Robert J. Card has a total of 32 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Northeast Transmission Line 108“× 84” Interconnect—Innovative Design Strategies to Overcome Space Constraints

    by Christine Kirby, Eric Hernandez, J. Warren, Kevin Tran, Ram Chakradhar, Robert Card

    The City of Houston’s (City’s) Northeast Water Purification Plant (NEWPP) supplies an 84-in. steel transmission line that serves the northern Hou | POSTER

  • Innovative Steel Casing Pipe Installation Using Mechanical Interlocking Joints

    by Brent Keil, Robert Card, Trevor Gonterman

    Trenchless construction techniques eliminate the need to open-cut roadways, railroads, canals, city street intersections, and other locations where trenches for pipe and casing installations are inconvenient or can impact the general public’s safety. Large diameter (24 inch and greater casing) trenchless techniques include microtunneling, pipe jacking, auger boring, and pipe ramming. Steel casing is often the product of choice for these techniques due to its strength, toughness, flexibility, resistance to high jacking forces, and butt-welded joints. Mechanical interlocking joints have steadily gained acceptance and use as a substitute for butt welded joints on steel casing pipe. The interlocking joints eliminate the need for time-intensive field butt welding and the associated higher cost. Fully machined interlocking connectors manufactured per ASTM A1097 are preinstalled in the factory and when joined in the field, are flush with the outside diameter of the pipe providing no additional drag or increased jacking force requirements. This paper will discuss the use and installation of mechanical interlocking field joints for casing installations with case histories. The paper will assist engineers and owners with casing design and specification considerations, and discuss the efficiencies gained with the various styles of innovative mechanical interlocking joints.

  • Analysis and Design of Buried Steel Water Pipelines in Seismic Areas

    by Spyros A. Karamanos, Gregory C. Sarvanis, Brent D. Keil, Robert J. Card

    This paper offers an overview of available methodologies and provisions for the structural analysis and mechanical design of buried welded steel water pipelines subjected to earthquake action. Both transient (wave-shaking) and permanent ground actions (from tectonic faults, soil subsidence, landslides, and liquefaction-induced lateral spreading) are considered. In the first part of the paper, following a brief presentation of seismic hazards, modeling of the interacting pipeline–soil system is discussed in terms of either simple analytical models or more rigorous finite elements, pinpointing their main features. The second part of the paper outlines pipeline resistance, with emphasis on the corresponding limit states. Possible mitigation measures for reducing seismic effects are presented, and the possibility of employing gasketed joints in seismic areas is discussed. Finally, the discussed analysis methodologies and design provisions are applied in a design example of a buried steel water pipeline located in an area with severe seismic action.


  • Steel Pipe Installation in Poor Soil Conditions: A Determination of Optimum Trench Width

    by Robert J. Card, Brent Keil

    A common and practical rule of thumb for trench widths when installing steel pipe is to keep the trench as narrow as possible and still allow for the needed compaction equipment to consolidate the embedment around the pipe, particularly in the haunch area. Pipe deflection is caused by the soil and live loads above the pipe and it is resisted by the support of the side fill soil next to the pipe. In poor native soil conditions there is sometimes a concern about enough soil support in the trench wall to prevent over-deflection of the pipe. Some design engineers in these cases have looked for guidance on how to properly analyze the pipe soil interaction and develop a procedure that keeps the pipe within the recommended deflection limits. Methods sometimes used include making the trench substantially wider, developing a ratio of the apparent side fill stiffness to the apparent embedment soil stiffness or even encasing the pipe. This paper will review poor trench wall conditions and provide a practical, analytical method for analyzing these conditions based on soil mechanics and the pipe soil interaction. Prevention of over-deflection of the steel pipe and other adverse conditions that poor trench wall soils can create will be discussed and evaluated. This paper will offer the design engineer tools to develop adequate trench widths in poor soils.

  • Mechanical Response of Steel Pipe Welded Lap Joints in Seismic Areas

    by Spyros A. Karamanos, Evangelia Koritsa, Brent D. Keil, Robert J. Card, Patricia Pappa

    Nonlinear finite element simulation tools are employed to investigate the bending capacity of internally-pressurized double-welded lap pipeline joints for a typical steel, with D | t value equal to 191.5. The study constitutes the first part of a comprehensive investigation on welded lap joints, which comprises both numerical simulations and experimental testing. The on-going research project is aimed at providing better understanding of welded lap joint behavior under extreme bending loading conditions, towards developing efficient design guidelines and safeguarding the structural integrity of steel water pipelines imposed to severe ground-induced actions. Herein, numerical work is presented, focusing on the global behavior of the lap joints, as well as on the value of local strains developed at critical locations. The present numerical results can be considered as preliminary, aiming at the efficient preparation and design of the upcoming experimental work.


  • Getting Ahead of a Pipeline Failure: Proactive Condition Assessment and Rehabilitation for a 48-Inch PCCP Wastewater Force Main in West Palm Beach

    by Ray Thomson, Vivek Galav, Robert J. Card, Shawn Waldeck

    The City of West Palm Beach, Florida, public utilities department (City) provides water and wastewater services to 120,000 people in West Palm Beach and the Town of Palm Beach (Town). The City’s wastewater collection system includes gravity sewers, force mains, and more than 120 lift stations, with all flows eventually being conveyed to the East Central Regional Water Reclamation Facility through a single force main. The force main is constructed of 42-inch and 48-inch prestressed concrete cylinder pipe (PCCP). The force main was constructed in the mid-1970s under two separate contracts. Price Brothers provided 11,000 feet of 42-inch pipe and 4,800 feet of 48-inch lined cylinder pipe (LCP) for Contract 1 (east of Interstate 95); Interpace manufactured the remaining 13,600 feet of 48-inch embedded cylinder pipe (ECP) for Contract 2 (west of I-95). The history of prestressing wire failures for pipe manufactured by Interpace is well documented. Although the force main has provided nearly 40 years of continuous service, the City recognized the vulnerability of their conveyance system with no redundant pipeline in place. Because the force main passes through the City’s drinking water catchment area, the devastating impacts on public health if a pipe failure and sewage spill occurred made it clear that proactive management of this critical asset was needed. The City engaged Jacobs and Pure Technologies to work together to perform a condition assessment of the entire force main and then develop a rehabilitation plan to address any issues. A condition assessment investigation plan was developed for using Pure’s in-pipe sensing devices to detect leaks, gas pockets, and broken prestressing wires. No leaks were detected, and a limited number of gas pockets were identified. Of greatest concern, however, was the significant number of individual pipe segments (169 total or 23%) of the Interpace 48-inch pipe that had broken wire wrap distress, ranging from 5 to 100 broken wire wraps in a segment. By comparison, few segments of the Price Brothers pipe were found to have broken wire wraps. Based on the degree of wire distress in the 48-inch Interpace pipe segments, the City elected to move quickly to evaluate alternatives for rehabilitation; select a solution; and proceed with design and construction to ensure reliable service, safeguard the City’s water supply, and protect the local environment. This paper will present the results of the condition assessment; a technical overview of rehabilitation alternatives and the selected approach (using cured-in-place-pipe technology); site-specific constraints for performing the work in a highly developed part of the City, including crossing a high-end golf course; techniques and lessons learned for public communications and stakeholder engagement; and project costs.

  • Finite Element Analysis of the Mechanical Behavior of Mitered Steel Pipe Elbows under Bending and Pressure

    by Spyros A. Karamanos, Konstantinos Antoniou, Brent Keil, Robert J. Card

    Using finite element simulation tools, which account for both geometric and material nonlinearities, the bending capacity of mitered steel pipe bends is investigated. First, numerical results are reported on the elastic behaviour of two steel typical grade 40 steel mitered elbows with D/t values equal to 192 and 240, with the purpose of calculating flexibility and stress intensity factors. Furthermore, the elastic-plastic response of the two bends is also examined towards identifying their ultimate capacity and the corresponding mode of failure. Internal pressure effects on the structural response are also examined. The present paper addresses some important features of mitered steel pipe elbow response that may arise in geohazard areas, towards safeguarding the structural integrity of steel water pipelines subjected to severe ground-induced actions.


  • C303—A Pipe Material in Search of a History and Searching for a Name

    by George F. Ruchti, Robert J. Card

    AWWA C303 pipe has been known as Pretensioned Concrete Cylinder Pipe and Bar Wrapped Concrete Cylinder Pipe, without having made any changes to its structure. While this can be confusing, it relates to the hybrid nature of the product. While it has been used extensively in some of the western states and in most of the far western states (those west of the Rockies), it is a new product to the eastern market, where it is currently being promoted. This paper will address the complexity of the nature of the product, relate to its history and provide an insight to its manufacture and design. Although not a new material by any sense of the word, it is new to many potential users; owners, engineers and contractors. Also, the eastern market will almost certainly involve some variations to the product’s historical experience. These variations should not cause undue concern as long as they are recognized. History, experience and knowledge are essential ingredients in providing a beneficial new tool in the pipe industry’s tool box.

  • Lessons Learned in the Design, Manufacture, Shipping, and Installation of the 108-inch Integrated Pipeline (IPL) Section 15-1

    by Robert J. Card, Ed Weaver, Randall Payton, Richard Mielke, Shah Rahman

    The Tarrant Regional Water District (TRWD) and the City of Dallas Water Utilities (DWU) are engaged in the planning, design and implementation of a 350 MGD raw water transmission system. Referred to as the Integrated Pipeline Project (IPL), the system consists of approximately 150 miles of 84- to primarily 108-inch diameter pipeline, a 5 mile 120-inch diameter tunnel, six 100—350 MGD pump stations, one 450 MG balancing reservoir, and ancillary facilities. When complete, the “integrated” system will provide a critically important source of water for the rapidly growing Dallas-Fort Worth Metroplex for the next five decades and beyond. After years of study, followed by design and construction of a 2 mile, 108-inch steel water pipe demonstration project, the Line J Project, the first segment of the pipeline, Section 15-1, bid in February 2014 and was awarded in March 2014. Steel pipe was chosen for the construction. Pipelines of this diameter and length are not common and come with their own set of challenges from the design, manufacture, shipping and installation standpoints. This paper will review design of this piping material and the practical aspects of furnishing and installing a line of this magnitude, with particular emphasis on lessons learned on both the Line J and the Section 15-1 Projects from the view point of the Owners, Engineer and Manufacturer.

  • Analysis and Behavior of Steel Pipe Welded Lap Joints in Geohazard Areas

    by Spyros A. Karamanos, Evangelia Koritsa, Brent Keil, Robert J. Card

    Using advanced finite element simulation tools, which account for both geometric and material nonlinearities, the bending capacity of welded lap pipeline joints is investigated. Following the analysis of plain pipes, numerical results are reported for two steel typical grade 40 pipes, single-welded or double-welded, with D/t values equal to 150 and 240 respectively. Internal pressure effects are also examined, as well as the effects of bell-spigot gap. The results of the present study focus on the value of local strains developed at critical locations and are aimed at providing better understanding of welded lap joint behavior under extreme bending loading conditions. This may allow for the development of design methodologies in geohazard areas where welded joints are required, in order to safeguard the structural integrity of steel water pipelines imposed to severe ground-induced actions.