allowable total cost probability and acceptable completion time probability have to be considered at the same time as the learning effect. With response functions from RSM, compromise programming is adopted in order to formulate the proposed project scheduling problem for multi-objective optimisation.
- 2 September 2014
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 53 (5) , 1503-1526
Project management for uncertainty with multiple objectives optimisation of time, cost and reliability
This research adopts an approach that uses computer simulation and statistical analysis of uncertain activity time, activity cost, due date and project budget to address quality and the learning process with regard to project scheduling. Since the learning process affects the scheduling problem, a Cobb–Douglas multiplicative power model is used to represent the relationship between the dependent variable, which is the standard deviation of activity time, and the independent variables, which are the cumulative trials and the mean of activity time. The mean value and standard deviation are used to randomly generate activity times for project scheduling analysis. Response surface methodology (RSM) is used in order to develop a rationale of the time-cost trade-off problem. The solutions found with RSM are optimised only for a single objective, such as project completion time, total project cost, completion time probability and total cost probability. Thus, multiple objectives for further optimisation become necessary and a limited project budget, restricted completion time, allowable total cost probability and acceptable completion time probability have to be considered at the same time as the learning effect. With response functions from RSM, compromise programming is adopted in order to formulate the proposed project scheduling problem for multi-objective optimisation.