WWWenming Wang

Wenming Wang

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Wenming Wang has a total of 4 co-authors. Here are the top co-authors by number of shared publications:

  • Minghao Xiong

    College of Mechanical and Transportation Engineering, China University of Petroleum, Beijing, China

    2 shared publications
  • Shimin Zhang

    College of Mechanical and Transportation Engineering, China University of Petroleum, Beijing, China

    2 shared publications
  • Yingchun Chen

    College of Mechanical and Transportation Engineering, China University of Petroleum, Beijing, China

    2 shared publications
  • Hang Zhang

    College of Mechanical and Transportation Engineering, China University of Petroleum, Beijing, China

    1 shared publication

Latest Publications

  • Experimental study on axial load transfer behavior of a coiled tubing stuck in a steel catenary riser: At the stage of the coiled tubing un-helical buckled

    by Yingchun Chen, Shimin Zhang, Wenming Wang, Minghao Xiong, Hang Zhang

    Coiled tubing can be used for steel catenary riser pigging operations to remove wax and other debris attached on the interior of steel catenary riser to recover production and ensure safety. Due to its low rigidity, coiled tubing would deform which might finally damage coiled tubing and steel catenary riser. Thus, in order to ensure safety and reliability of the operation, this article proceeded experimental study on the axial load transfer behavior of a coiled tubing stuck in a steel catenary riser when the coiled tubing has not yet helical buckled. According to the experimental results, the inner pipe’s axial force transfer efficiency is always less than 1; the outer pipe of “unfixed steel catenary riser boundary” would elongate forced by the inner pipe within it, which makes the injected displacement of inner pipe within outer pipe of “unfixed steel catenary riser boundary” bigger than the injected displacement of inner pipe within outer pipe of “fixed steel catenary riser boundary” system at the same force-out; before the inner pipe helical buckles, inner pipe’s force transfer efficiency for unfixed and fixed system can be considered as the same. The research done above might provide important theoretical supports for the steel catenary riser pigging operation.


  • Experimental study on axial load transfer behavior of a coiled tubing stuck in a marine riser

    by Yingchun Chen, Shimin Zhang, Wenming Wang, Minghao Xiong

    After years of using, the marine riser would need pigging operation to remove wax and other debris attached to its interior to recover production. Due to its low stiffness, coiled tubing would buckle when performing the marine riser pigging operation, which would make the injecting force not able to completely transfer into its end and finally damage coiled tubing and riser. Thus, in order to ensure the safety and reliability of the operation, this article reports an experimental study on this topic by building an indoor pipe-in-pipe platform. According to the experimental results, the inner pipe’s axial force transfer efficiency is always less than 1. When injecting force is less than the inner pipe’s critical helical buckling load, the inner pipe’s axial load transfer efficiency is basically the same under “unfixed boundary” and “fixed boundary” at the same force-out. When injecting force is bigger than the inner pipe’s critical helical buckling load, “unfixed boundary” would help decrease the inner pipe’s axial load transfer efficiency; when the injecting force is three times the critical helical buckling load, the inner pipe’s axial load transfer efficiency of “unfixed boundary” can be 3% smaller than that of “fixed boundary.” As the outer pipe of “unfixed boundary” would elongate, its axial load transfer would be “delay” compared with “fixed boundary,” which means injected displacement of “unfixed boundary” inner pipe would be bigger than those of “fixed boundary” at the same force-out. The research done above might provide important theoretical supports for the marine riser pigging operation.