Sulee Bunjongjit
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Sulee Bunjongjit has a total of 15 co-authors. Here are the top co-authors by number of shared publications:
- Atthapol Ngaopitakkul
King Mongkut’s Institute of Technology Ladkrabang
5 shared publications - Chaiyan Jettanasen
School of Engineering, King Mongkut’s Institute of Technology Ladkrabang, Bangkok 10520, Thailand
2 shared publications - Natthanon Phannil
School of Engineering, King Mongkut’s Institute of Technology Ladkrabang, Bangkok, Thailand
2 shared publications - Santipont Ananwattanaporn
School of Engineering, King Mongkut’s Institute of Technology Ladkrabang, Bangkok 10520, Thailand
2 shared publications - Suntiti Yoomak
School of Engineering, King Mongkut’s Institute of Technology Ladkrabang, Bangkok 10520, Thailand
2 shared publications - Atthapol Ngaopitakkul
School of Engineering, King Mongkut’s Institute of Technology Ladkrabang, Bangkok 10520, Thailand
1 shared publication
Latest Publications
- Open Access
Downtime Reduction with Fast Restart Function in a Beverage Production System
Bottled-beverage production systems require considerable machinery and sophisticated control systems. A malfunction in the production system can result in machine stoppages, thereby decreasing productivity and resulting in the production output not meeting the required target. Therefore, the problem of frequent stoppages of the production system must be resolved. The ‘Fast Restart Function’ is a proposed feature that can help reduce machine downtime by decreasing the time required for the product to drain from the conveyor. In this study, using this strategy, the investigated manufacturing system’s efficiency increased from 86.81% to 90.29%, enabling an increase in the average production capacity by 27,187 bottles per day, i.e., a 3.48 percent increment of the daily capacity. When employed in inefficient production systems or systems facing frequent shutdowns, this system is of considerable value for mitigating production stoppages.
Open AccessDowntime Reduction with Fast Restart Function in a Beverage Production System
Bottled-beverage production systems require considerable machinery and sophisticated control systems. A malfunction in the production system can result in machine stoppages, thereby decreasing productivity and resulting in the production output not meeting the required target. Therefore, the problem of frequent stoppages of the production system must be resolved. The ‘Fast Restart Function’ is a proposed feature that can help reduce machine downtime by decreasing the time required for the product to drain from the conveyor. In this study, using this strategy, the investigated manufacturing system’s efficiency increased from 86.81% to 90.29%, enabling an increase in the average production capacity by 27,187 bottles per day, i.e., a 3.48 percent increment of the daily capacity. When employed in inefficient production systems or systems facing frequent shutdowns, this system is of considerable value for mitigating production stoppages.
- Open Access
- 11 November 2021
- Published by MDPI AG in Applied Sciences
- Vol. 11 (22) , 10619
Application of Probabilistic Neural Networks Using High-Frequency Components’ Differential Current for Transformer Protection Schemes to Discriminate between External Faults and Internal Winding Faults in Power Transformers
Internal and external faults in a power transformer are discriminated in this paper using an algorithm based on a combination of a discrete wavelet transform (DWT) and a probabilistic neural network (PNN). DWT decomposes high-frequency fault components using the maximum coefficients of a ¼ cycle DWT as input patterns for the training process in a decision algorithm. A division algorithm between a zero sequence of post-fault differential current waveforms and the differential current coefficient in the ¼ cycle DWT is used to detect the maximum ratio and faults. The simulation system uses various study cases based on Thailand’s electricity transmission and distribution systems. The simulation results demonstrated that the PNN and BPNN are effectively implemented and perform fault detection with satisfactory accuracy. However, the PNN method is most suitable for detecting internal and external faults, and the maximum coefficient algorithm is the most effective in detecting the fault. This study will be useful in differential protection for power transformers.
- 11 November 2021
- Published by MDPI AG in Applied Sciences
- Vol. 11 (22) , 10619
Open AccessApplication of Probabilistic Neural Networks Using High-Frequency Components’ Differential Current for Transformer Protection Schemes to Discriminate between External Faults and Internal Winding Faults in Power Transformers
Internal and external faults in a power transformer are discriminated in this paper using an algorithm based on a combination of a discrete wavelet transform (DWT) and a probabilistic neural network (PNN). DWT decomposes high-frequency fault components using the maximum coefficients of a ¼ cycle DWT as input patterns for the training process in a decision algorithm. A division algorithm between a zero sequence of post-fault differential current waveforms and the differential current coefficient in the ¼ cycle DWT is used to detect the maximum ratio and faults. The simulation system uses various study cases based on Thailand’s electricity transmission and distribution systems. The simulation results demonstrated that the PNN and BPNN are effectively implemented and perform fault detection with satisfactory accuracy. However, the PNN method is most suitable for detecting internal and external faults, and the maximum coefficient algorithm is the most effective in detecting the fault. This study will be useful in differential protection for power transformers.
- Open Access
- 4 February 2021
- Published by MDPI AG in Applied Sciences
- Vol. 11 (4) , 1398
Retrofitted Existing Residential Building Design in Energy and Economic Aspect According to Thailand Building Energy Code
Electrical energy usage in buildings is a challenging issue because many old buildings were not originally built to achieve energy efficiency. Thus, retrofitting old buildings to net-zero buildings can benefit both the owner and electric utilities. In this study, the BEC (building energy code) software was used to evaluate energy aspects of retrofitted buildings in compliance with Thailand’s building energy code to achieve a net-zero energy building. In addition, economic aspects were also studied to verify the feasibility for a project’s owner to invest in a retrofitted existing building. An existing residential building in Thailand was used as a case study. The results in terms of energy after retrofitting existing buildings into net-zero energy buildings show that the total energy consumption can be reduced by 49.36%. From an economic perspective, the investment cost for a retrofitted building can be compensated by energy saving in terms of discounted payback period (DPP) for approximately 4.36 years and has an IRR (internal rate of return) value of 19.23%. This result evidences the potential in both energy and economy for a project’s owner to invest in a retrofitted existing building in compliance with the building code, with potential for implementation with benefits on both electrical utilities and the project’s owner.
- 4 February 2021
- Published by MDPI AG in Applied Sciences
- Vol. 11 (4) , 1398
Open AccessRetrofitted Existing Residential Building Design in Energy and Economic Aspect According to Thailand Building Energy Code
Electrical energy usage in buildings is a challenging issue because many old buildings were not originally built to achieve energy efficiency. Thus, retrofitting old buildings to net-zero buildings can benefit both the owner and electric utilities. In this study, the BEC (building energy code) software was used to evaluate energy aspects of retrofitted buildings in compliance with Thailand’s building energy code to achieve a net-zero energy building. In addition, economic aspects were also studied to verify the feasibility for a project’s owner to invest in a retrofitted existing building. An existing residential building in Thailand was used as a case study. The results in terms of energy after retrofitting existing buildings into net-zero energy buildings show that the total energy consumption can be reduced by 49.36%. From an economic perspective, the investment cost for a retrofitted building can be compensated by energy saving in terms of discounted payback period (DPP) for approximately 4.36 years and has an IRR (internal rate of return) value of 19.23%. This result evidences the potential in both energy and economy for a project’s owner to invest in a retrofitted existing building in compliance with the building code, with potential for implementation with benefits on both electrical utilities and the project’s owner.
- Open Access
- 15 May 2020
- Published by MDPI AG in Applied Sciences
- Vol. 10 (10) , 3415
Design and Application of Daylight-Based Lighting Controller on LED Luminaire
This paper proposes a control circuit for Light Emitting Diode (LED) luminaire based on the amount of daylight. This system uses both natural daylight and artificial light from a luminaire to reach the desired illuminance on a working plane. The control circuit operates by receiving an illuminance value from a light sensor and comparing it with a set value in the microcontroller before limiting the light intensity of LED by sending a control Pulse Width Modulation (PWM) signal to the LED driver. In the experimental setup, the controller and a physical model of a working space were built in order to field test the LED daylight control circuit. Electrical characteristics such as voltage, current, and power were measured with a power meter. Illumination characteristics in terms of illuminance on a working plane were determined using a lux meter. The results from actual field tests revealed that this LED control circuit was able to reduce the power consumption of the lighting system while keeping the illuminance on the working plane at the standard value. Both simulation results and the actual experiment of the control circuit proved that it could be used to improve the energy efficiency of both newly installed and retrofitted lighting systems.
- 15 May 2020
- Published by MDPI AG in Applied Sciences
- Vol. 10 (10) , 3415
Open AccessDesign and Application of Daylight-Based Lighting Controller on LED Luminaire
This paper proposes a control circuit for Light Emitting Diode (LED) luminaire based on the amount of daylight. This system uses both natural daylight and artificial light from a luminaire to reach the desired illuminance on a working plane. The control circuit operates by receiving an illuminance value from a light sensor and comparing it with a set value in the microcontroller before limiting the light intensity of LED by sending a control Pulse Width Modulation (PWM) signal to the LED driver. In the experimental setup, the controller and a physical model of a working space were built in order to field test the LED daylight control circuit. Electrical characteristics such as voltage, current, and power were measured with a power meter. Illumination characteristics in terms of illuminance on a working plane were determined using a lux meter. The results from actual field tests revealed that this LED control circuit was able to reduce the power consumption of the lighting system while keeping the illuminance on the working plane at the standard value. Both simulation results and the actual experiment of the control circuit proved that it could be used to improve the energy efficiency of both newly installed and retrofitted lighting systems.
- Open Access
- 7 November 2018
- Published by MDPI AG in Sustainability
- Vol. 10 (11) , 4075
Feasibility Study and Impact of Daylight on Illumination Control for Energy-Saving Lighting Systems
The main goal of energy conservation should be reducing the consumption of energy resources. Due to energy and environmental concerns in recent years, to reduce energy consumption in a lighting system, which has been one of the prime targets of energy saving, daylighting has been investigated and has become one of the energy-efficiency techniques widely applied in buildings. This paper presents an analysis of T5 fluorescent luminaire lighting control using daylight in a building. The study is conducted in two parts; simulation of a lecture room using the daylighting function of the DIALux program is performed to estimate the effect of daylighting on a task area (workplane). Another part is an experimental setup to evaluate the performance of a lighting control unit that is installed for a T5 fluorescent luminaire with a dimmable electronic ballast. The efficiency of the lighting control in term of illumination on the task area and energy consumption are also evaluated and compared with the standard case. The simulation results show that daylighting increases illuminance on a task area, especially on the window side, so the lighting system can significantly reduce its power consumption compared with a standard case (without lighting control). The experimental result shows that upon installing the lighting control with daylighting, both the average illuminance and the energy consumption in each time period are decreased compared with in the standard case. Lighting control with daylighting tries to set the average illuminance on a task area to less than 500 lux, corresponding to the amount of daylight passing through window shutters. The obtained results are useful for the design of a T5 fluorescent luminaire with lighting control using daylighting in a building lighting system for energy efficiency and reducing energy consumption, including the average illuminance on the task area, according to a relevant standard.
- 7 November 2018
- Published by MDPI AG in Sustainability
- Vol. 10 (11) , 4075
Open AccessFeasibility Study and Impact of Daylight on Illumination Control for Energy-Saving Lighting Systems
The main goal of energy conservation should be reducing the consumption of energy resources. Due to energy and environmental concerns in recent years, to reduce energy consumption in a lighting system, which has been one of the prime targets of energy saving, daylighting has been investigated and has become one of the energy-efficiency techniques widely applied in buildings. This paper presents an analysis of T5 fluorescent luminaire lighting control using daylight in a building. The study is conducted in two parts; simulation of a lecture room using the daylighting function of the DIALux program is performed to estimate the effect of daylighting on a task area (workplane). Another part is an experimental setup to evaluate the performance of a lighting control unit that is installed for a T5 fluorescent luminaire with a dimmable electronic ballast. The efficiency of the lighting control in term of illumination on the task area and energy consumption are also evaluated and compared with the standard case. The simulation results show that daylighting increases illuminance on a task area, especially on the window side, so the lighting system can significantly reduce its power consumption compared with a standard case (without lighting control). The experimental result shows that upon installing the lighting control with daylighting, both the average illuminance and the energy consumption in each time period are decreased compared with in the standard case. Lighting control with daylighting tries to set the average illuminance on a task area to less than 500 lux, corresponding to the amount of daylight passing through window shutters. The obtained results are useful for the design of a T5 fluorescent luminaire with lighting control using daylighting in a building lighting system for energy efficiency and reducing energy consumption, including the average illuminance on the task area, according to a relevant standard.
- 30 April 2015
- Published by Praise Worthy Prize in International Review of Electrical Engineering (IREE)
- Vol. 10 (2) , 244
Relation of Influential Parameters to Back-Flashover on the Insulators in Transmission Tower
- 30 April 2015
- Published by Praise Worthy Prize in International Review of Electrical Engineering (IREE)
- Vol. 10 (2) , 244
Relation of Influential Parameters to Back-Flashover on the Insulators in Transmission Tower