CBCynthia A. Baumann

Cynthia A. Baumann

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Cynthia A. Baumann has a total of 1 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Utilizing Interfacing Tools for GIS, HEC-GeoHMS, HEC-GeoRAS, and ArcHydro

    by Cynthia A. Baumann, Ayman A. Halaseh

    This paper describes how the interfacing tools between the geographic information system (GIS), Hydrologic Engineering Center's Hydrologic Modeling System (HEC-HMS), Hydrologic Engineering Center's River Analysis System (HEC-RAS), and ArcHydro enabled the application of high-quality data to solve flooding problems within the town of Greenwich, Connecticut. CDM was contracted by the town to complete drainage evaluations for seven watersheds that drain into Long Island Sound, covering approximately 26,400 acres. Detailed hydrologic and hydraulic models were developed for each watershed to understand current flooding problems and identify improvements that would alleviate flooding. The project's key to success was the use of current technological advances in hydrologic and hydraulic river modeling to effectively and efficiently develop accurate models of the various watersheds. Four key aspects of the interfacing tools utilized for this project were: 1. The Geospatial Extension on the HEC-GeoHMS and HEC-GeoRAS was instrumental in the development of the models, and was used to extract watershed parameters, create river cross sections, and map simulated flooding extents. 2. ArcHydro was used to delineate watersheds and determine longest flow paths, reducing the time required to perform these tasks. 3. GIS not only facilitated model development and analysis, but it was also critical in helping local residents and municipal engineers understand existing flooding extents, as well as the potential changes in flooding extents, as a result of proposed improvements. 4. The high resolution ortho-image and digital elevation model (DEM) were utilized to precisely delineate catchments and streams, as well as locate structures and dams, and obtain necessary information to build the models. The three model development tools presented above, and the use of highly accurate data, contributed to the success of the project and increased the efficiency in model development. With the new interfacing capabilities, these tools were able to work together to better model each watershed. These tools also played a significant role in disseminating information to the public, town officials, and residents. One key aspect relative to coordinating information with the public was the generation of figures that showed the flooding limits for the 25-year storm event. This event correlated to an actual flood event that occurred in April 2007, based on statistical rainfall data. Because of this correlation, actual accounts by residents and town personnel were used to calibrate the model. Figures were generated using interfacing tools with HEC-GeoRAS and GIS to show simulated flood extents. These shape files overlaid on the GIS mapping were used to graphically represent flooding limits to residents for validation of actual flooding that they experienced during the April 2007 storm event. The interfacing tools were instrumental throughout the project and aided in the model development and analysis. Also, spatially relating and combining the GIS data and modeling results were critical in helping local residents and municipal engineers understand the causes of flooding, flooding impacts, and the potential changes in flooding extents anticipated as a result of recommended improvements.


  • Finding Flooding Solutions Using Interfacing Tools to Aid in Model Calibration and Public Collaboration

    by Cynthia A. Baumann

    This paper describes how geographic information system (GIS) tools contributed to solving flooding problems. GIS not only facilitated model development and analysis, but it was also critical in helping local residents and municipal engineers understand the causes of flooding, the relationship between land use alterations and floodplain impacts, and the potential changes in flooding extents as a result of proposed improvements. CDM was contracted by the town of Greenwich, Connecticut, to complete drainage evaluations for six watersheds that drain into Long Island Sound, covering approximately 26,000 acres. Detailed hydrologic and hydraulic models were developed for each watershed to understand current flooding problems and identify improvements that would alleviate flooding. For each watershed study, CDM participated in meetings with the Town Drainage Task Force, Flood and Erosion Control Board, community residents, and town officials, to understand community concerns and identify flooding problem areas. Based on the data collected, field investigations performed and information from residents, hydrologic and hydraulic models were developed utilizing the Hydrologic Engineering Center's Hydrologic Modeling System (HEC-HMS) and the Hydrologic Engineering Center's River Analysis System (HEC-RAS) computer programs, combined with GIS tools. The Geospatial Hydrologic Modeling Extension, HEC-GeoHMS, was used to extract watershed parameters while the Geospatial Hydraulic Modeling Extension, HEC-GeoRAS, utilized the town's GIS mapping to create river cross sections and map simulated flooding extents. ArcHydro was also used to delineate watersheds and determine longest flow paths. Calibration of the existing conditions model was based on an actual flood event in April 2007. Based on statistical rainfall data, this event correlated to a 25-year storm and was used to calibrate the model. Figures generated using HEC-GeoRAS showing simulated flood extents were presented to residents for validation of actual flooding experienced during the April 2007 storm event. CDM evaluated different alternatives and recommended improvements to alleviate flooding. These improvements were compared using capital improvements ranking criteria developed for the project to prioritize 33 stormwater improvements. The GIS tools were instrumental throughout the project. The GIS database aided in model development and analysis. Also, spatially relating and combining the GIS data and modeling results was critical in helping local residents and municipal engineers understand the causes of flooding, the relationship between land use development and floodplain impacts, and the potential changes in flooding extents anticipated as a result of recommended improvements.