AGAleksandar Ganić

Aleksandar Ganić

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Aleksandar Ganić has a total of 18 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Ground Surface Subsidence Monitoring Using Sentinel-1 in the “Kostolac” Open Pit Coal Mine

    by Zoran Gojković, Milan Kilibarda, Ljiljana Brajović, Miloš Marjanović, Aleksandar Milutinović, Aleksandar Ganić

    Open pit coal mining affects surrounding populated areas, resulting in terrain surface deformation. Surface deformation should be monitored as often as possible to control deformations and prevent potential incidents. This paper analyzes time series deformation estimated from the Sentinel-1 satellite images using the Persistent Scatterer Interferometry method to monitor subsidence rates caused by open pit mining activities. It is possible to measure deformations using classical geodetic methods, but those are rarely used in practice because they are time-consuming and expensive for application in large areas. Using the open access radar images from the Sentinel-1 mission, 513 images from the repository were downloaded between October 2016 and the end of December 2020. We present the processing steps in detail in order to establish a workflow for the automated processing of vertical displacement estimation using open source tools; a total of 402 images were processed: 215 images belonged to the ascending satellite orbit, 187 images belonged to the descending orbit, and 111 images were rejected because of adverse weather conditions. The PS InSAR technique has never been used for the mines of the Republic of Serbia or for land surveying practices related to deformation monitoring. The results based on the Sentinel-1 images were compared with results from geodetic leveling and with neotectonic uplift trends. The trend lines of vertical displacement obtained from PS and corresponding leveling are significantly similar (a Pearson correlation of 85% with a p-value of 0.015). The final evaluation reported results of vertical displacements at the leveling benchmark of −3.4 mm/year with the PS InSAR method and −2.7 mm/year with the leveling method. A comparison of the PS vertical displacements with a settlement model fits reasonably, suggesting that the measurements are valid. As four years of PS time series data is insufficient to establish undisputable conclusions on the neotectonics uplift, extending the time series (covering at least a decade) implies that this approach will become attractive in future neotectonic uplift trend estimations. This study illustrates not only the ability of Sentinel-1 data in mapping vertical deformations, but the obtained results could also be used for geohazard monitoring and land monitoring in general for the area of interest.


  • Open Access

    Gate Road Support Deformation Forecasting Based on Multivariate Singular Spectrum Analysis and Fuzzy Time Series

    by Luka Crnogorac, Rade Tokalić, Zoran Gligorić, Aleksandar Milutinović, Suzana Lutovac, Aleksandar Ganić

    Underground mining engineers and planners in our country are faced with extremely difficult working conditions and a continuous shortage of money. Production disruptions are frequent and can sometimes last more than a week. During this time, gate road support is additionally exposed to rock stress and the result is its progressive deformation and the loss of functionality of gate roads. In such an environment, it is necessary to develop a low-cost methodology to maintain a gate road support system. For this purpose, we have developed a model consisting of two main phases. The first phase is related to support deformation monitoring, while the second phase is related to data analysis. To record support deformations over a defined time horizon we use laser scanning technology together with multivariate singular spectrum analysis to conduct data processing and forecasting. Fuzzy time series is applied to classify the intensity of displacements into several independent groups (clusters).


  • Open Access

    Forecasting the building deformation using the non-equidistance Grey Model (1,1)

    by Aleksandar Milutinović, Zoran Gligorić, Zoran Gojković, Aleksandar Ganić

    The Grey Model (GM) is a powerful tool in the Grey System Theory for estimating the behavior of partially unknown systems or systems with limited information. In the Grey System Theory, GM(1,1) is the most widely used model for prediction. The applicability of this model for the purpose of buildings deformation forecasting in a vertical plane was tested on the case of the deformation forecasting of the building of Faculty of Mining and Geology in Belgrade. The non-equidistance grey model (1,1) was utilized, since the measurements on which the model was formed, were performed in various time intervals.


  • Open Access

    3D modeling of terrain and spatial visualization of underground facilities at the 'Crveni Breg' mine

    by Luka Crnogorac, Zoran Gojković, Aleksandar Milutinović, Aleksandar Ganić, Rade Tokalić

    This paper presents the process of making the 3D model of terrain, digital elevation model and orthophoto at the location of the 'Crveni Breg' mine. The necessary photos were taken with a 20-megapixel digital camera attached on the DJI Phantom 4 Pro photography UAV. AgiSoft PhotoScan was used to create the 3D model of terrain. A spatial visualization of mining facilities on the second horizon of the 'Crveni Breg' mine was carried out with the assistance of this 3D model of the underground facilities designed in the AutoDesk Civil 3D software. Two 3D models were connected to obtain complete spatial visualization of the area. The aim of this paper is to present a general overview of the possibilities that emerge by combining digital aerial photogrammetry and 3D models of underground mines, primarily in the context of protecting infrastructure, and other objects from the impact of underground mining operations as well as serving as a quick, simple, easy and relatively reliable track for potential subsidence.


  • Open Access

    Calculation method as the source of errors in connecting and orienting underground mining rooms

    by Aleksandar Ganić, Aleksandar Milutinović, Igor Miljanović, Zoran Gojković

    The task of connecting survey and orienting mine rooms is to obtain the coordinates for the first point of the future underground traverse and the bearing of the first side of the underground traverse on the horizon that is being connected. The task is particularly complex when the connection survey is performed through a single vertical shaft. The accuracy of connection survey and orientation is influenced by the errors in given and measured values, but in addition a question may be asked if the applied calculation method influence the connection precision (accuracy) and if they do to what extent. If the connection through a single vertical shaft is completed by the connection rectangle method, the calculations are most often done by using the Hansen, Weiss or Hause method. This paper presents calculations of standard deviations of unknown values in a connecting rectangle based on the three methods, as well as standard deviations of the bearing of the first side of the underground traverse on an example.

  • Open Access

    Standard deviations of coordinates due transformation between ellipsoids

    by Aleksandar Ganic, Aleksandar Milutinovic, Zoran Gojkovic

    Transformation between ellipsoids also called datum transformation implies coordinate conversion from one ellipsoid to another ellipsoid, most frequently to be done by Helmert seven-parameter transformation. Transformation parameters involve three rotation, three translation and scale factor and they can be calculated using reference points which are known before and after transformation. Transformation parameters can be obtained with appropriate measurements and in accoradance with measurement uncertainties, they are produce errors of transformed coordinates. This paper describes standard errors of transformed coordinates using Helmert seven-parameter transformation, when switching from ellipsoid WGS84 to Bessel ellipsoid.

  • Open Access

    Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of "Podbracan"

    by Aleksandar Milutinovic, Aleksandar Ganic, Thamer Rayes Diyab, Rade Tokalic, Meri Ganic

    Mining projects for mineral resource mining contain in certain cases specific technical and technological solutions, these being the result of the mine’s characteristic spatial position and the geometry of the ore deposit, existing mining works, structures, and terrain relief etc. For the purpose of completion of the mining project, it is necessary to carry out a series of mining and surveying tasks during the pre-project and project stage of mining, as well as during the construction of mining facilities and excavation of mineral resources. Specific features of the project concerning excavation of the remaining reserves of bauxite in the deposit of "Podbracan", and in this way the forthcoming mining and surveying works, are displayed by the integration of the underground mining project into the existing mine chambers, infrastructure structures on the terrain surface and into the open pit. Large number of mining and surveying works will follow the completion of this project, but in the meantime, this paper shows the a priory accuracy assessment of the spatial position of the point, it being the exit point to the existing bench of the open pit at the elevation +420m.

  • Open Access

    Apriori evaluation of the crosscut accuracy in a horizontal plane between GVH-1 and VU-1 of the RMU 'Soko' mine shaft

    by Tamara Bozinovska, Aleksandar Milutinovic, Zoran Gojkovic, Aleksandar Ganic

    The development of the crosscut from the aspect of mine surveying is a specific task, since there is no possibility for an independent control of its construction during the development. This is primarily related to the long crosscuts where the deviations of the designed direction of crosscut would have significant consequences on safety and technological activities in the mine shaft. In order to avoid errors, it is necessary to perform the preceding analysis of the crosscut accuracy, where the overall standard deviation of the crosscut is calculated. This value must be smaller than the given allowed deviation. The paper presents an a priori evaluation of the accuracy of the crosscut to be developed in the brown coal mine 'Soko' for the purpose of ventilating the opening rooms of the eastern part of the deposit.

  • Open Access

    Standard deviation of the geodetic quadrilateral point coordinates determined by the application of Hansen's method

    by Aleksandar Ganic, Aleksandar Milutinovic, Zoran Gojkovic, Radenko Mikanovic, Nebojsa Vidanovic

    The Danish astronomer Peter Andreas Hansen, who also worked on theoretical geodesy, provided an original solution for solving the geodetic quadrilateral in which the four angles and the length of one side are known. This procedure, identified in scientific literature as Hansen's problem, has been applied in geodesy but significantly more so when solving various problems related to mining measurements in underground exploitation. Nonetheless, the literature does not cover the determining of the standard deviation of the coordinates of unknown points which are established using Hansen's method. In this paper then, equations are derived to calculate the standard deviation of the coordinates determined by the above mentioned procedure.


  • Open Access

    Optimisation of underground mine decline development system using genetic algorithm

    by Zoran Gligorić, Aleksandar Ganić, Rade Tokalić, Aleksandar Milutinović

    When deposit is composed of few ore bodies it is necessary to interconnect them into one integrated system. Suppose the deposit characteristics indicate that decline development system is preferred one. In such environment we treat development of an underground mine as access infrastructure composed of different decline sections. Access infrastructure designing can be treated as spanning the spatial network which will connect all main terminals (points). In our model we defined spatial network by adequate nonlinear constrained objective function representing the cost of mine development and ore haulage. To find the minimum value of the objective function we use Genetic algorithm.