Shougang Huang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Shougang Huang has a total of 10 co-authors. Here are the top co-authors by number of shared publications:
Bin Yao
China Harbour Engineering Co., Ltd., Beijing 100027, China
1 shared publicationDekuan Zhao
School of traffic and transportation, Shijiazhuang Railway Institute, Shijiazhuang, Hebei, China, Post code 050043; and Traffic Safety and Control Lab of Hebei Province, Shijiazhuang, Hebei, China, Post code 050043
1 shared publicationHaining Liu
School of traffic and transportation, Shijiazhuang Railway Institute, Shijiazhuang, Hebei, China, Post code 050043; and Traffic Safety and Control Lab of Hebei Province, Shijiazhuang, Hebei, China, Post code 050043
1 shared publicationHuili Zhang
School of traffic and transportation, Shijiazhuang Railway Institute, Shijiazhuang, Hebei, China, Post code 050043; and Traffic Safety and Control Lab of Hebei Province, Shijiazhuang, Hebei, China, Post code 050043
1 shared publication- Jianxi Wang
School of Traffic and Transportation, Shijiazhuang Tiedao University, Shijiazhuang 050043, China
1 shared publication - Jinjie Chen
Shijiazhuang Tiedao University
1 shared publication
Latest Publications
- 5 February 2022
- Published by University of Slavonski Brod in Tehnicki vjesnik - Technical Gazette
- Vol. 29 (1) , 215-220
Simulation and Test of Lateral Ballast Resistance to 1435 mm/1000 mm Dual-Gauge Sleepers
The stability of a 1000 mm/1435 mm dual-gauge track is lower than that of a single-gauge track. One of the important factors that affects the stability of the track is the lateral resistance of the track bed. We have established a discrete element si...
- 5 February 2022
- Published by University of Slavonski Brod in Tehnicki vjesnik - Technical Gazette
- Vol. 29 (1) , 215-220
Simulation and Test of Lateral Ballast Resistance to 1435 mm/1000 mm Dual-Gauge Sleepers
The stability of a 1000 mm/1435 mm dual-gauge track is lower than that of a single-gauge track. One of the important factors that affects the stability of the track is the lateral resistance of the track bed. We have established a discrete element si...
- 22 July 2010
- Published by American Society of Civil Engineers (ASCE)
- p. 851-857
Generalized Visibility of Freeway in Adverse Weather Conditions
In adverse weather conditions, safe operation on freeways is closely related to the "driver, vehicle and road" concept. In order to ensure a safe distance between vehicles on freeways, the traditional concept of visibility should be taken into account, as well as the physical state of the driver and vehicle performance, which overcomes the limitation caused by traffic control methods which are confined by the traditional view of visibility. By putting forward a new concept of generalized visibility (GV), along with a deep analysis of its calculation and application, this paper introduces the main achievement of a freeway management department by using the generalized visibility index (GVI), a comprehensive way that takes other factors (driver, vehicle and road) into consideration. Serving as a single composite index, GVI will be an important tool for traffic management departments to make a decision easily and for making traffic control more scientific and rational.
- 22 July 2010
- Published by American Society of Civil Engineers (ASCE)
- p. 851-857
Generalized Visibility of Freeway in Adverse Weather Conditions
In adverse weather conditions, safe operation on freeways is closely related to the "driver, vehicle and road" concept. In order to ensure a safe distance between vehicles on freeways, the traditional concept of visibility should be taken into account, as well as the physical state of the driver and vehicle performance, which overcomes the limitation caused by traffic control methods which are confined by the traditional view of visibility. By putting forward a new concept of generalized visibility (GV), along with a deep analysis of its calculation and application, this paper introduces the main achievement of a freeway management department by using the generalized visibility index (GVI), a comprehensive way that takes other factors (driver, vehicle and road) into consideration. Serving as a single composite index, GVI will be an important tool for traffic management departments to make a decision easily and for making traffic control more scientific and rational.
- 22 July 2010
- Published by American Society of Civil Engineers (ASCE)
- p. 1448-1454
Track Integration Quality Index
Due to the running of high-speed trains and heavy haul trains, the track equipment is damaged more frequently, leading to a threat of running safety. Therefore, how to evaluate the quality, and improve the maintenance of track equipment is scientifically becoming an urgent issue to ensure the transport safety, reliability, and rational allocation of resources. We analyzed the shortage of track by inspection; locomotive cabs also had portable monitor meter detection installed and static checking in data processing and utilization. In the full analysis of their mutually complementary relationship we proposed the track equipment integrated quality evaluation indicator (Track Integration Quality Index) obtained by giving the three indicators, quantified three data, different weights through different grades, and characteristics track testing, then made some recommendations of its calculation method and application. Considering all the data reflecting track quality, Track Integration Quality Index is able to overcome the TQI's one-sidedness and provides an indicator of equipment quality assessment for secondary lines.
- 22 July 2010
- Published by American Society of Civil Engineers (ASCE)
- p. 1448-1454
Track Integration Quality Index
Due to the running of high-speed trains and heavy haul trains, the track equipment is damaged more frequently, leading to a threat of running safety. Therefore, how to evaluate the quality, and improve the maintenance of track equipment is scientifically becoming an urgent issue to ensure the transport safety, reliability, and rational allocation of resources. We analyzed the shortage of track by inspection; locomotive cabs also had portable monitor meter detection installed and static checking in data processing and utilization. In the full analysis of their mutually complementary relationship we proposed the track equipment integrated quality evaluation indicator (Track Integration Quality Index) obtained by giving the three indicators, quantified three data, different weights through different grades, and characteristics track testing, then made some recommendations of its calculation method and application. Considering all the data reflecting track quality, Track Integration Quality Index is able to overcome the TQI's one-sidedness and provides an indicator of equipment quality assessment for secondary lines.