Sahand Ghavidel
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Sahand Ghavidel has a total of 2 co-authors. Here are the top co-authors by number of shared publications:
- Mohsen Gitizadeh
Department of Electrical and Electronics Engineering, Shiraz University of Technology, Shiraz, Iran
2 shared publications - Jamshid Aghaei
School of Engineering and Technology, Central Queensland University, Rockhampton, QLD, Australia
1 shared publication
Latest Publications
- 4 July 2014
- Published by Taylor & Francis in IETE Journal of Research
- Vol. 60 (4) , 319-327
Using SVC to Economically Improve Transient Stability in Long Transmission Lines
The aim of this paper is to select the optimal size, location, and parameter setting of static var compensator (SVC) to improve power system stability in long transmission lines. Two objectives are considered in this paper to improve both the transient stability of the system and the SVC investment cost. In this study, the actual model of the long transmission line is considered to accurately determine the SVC location. By using the actual model of the line for long transmission lines, the SVC investment cost is reduced and the results have more accuracy than that found when the simplified model was used. In addition to placement of SVC for improving the system transient stability, an extra controller is used and adjusted to enhance the performance of the SVC. The problem is formulated as a form of multi-objective function and then multi-objective particle swarm optimization (MOPSO) is used to solve the problem and find the solution. In this research, results are presented as a set of responses to help the decision maker choose the appropriate response. A two-area test system with long transmission line is used to show the effectiveness and efficiency of the proposed method. The results of the non-linear simulation show that the optimum sizing, siting, and parameter setting of SVC can improve greatly the system's transient stability and reduce the SVC investment cost.
- 4 July 2014
- Published by Taylor & Francis in IETE Journal of Research
- Vol. 60 (4) , 319-327
Using SVC to Economically Improve Transient Stability in Long Transmission Lines
The aim of this paper is to select the optimal size, location, and parameter setting of static var compensator (SVC) to improve power system stability in long transmission lines. Two objectives are considered in this paper to improve both the transient stability of the system and the SVC investment cost. In this study, the actual model of the long transmission line is considered to accurately determine the SVC location. By using the actual model of the line for long transmission lines, the SVC investment cost is reduced and the results have more accuracy than that found when the simplified model was used. In addition to placement of SVC for improving the system transient stability, an extra controller is used and adjusted to enhance the performance of the SVC. The problem is formulated as a form of multi-objective function and then multi-objective particle swarm optimization (MOPSO) is used to solve the problem and find the solution. In this research, results are presented as a set of responses to help the decision maker choose the appropriate response. A two-area test system with long transmission line is used to show the effectiveness and efficiency of the proposed method. The results of the non-linear simulation show that the optimum sizing, siting, and parameter setting of SVC can improve greatly the system's transient stability and reduce the SVC investment cost.
- 2 January 2014
- Published by Taylor & Francis in IETE Journal of Research
- Vol. 60 (1) , 33-41
Improving Transient Stability with Multi-objective Allocation and Parameter Setting of SVC in a Multi-machine Power System
This paper aims to select the optimal location, size, and setting parameters of SVC (Static Var Compensator) controller using MOPSO (multi-objective particle swarm optimization) to improve the power system stability in a multi-machine power system. Though power system stabilizers are mandatory requirements for damping of oscillations, its performance still gets affected by changes in network configurations, load variations, etc. Hence, installations of SVC have been suggested in this paper to achieve appreciable damping of system oscillations. However, the performance of SVC highly depends upon its parameters, suitable location, and sizes in the power network. In order to find the solution, this problem is formulated as a multi-objective function. Then, MOPSO is used to find the best answers. In this paper, two objectives are considered to improve both the transient stability of the system and the SVC investment cost. The proposed method was tested on the 10-machine 39-busbar New England test system. The results of the nonlinear simulation show that the optimum sizing, siting, and parameter setting of SVC can improve greatly the transient stability of the multi-machine power system.
- 2 January 2014
- Published by Taylor & Francis in IETE Journal of Research
- Vol. 60 (1) , 33-41
Improving Transient Stability with Multi-objective Allocation and Parameter Setting of SVC in a Multi-machine Power System
This paper aims to select the optimal location, size, and setting parameters of SVC (Static Var Compensator) controller using MOPSO (multi-objective particle swarm optimization) to improve the power system stability in a multi-machine power system. Though power system stabilizers are mandatory requirements for damping of oscillations, its performance still gets affected by changes in network configurations, load variations, etc. Hence, installations of SVC have been suggested in this paper to achieve appreciable damping of system oscillations. However, the performance of SVC highly depends upon its parameters, suitable location, and sizes in the power network. In order to find the solution, this problem is formulated as a multi-objective function. Then, MOPSO is used to find the best answers. In this paper, two objectives are considered to improve both the transient stability of the system and the SVC investment cost. The proposed method was tested on the 10-machine 39-busbar New England test system. The results of the nonlinear simulation show that the optimum sizing, siting, and parameter setting of SVC can improve greatly the transient stability of the multi-machine power system.