El Miloudi El Koursi
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
El Miloudi El Koursi has a total of 13 co-authors. Here are the top co-authors by number of shared publications:
- Jean-Luc Bruyelle
Univ Lille, IFSTTAR, North France, Villeneuve Dascq, France
2 shared publications - Simon Collart-Dutilleul
Univ. Lille Nord de France, IFSTTAR
2 shared publications Aymeric Butin
Univ Lille Nord de France, IFSTTAR, ESTAS, F-59650 Villeneuve d'Ascq, France
1 shared publication- Conor O'NEill
NewRail Newcastle Univ, Newcastle Upon Tyne, Tyne & Wear, England
1 shared publication François Baranowski
Univ Lille Nord de France, IFSTTAR, ESTAS, F-59650 Villeneuve d'Ascq, France
1 shared publication- François Flamant
Univ Lille Nord de France, IFSTTAR, ESTAS, F-59650 Villeneuve d'Ascq, France
1 shared publication
Latest Publications
- 1 December 2018
- Published by Elsevier in Transportation Research Part A: Policy and Practice
- Vol. 118, 280-291
Design solutions to improve resilience of metro vehicle to blast events
- 1 December 2018
- Published by Elsevier in Transportation Research Part A: Policy and Practice
- Vol. 118, 280-291
Design solutions to improve resilience of metro vehicle to blast events
- Open Access
- 21 March 2017
- Published by Springer Nature in European Transport Research Review
- Vol. 9 (2) , 13
A CPN/B method transformation framework for railway safety rules formal validation
- 21 March 2017
- Published by Springer Nature in European Transport Research Review
- Vol. 9 (2) , 13
Open AccessA CPN/B method transformation framework for railway safety rules formal validation
- 28 January 2016
- Published by David Publishing Company in Journal of Civil Engineering and Architecture
- Vol. 10 (1)
Railway Accident Prevention and Infrastructure Protection
- 28 January 2016
- Published by David Publishing Company in Journal of Civil Engineering and Architecture
- Vol. 10 (1)
Railway Accident Prevention and Infrastructure Protection
- 1 January 2014
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 47 (2) , 162-169
From Goal Modeling of Real-time Control System to RT-DEVS Safety Properties Analysis
- 1 January 2014
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 47 (2) , 162-169
From Goal Modeling of Real-time Control System to RT-DEVS Safety Properties Analysis
- 30 November 2011
- Published by American Society of Civil Engineers (ASCE)
- p. 416-423
The Renovation Requirements for the VAL Manless System in Lille
The manless VAL (Automatic Light Vehicle) system was designed during the seventies, developed by Matra Transport (currently Siemens SAS IMO) and inaugurated for the first time in Lille in 1983. It is an entirely automatic system ("manless") and requires no drivers or attendants on board of the vehicles or in the stations. The vehicles are operated automatically and the whole system is supervised from a control centre. The VAL system ensures a high commercial speed at 32 km/h, allows a top speed at 80 km/h, which reduces the waiting time in stations to approximately one minute at peak hour. In Lille's metro lines, the station platforms are designed to be accommodated trains 52 m long. Currently, only 26 m long the platforms are used by single a VAL unit (two linked cars). To satisfy the passenger demands and to increase the capacity of the system, LMCU (Lille Metrople Communauté Urbaine, the owner of Lille's VAL system) launched an initial study to analyse the capacity of the system operated with single VAL units (2 vehicles, 26 meters long). This study showed that the lille's metro line 1 will be saturated in year 2015 and there is an urgent need to operate the network with vehicles 52 meters long. In 2010, the LMCU conducted the renovation plan in order to: (1) Develop a new control command subsystem. (2) Put into service a new Rolling Stock. (3) Equip all platforms station with necessary elements for operation of vehicles 52m long. (4) Increase the accessibility of PRM (Person with Reduced Mobility). (5) Deal with some obsolescence problems. This paper deals with the requirements of this important renovation in terms of operation, innovation, safety and accessibility. After a short description of the VAL system and its current operation principles, the operation and safety requirements in connection with the renovation process will be highlighted. The method used to conduct this renovation process and to guarantee at least the equivalent safety level to existing lines will be developed and explained.
- 30 November 2011
- Published by American Society of Civil Engineers (ASCE)
- p. 416-423
The Renovation Requirements for the VAL Manless System in Lille
The manless VAL (Automatic Light Vehicle) system was designed during the seventies, developed by Matra Transport (currently Siemens SAS IMO) and inaugurated for the first time in Lille in 1983. It is an entirely automatic system ("manless") and requires no drivers or attendants on board of the vehicles or in the stations. The vehicles are operated automatically and the whole system is supervised from a control centre. The VAL system ensures a high commercial speed at 32 km/h, allows a top speed at 80 km/h, which reduces the waiting time in stations to approximately one minute at peak hour. In Lille's metro lines, the station platforms are designed to be accommodated trains 52 m long. Currently, only 26 m long the platforms are used by single a VAL unit (two linked cars). To satisfy the passenger demands and to increase the capacity of the system, LMCU (Lille Metrople Communauté Urbaine, the owner of Lille's VAL system) launched an initial study to analyse the capacity of the system operated with single VAL units (2 vehicles, 26 meters long). This study showed that the lille's metro line 1 will be saturated in year 2015 and there is an urgent need to operate the network with vehicles 52 meters long. In 2010, the LMCU conducted the renovation plan in order to: (1) Develop a new control command subsystem. (2) Put into service a new Rolling Stock. (3) Equip all platforms station with necessary elements for operation of vehicles 52m long. (4) Increase the accessibility of PRM (Person with Reduced Mobility). (5) Deal with some obsolescence problems. This paper deals with the requirements of this important renovation in terms of operation, innovation, safety and accessibility. After a short description of the VAL system and its current operation principles, the operation and safety requirements in connection with the renovation process will be highlighted. The method used to conduct this renovation process and to guarantee at least the equivalent safety level to existing lines will be developed and explained.