Jacobus Krige Visser
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Jacobus Krige Visser has a total of 10 co-authors. Here are the top co-authors by number of shared publications:
Rina Peach
Department of Engineering and Technology Management, University of Pretoria, South Africa
2 shared publicationsA. J. Van Niekerk
Graduate School of Technology Management, University of Pretoria
1 shared publication- Arnold Botha
University of Pretoria
1 shared publication Carl Kirstein
Department of Engineering and Technology Management, University of Pretoria
1 shared publicationDarryl James Summers
University of Pretoria
1 shared publicationHerman Ellis
University of Pretoria
1 shared publication
Latest Publications
- 1 May 2021
- Published by Stellenbosch University in South African Journal of Industrial Engineering
- Vol. 32 (1) , 24-36
FACTORS THAT INFLUENCE THE DECISION TO OUTSOURCE MAINTENANCE IN THE PROCESSING INDUSTRY
FACTORS THAT INFLUENCE THE DECISION TO OUTSOURCE MAINTENANCE IN THE PROCESSING INDUSTRY
- 1 May 2021
- Published by Stellenbosch University in South African Journal of Industrial Engineering
- Vol. 32 (1) , 24-36
FACTORS THAT INFLUENCE THE DECISION TO OUTSOURCE MAINTENANCE IN THE PROCESSING INDUSTRY
FACTORS THAT INFLUENCE THE DECISION TO OUTSOURCE MAINTENANCE IN THE PROCESSING INDUSTRY
- 1 December 2020
- Published by Stellenbosch University in South African Journal of Industrial Engineering
- Vol. 31 (4) , 104-114
MEASURING HUMAN FACTORS IN MAINTENANCE: A LITERATURE REVIEW
Strategies to manage the human factors in maintenance are documented in the maintenance management and human sciences spaces. However, it is unclear from the literature which indicators and measurements should be used for these factors. It is also unclear how to integrate them into traditional maintenance performance frameworks. This article summarises the maintenance human factors and measurements found in the literature. A systematic literature review of the most often cited human factors indicated a statistically significant correlation with the `human factors analysis and classification system - maintenance extension' framework. A hierarchal maintenance measurement framework that includes these maintenance human factors is proposed.
- 1 December 2020
- Published by Stellenbosch University in South African Journal of Industrial Engineering
- Vol. 31 (4) , 104-114
MEASURING HUMAN FACTORS IN MAINTENANCE: A LITERATURE REVIEW
Strategies to manage the human factors in maintenance are documented in the maintenance management and human sciences spaces. However, it is unclear from the literature which indicators and measurements should be used for these factors. It is also unclear how to integrate them into traditional maintenance performance frameworks. This article summarises the maintenance human factors and measurements found in the literature. A systematic literature review of the most often cited human factors indicated a statistically significant correlation with the `human factors analysis and classification system - maintenance extension' framework. A hierarchal maintenance measurement framework that includes these maintenance human factors is proposed.
- Open Access
- 1 November 2018
- Published by Stellenbosch University in South African Journal of Industrial Engineering
- Vol. 29 (3) , 82-91
RISK MANAGEMENT DURING OUTAGE PROJECTS AT POWER PLANTS
RISK MANAGEMENT DURING OUTAGE PROJECTS AT POWER PLANTS
- 1 November 2018
- Published by Stellenbosch University in South African Journal of Industrial Engineering
- Vol. 29 (3) , 82-91
Open AccessRISK MANAGEMENT DURING OUTAGE PROJECTS AT POWER PLANTS
RISK MANAGEMENT DURING OUTAGE PROJECTS AT POWER PLANTS
- Open Access
- 1 December 2017
- Published by Stellenbosch University in South African Journal of Industrial Engineering
- Vol. 28 (4) , 66-79
RISK MODELLING OF HEAVY MOBILE EQUIPMENT TO DETERMINE OPTIMUM REPLACEMENT AGES
RISK MODELLING OF HEAVY MOBILE EQUIPMENT TO DETERMINE OPTIMUM REPLACEMENT AGES
- 1 December 2017
- Published by Stellenbosch University in South African Journal of Industrial Engineering
- Vol. 28 (4) , 66-79
Open AccessRISK MODELLING OF HEAVY MOBILE EQUIPMENT TO DETERMINE OPTIMUM REPLACEMENT AGES
RISK MODELLING OF HEAVY MOBILE EQUIPMENT TO DETERMINE OPTIMUM REPLACEMENT AGES
- Open Access
- 1 August 2016
- Published by Stellenbosch University in South African Journal of Industrial Engineering
- Vol. 27 (2) , 177-189
A MAINTENANCE PERFORMANCE MEASUREMENT FRAMEWORK THAT INCLUDES MAINTENANCE HUMAN FACTORS: A CASE STUDY FROM THE ELECTRICITY TRANSMISSION INDUSTRY
A MAINTENANCE PERFORMANCE MEASUREMENT FRAMEWORK THAT INCLUDES MAINTENANCE HUMAN FACTORS: A CASE STUDY FROM THE ELECTRICITY TRANSMISSION INDUSTRY
- 1 August 2016
- Published by Stellenbosch University in South African Journal of Industrial Engineering
- Vol. 27 (2) , 177-189
Open AccessA MAINTENANCE PERFORMANCE MEASUREMENT FRAMEWORK THAT INCLUDES MAINTENANCE HUMAN FACTORS: A CASE STUDY FROM THE ELECTRICITY TRANSMISSION INDUSTRY
A MAINTENANCE PERFORMANCE MEASUREMENT FRAMEWORK THAT INCLUDES MAINTENANCE HUMAN FACTORS: A CASE STUDY FROM THE ELECTRICITY TRANSMISSION INDUSTRY
- Open Access
- 9 March 2015
- Published by Stellenbosch University in South African Journal of Industrial Engineering
- Vol. 26 (1) , 44-58
EVALUATION OF THE IMPORTANCE OF THE 39 SUBJECTS DEFINED BY THE GLOBAL FORUM FOR MAINTENANCE AND ASSET MANAGEMENT
EVALUATION OF THE IMPORTANCE OF THE 39 SUBJECTS DEFINED BY THE GLOBAL FORUM FOR MAINTENANCE AND ASSET MANAGEMENT
- 9 March 2015
- Published by Stellenbosch University in South African Journal of Industrial Engineering
- Vol. 26 (1) , 44-58
Open AccessEVALUATION OF THE IMPORTANCE OF THE 39 SUBJECTS DEFINED BY THE GLOBAL FORUM FOR MAINTENANCE AND ASSET MANAGEMENT
EVALUATION OF THE IMPORTANCE OF THE 39 SUBJECTS DEFINED BY THE GLOBAL FORUM FOR MAINTENANCE AND ASSET MANAGEMENT
- 1 January 2015
- Published by Springer Nature
- p. 307-319
An Investigation into Technology Advancement for Switchgear at a Processing Plant
- 1 January 2015
- Published by Springer Nature
- p. 307-319
An Investigation into Technology Advancement for Switchgear at a Processing Plant
- 1 January 2015
- Published by Taylor & Francis in Australian Journal of Multi-Disciplinary Engineering
- Vol. 11 (2) , 147-156
Effectiveness of the Performance and Reliability Optimisation Model in Electricity Generation
Since 2008 the electricity supply in South Africa has at times been unable to fulfil in the growing demand for electricity. Various initiatives were launched to alleviate this situation by increasing the capacity or reducing the demand. One of these initiatives was the introduction of a performance and reliability optimisation (PRO) model at 13 fossil power stations in South Africa. A research project was conducted to determine the effectiveness of the PRO model and to determine whether it was successful in improving plant availability and in reducing energy losses. The expectation was that the PRO model would also increase plant performance through increased preventive maintenance compliance. This paper discusses an analysis of maintenance history from the SAP information system reports and other performance data at the power stations as well as a survey from 70 respondents. The investigation indicated that the plant performance did not improve significantly after implementation of the PRO model although there was a significant improvement in preventive maintenance and schedule compliance. A number of factors that contribute towards poor plant performance were also identified and ranked. The survey indicated that the age of the plant, lack of discipline and production pressure were major contributors.
- 1 January 2015
- Published by Taylor & Francis in Australian Journal of Multi-Disciplinary Engineering
- Vol. 11 (2) , 147-156
Effectiveness of the Performance and Reliability Optimisation Model in Electricity Generation
Since 2008 the electricity supply in South Africa has at times been unable to fulfil in the growing demand for electricity. Various initiatives were launched to alleviate this situation by increasing the capacity or reducing the demand. One of these initiatives was the introduction of a performance and reliability optimisation (PRO) model at 13 fossil power stations in South Africa. A research project was conducted to determine the effectiveness of the PRO model and to determine whether it was successful in improving plant availability and in reducing energy losses. The expectation was that the PRO model would also increase plant performance through increased preventive maintenance compliance. This paper discusses an analysis of maintenance history from the SAP information system reports and other performance data at the power stations as well as a survey from 70 respondents. The investigation indicated that the plant performance did not improve significantly after implementation of the PRO model although there was a significant improvement in preventive maintenance and schedule compliance. A number of factors that contribute towards poor plant performance were also identified and ranked. The survey indicated that the age of the plant, lack of discipline and production pressure were major contributors.
- Open Access
- 15 January 2012
- Published by Stellenbosch University in South African Journal of Industrial Engineering
- Vol. 21 (2)
THE ROLE OF RELATIONSHIP MANAGEMENT IN THE SUCCESSFUL OUTSOURCING OF MAINTENANCE
THE ROLE OF RELATIONSHIP MANAGEMENT IN THE SUCCESSFUL OUTSOURCING OF MAINTENANCE
- 15 January 2012
- Published by Stellenbosch University in South African Journal of Industrial Engineering
- Vol. 21 (2)
Open AccessTHE ROLE OF RELATIONSHIP MANAGEMENT IN THE SUCCESSFUL OUTSOURCING OF MAINTENANCE
THE ROLE OF RELATIONSHIP MANAGEMENT IN THE SUCCESSFUL OUTSOURCING OF MAINTENANCE
- Open Access
- 15 January 2012
- Published by Stellenbosch University in South African Journal of Industrial Engineering
- Vol. 17 (1)
IMPROVING PROJECT SCHEDULE ESTIMATES USING HISTORICAL DATA AND SIMULATION
ENGLISH Many projects are not completed on time or within the original budget. This is caused by uncertainty in project variables as well as the occurrence of risk events. A study was done to determine ways of measuring the risk in development projects executed by a mining company in South Africa. The main objective of the study was to determine whether historical project data would provide a more accurate means of estimating the total project duration. Original estimates and actual completion times for tasks of a number of projects were analysed and compared. The results of the study indicated that a more accurate total duration for a project could be obtained by making use of historical project data. The accuracy of estimates could be improved further by building a comprehensive project schedule database within a specific industry. AFRIKAANSE OPSOMMING: Verskeie projekte word nie binne die oorspronklike skedule of begroting voltooi nie. Dit word dikwels veroorsaak deur onsekerheid oor projekveranderlikes en die voorkoms van risikos. 'n Studie is gedoen om 'n metode te ontwikkel om risiko te meet vir ontwikkelingsprojekte van 'n mynmaatskappy in Suid Afrika. Die hoofdoel van die studie was om te bepaal of historiese projekdata gebruik kon word om 'n akkurater tydsduur vir 'n projek te beraam. Die geraamde tydsduur van take vir 'n aantal projekte is ontleed en vergelyk met die werklike tydsduur. Die resultate van die studie het getoon dat 'n akkurater totale tydsduur vir die projek verkry kon word deur gebruik te maak van historiese projekdata. Die akkuraatheid kan verder verbeter word deur 'n databasis van projekskedules vir 'n bepaalde industrie te ontwikkel en by datum te hou.
- 15 January 2012
- Published by Stellenbosch University in South African Journal of Industrial Engineering
- Vol. 17 (1)
Open AccessIMPROVING PROJECT SCHEDULE ESTIMATES USING HISTORICAL DATA AND SIMULATION
ENGLISH Many projects are not completed on time or within the original budget. This is caused by uncertainty in project variables as well as the occurrence of risk events. A study was done to determine ways of measuring the risk in development projects executed by a mining company in South Africa. The main objective of the study was to determine whether historical project data would provide a more accurate means of estimating the total project duration. Original estimates and actual completion times for tasks of a number of projects were analysed and compared. The results of the study indicated that a more accurate total duration for a project could be obtained by making use of historical project data. The accuracy of estimates could be improved further by building a comprehensive project schedule database within a specific industry. AFRIKAANSE OPSOMMING: Verskeie projekte word nie binne die oorspronklike skedule of begroting voltooi nie. Dit word dikwels veroorsaak deur onsekerheid oor projekveranderlikes en die voorkoms van risikos. 'n Studie is gedoen om 'n metode te ontwikkel om risiko te meet vir ontwikkelingsprojekte van 'n mynmaatskappy in Suid Afrika. Die hoofdoel van die studie was om te bepaal of historiese projekdata gebruik kon word om 'n akkurater tydsduur vir 'n projek te beraam. Die geraamde tydsduur van take vir 'n aantal projekte is ontleed en vergelyk met die werklike tydsduur. Die resultate van die studie het getoon dat 'n akkurater totale tydsduur vir die projek verkry kon word deur gebruik te maak van historiese projekdata. Die akkuraatheid kan verder verbeter word deur 'n databasis van projekskedules vir 'n bepaalde industrie te ontwikkel en by datum te hou.