Stephen March
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Stephen March has a total of 16 co-authors. Here are the top co-authors by number of shared publications:
- Boris Stepanov
Fusion Technology, EPFL-CRPP, Villigen, Aargau Switzerland 5232
2 shared publications - Rainer Wesche
Superconductivity, EPFL-CRPP, Villigen PSI Switzerland 5232
2 shared publications - Alfredo Portone
Fusion for Energy, Barcelona, Spain
1 shared publication - Davide Uglietti
École Polytechnique Fédérale de Lausanne (EPFL), Swiss Plasma Center (SPC)
1 shared publication Eckhard Theisen
Babcock Nöll GmbH, Würzburg, Germany
1 shared publicationElena Fernandez-Cano
Fusion for Energy
1 shared publication
Latest Publications
- 26 November 2014
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 25 (3) , 1-4
Collective Flux Jumps Observed During Operation of the EDIPO Magnets
The tilted head race track coils of the EDIPO test facility are wound with cable-in-conduit conductors made by high current density Nb3Sn strands, Jc = 2400 A/mm2 at 12 T 4.2 K. Since the commissioning of the coils, frequent voltage spikes were observed at the quench detection taps during the low current range of operation, completely disappearing above 2 T. The large amplitude of some spikes triggered the quench detection system: the parameters for protection (voltage thresholds and validation time) had to be modified for the voltage pairs monitoring the windings. The occurrence of partial flux jumps in the high current density strands is known from former characterization. The fast data acquisition of the quench detection system, with 800 Hz sampling frequency, allows investigation of the dynamics and propagation of the voltage spikes in the various layers of the winding. From the collected data of several runs of operation, statistics of amplitude, initial location, propagation and reproducibility were drawn, looking also for correlation with the operation history, e.g., first cool-down, ramp up versus ramp down, ramp rate, etc. The energy released by the flux jumps is conservatively estimated by the time integration of the voltage spikes and discussed in terms of energy margin and heat removal rate in the layers. In conclusion, the limitation of the use of high current density Nb3Sn strands in high current conductors is discussed.
- 26 November 2014
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 25 (3) , 1-4
Collective Flux Jumps Observed During Operation of the EDIPO Magnets
The tilted head race track coils of the EDIPO test facility are wound with cable-in-conduit conductors made by high current density Nb3Sn strands, Jc = 2400 A/mm2 at 12 T 4.2 K. Since the commissioning of the coils, frequent voltage spikes were observed at the quench detection taps during the low current range of operation, completely disappearing above 2 T. The large amplitude of some spikes triggered the quench detection system: the parameters for protection (voltage thresholds and validation time) had to be modified for the voltage pairs monitoring the windings. The occurrence of partial flux jumps in the high current density strands is known from former characterization. The fast data acquisition of the quench detection system, with 800 Hz sampling frequency, allows investigation of the dynamics and propagation of the voltage spikes in the various layers of the winding. From the collected data of several runs of operation, statistics of amplitude, initial location, propagation and reproducibility were drawn, looking also for correlation with the operation history, e.g., first cool-down, ramp up versus ramp down, ramp rate, etc. The energy released by the flux jumps is conservatively estimated by the time integration of the voltage spikes and discussed in terms of energy margin and heat removal rate in the layers. In conclusion, the limitation of the use of high current density Nb3Sn strands in high current conductors is discussed.
- 23 November 2011
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 22 (3) , 4202905
The EDIPO Project: Status and Outlook
The aim of this paper is to present an up to date review of the status of the European DIPOle (EDIPO) project - whose objective is to build a new facility to perform both DC and AC tests of large force flow superconductor samples in high magnetic background field (up to ~12.5 T) - as well as an outlook on the final commissioning of the magnet in CRPP-PSI foreseen for 2012. Concerning the actual status, the results presented focus on the recent steps carried out in the manufacturing of the magnet assembly, in particular the cold mass assembly, its impregnation and the final acceptance tests. Moreover, results are reported regarding the identification and repair of an inter-turn short carried out on EDIPO Pole 1 in the second half of 2010. As far as the commissioning of EDIPO is concerned, an up-to-date report is provided on the preparation of the facility at CRPP (e.g. mechanical structures, high temperature current leads, quench detection, control system, etc.) as well as its acceptance and final commissioning (e.g. magnet reception tests, commissioning program, etc.).
- 23 November 2011
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 22 (3) , 4202905
The EDIPO Project: Status and Outlook
The aim of this paper is to present an up to date review of the status of the European DIPOle (EDIPO) project - whose objective is to build a new facility to perform both DC and AC tests of large force flow superconductor samples in high magnetic background field (up to ~12.5 T) - as well as an outlook on the final commissioning of the magnet in CRPP-PSI foreseen for 2012. Concerning the actual status, the results presented focus on the recent steps carried out in the manufacturing of the magnet assembly, in particular the cold mass assembly, its impregnation and the final acceptance tests. Moreover, results are reported regarding the identification and repair of an inter-turn short carried out on EDIPO Pole 1 in the second half of 2010. As far as the commissioning of EDIPO is concerned, an up-to-date report is provided on the preparation of the facility at CRPP (e.g. mechanical structures, high temperature current leads, quench detection, control system, etc.) as well as its acceptance and final commissioning (e.g. magnet reception tests, commissioning program, etc.).