Piotr Kanty
Research Subjects
Piotr Kanty has a total of 19 co-authors. Here are the top co-authors by number of shared publications:
- Sławomir Kwiecień
Faculty of Civil Engineering, Silesian University of Technology, 44-100 Gliwice, Poland
2 shared publications - Andrzej Dymarek
Faculty of Mechanical Engineering, Silesian University of Technology, 44-100 Gliwice, Poland
1 shared publication - Jakub Saloni
Menard Sp. z.o.o., 00-203 Warsaw, Poland
1 shared publication - Jarosław Rybak
Department of Civil Engineering, Wroclaw University of Environmental and Life Sciences, 50-375 Wrocław, Poland
1 shared publication - Jarosław Tokarczyk
KOMAG Institute of Mining Technology, Pszczynska 37, 44-101 Gliwice, Poland
1 shared publication - Jean Luc Chaumeny
Ing. ETP, M.S.c., Civ. Eng.; Menard DYNIV GmbH, Hittfelder Kirchweg 2, 21220 Seevetal
1 shared publication
Latest Publications
- Open Access
- 13 September 2023
- Published by MDPI AG in Applied Sciences
- Vol. 13 (18) , 10268
Uniaxial Testing of Soil–Cement Composites to Obtain Correlations to Be Used in Numerical Modeling
This paper presents the results of laboratory testing of samples obtained from soil–cement composite columns produced on a real-world test site as part of a research and development project. The introduction presents the motivation of the research and the goals that guided the layout of a research program. The general geotechnical conditions, initially assumed methodology of soil–cement composite sampling, and finally, the methodology of strength tests were presented. In tests conducted with the measurement of the strain-stress path, the strength and stiffness of the material were determined in various modes of the stress–strain path, including unloading/reloading cycles. The test results were presented in the form of graphs presenting soil–cement composite stiffness in the function of material strength and subjected to a short critical discussion against the background of reference samples from composites prepared in laboratory conditions. This allowed for their qualitative and quantitative assessment and the formulation of conclusions and guidelines, concerning the execution of works and especially the potential practical outcomes (benefits for numerical modeling), juxtaposed in the summary. Some prospects and needs for future developments were also formulated on the basis of actual experience.
- 13 September 2023
- Published by MDPI AG in Applied Sciences
- Vol. 13 (18) , 10268
Open AccessUniaxial Testing of Soil–Cement Composites to Obtain Correlations to Be Used in Numerical Modeling
This paper presents the results of laboratory testing of samples obtained from soil–cement composite columns produced on a real-world test site as part of a research and development project. The introduction presents the motivation of the research and the goals that guided the layout of a research program. The general geotechnical conditions, initially assumed methodology of soil–cement composite sampling, and finally, the methodology of strength tests were presented. In tests conducted with the measurement of the strain-stress path, the strength and stiffness of the material were determined in various modes of the stress–strain path, including unloading/reloading cycles. The test results were presented in the form of graphs presenting soil–cement composite stiffness in the function of material strength and subjected to a short critical discussion against the background of reference samples from composites prepared in laboratory conditions. This allowed for their qualitative and quantitative assessment and the formulation of conclusions and guidelines, concerning the execution of works and especially the potential practical outcomes (benefits for numerical modeling), juxtaposed in the summary. Some prospects and needs for future developments were also formulated on the basis of actual experience.
- Open Access
Virtual Prototyping of the Cement Transporter Including Strength Criterion Based on Geotechnical Boundary Conditions
Regarding the vehicles used in civil engineering, some are manufactured in large quantities and some (especially innovative ones) are still prototypes manufactured for tests or rare use. The latter describes the case of equipment for mass mixing (mass stabilization) technology which is not widely used compared to other types of geotechnical equipment. The purpose of this paper is to present a research and development project on an innovative cement transporter designed for mass mixing. Three-dimensional models and advanced finite element method (FEM) calculations are used to validate the design of the most important part of the cement transporter—the frame connecting the undercarriage and the upper carriage. The results presented in the paper confirm that the design based on the strength criterion and boundary conditions from geotechnical safety requirements can be used for designing the parts of the prototype vehicle. It is concluded that in innovative vehicle design for geotechnical purposes, the analyses may extend beyond the standard static analyses.
Open AccessVirtual Prototyping of the Cement Transporter Including Strength Criterion Based on Geotechnical Boundary Conditions
Regarding the vehicles used in civil engineering, some are manufactured in large quantities and some (especially innovative ones) are still prototypes manufactured for tests or rare use. The latter describes the case of equipment for mass mixing (mass stabilization) technology which is not widely used compared to other types of geotechnical equipment. The purpose of this paper is to present a research and development project on an innovative cement transporter designed for mass mixing. Three-dimensional models and advanced finite element method (FEM) calculations are used to validate the design of the most important part of the cement transporter—the frame connecting the undercarriage and the upper carriage. The results presented in the paper confirm that the design based on the strength criterion and boundary conditions from geotechnical safety requirements can be used for designing the parts of the prototype vehicle. It is concluded that in innovative vehicle design for geotechnical purposes, the analyses may extend beyond the standard static analyses.
- Open Access
New Hydraulic Sensor for Distributed and Automated Displacement Measurements with Temperature Compensation System
Structural health monitoring (SHM) is a challenging task, especially in the context of ground and geotechnical structures. They are characterized by a set of random mechanical parameters, depending on the location but also changing with external conditions (such as humidity or temperature) over time. Theoretical predictions and results of numerical simulations are, therefore, considerably uncertain. On the other hand, measurements aimed at improving construction and operation of such structures are very often performed only in selected points, which significantly increases the risk of data misinterpretation. Reliable measurement data related to structural condition are of the great importance because they allow for improvement of work quality but also reduce construction time and, thereby, save money. That is why scientists and engineers are still searching for new measurement solutions to overcome existing limitations. The purpose of the study is to present the design and practical application of a new hydraulic sensor dedicated to vertical displacement sensing. The novelty of the presented solution lies in several features, including the possibility of performing automatic measurements and compensating the results due to temperature effects. The article describes the sensor’s design, including the concept of a thermal compensation system and example results from laboratory tests, where the sensor’s performance was investigated in a dual-zone thermal chamber. Finally, the sensor was installed within the field conditions under an embankment constructed above the improved substrate. Example results verified by reference distributed fiber optic technique are presented and discussed hereafter, raising high prospects in the context of possible structural health monitoring applications of the new solution.
Open AccessNew Hydraulic Sensor for Distributed and Automated Displacement Measurements with Temperature Compensation System
Structural health monitoring (SHM) is a challenging task, especially in the context of ground and geotechnical structures. They are characterized by a set of random mechanical parameters, depending on the location but also changing with external conditions (such as humidity or temperature) over time. Theoretical predictions and results of numerical simulations are, therefore, considerably uncertain. On the other hand, measurements aimed at improving construction and operation of such structures are very often performed only in selected points, which significantly increases the risk of data misinterpretation. Reliable measurement data related to structural condition are of the great importance because they allow for improvement of work quality but also reduce construction time and, thereby, save money. That is why scientists and engineers are still searching for new measurement solutions to overcome existing limitations. The purpose of the study is to present the design and practical application of a new hydraulic sensor dedicated to vertical displacement sensing. The novelty of the presented solution lies in several features, including the possibility of performing automatic measurements and compensating the results due to temperature effects. The article describes the sensor’s design, including the concept of a thermal compensation system and example results from laboratory tests, where the sensor’s performance was investigated in a dual-zone thermal chamber. Finally, the sensor was installed within the field conditions under an embankment constructed above the improved substrate. Example results verified by reference distributed fiber optic technique are presented and discussed hereafter, raising high prospects in the context of possible structural health monitoring applications of the new solution.
- Open Access
- 1 October 2017
- Published by IOP Publishing in IOP Conference Series: Materials Science and Engineering
- Vol. 245 (2) , 022062
Soil Overconsolidation Changes Caused by Dynamic Replacement
In the dynamic replacement method (DR) the soil is improved by initially dropping a large weight (typically 8-20 t) pounder from a significant height up to 25 m. The created crater is filled with a stronger material (gravel, rubble, stone aggregate, debris), and the pounder is dropped once or multiple times again. The construction of dynamic replacement pillars influences the parameters of the adjacent soil. It results from the energy generated by dropping a pounder into the soil. In the current practice, these changes are not taken into the account during the design. This paper focuses on the changes of overconsolidation ratio (OCR) and in situ coefficient of lateral earth pressure (K) values estimated base on cone penetration test (CPTU) and Dilatometric test (DMT) performed at a test site. A single column was constructed and the ground around the column was examined using CPTU and DMT, performed at different distances from the column centre (2, 3, 4 and 6 m) and at different time intervals (during construction and 1, 8, 30 days later). The column was constructed in so-called transition soils (between cohesive and non-cohesive). While interpreting the results of the research, the authors addressed the matter of choosing the procedure of OCR and K indication for transition soils (in this case described as silts and/or sandy silts). Overconsolidation changes may differ depending on the chosen analysis procedure (for cohesive or non-cohesive soils). On the basis of the analysis presented in the paper and the observation of soil (acknowledged as cohesive according to macroscopic observations) during column excavation, it was decided that for more detailed analyses methods dedicated to cohesive soils should be applied. Generally, it can be stated that although the changes were complex, DR pillar formation process resulted in the increase of these parameters. The average increases of OCR and K values were 25% and 10% respectively. The post installation values are not significant from the engineering point of view, but they represent the influence of the formation process of only a single column. The described results indicate that Priebe's column dimensioning method should be applied with caution, as it assumes the value K=1 which was not obtained in the described research. The results from the conducted tests indicate that different mechanisms occur during stone column formation with vibro-replacement and dynamic replacement. As the authors did not manage to find literature describing the results of K tests in the surrounding of a DR column, the presented results should be acknowledged as significant for designers who will apply the dynamic replacement method.
- 1 October 2017
- Published by IOP Publishing in IOP Conference Series: Materials Science and Engineering
- Vol. 245 (2) , 022062
Open AccessSoil Overconsolidation Changes Caused by Dynamic Replacement
In the dynamic replacement method (DR) the soil is improved by initially dropping a large weight (typically 8-20 t) pounder from a significant height up to 25 m. The created crater is filled with a stronger material (gravel, rubble, stone aggregate, debris), and the pounder is dropped once or multiple times again. The construction of dynamic replacement pillars influences the parameters of the adjacent soil. It results from the energy generated by dropping a pounder into the soil. In the current practice, these changes are not taken into the account during the design. This paper focuses on the changes of overconsolidation ratio (OCR) and in situ coefficient of lateral earth pressure (K) values estimated base on cone penetration test (CPTU) and Dilatometric test (DMT) performed at a test site. A single column was constructed and the ground around the column was examined using CPTU and DMT, performed at different distances from the column centre (2, 3, 4 and 6 m) and at different time intervals (during construction and 1, 8, 30 days later). The column was constructed in so-called transition soils (between cohesive and non-cohesive). While interpreting the results of the research, the authors addressed the matter of choosing the procedure of OCR and K indication for transition soils (in this case described as silts and/or sandy silts). Overconsolidation changes may differ depending on the chosen analysis procedure (for cohesive or non-cohesive soils). On the basis of the analysis presented in the paper and the observation of soil (acknowledged as cohesive according to macroscopic observations) during column excavation, it was decided that for more detailed analyses methods dedicated to cohesive soils should be applied. Generally, it can be stated that although the changes were complex, DR pillar formation process resulted in the increase of these parameters. The average increases of OCR and K values were 25% and 10% respectively. The post installation values are not significant from the engineering point of view, but they represent the influence of the formation process of only a single column. The described results indicate that Priebe's column dimensioning method should be applied with caution, as it assumes the value K=1 which was not obtained in the described research. The results from the conducted tests indicate that different mechanisms occur during stone column formation with vibro-replacement and dynamic replacement. As the authors did not manage to find literature describing the results of K tests in the surrounding of a DR column, the presented results should be acknowledged as significant for designers who will apply the dynamic replacement method.
- Open Access
- 24 July 2017
- Published by Springer Nature in International Journal of Civil Engineering
- Vol. 16 (10) , 1515-1522
The Influence of Dynamic Replacement Method on the Adjacent Soil
- 24 July 2017
- Published by Springer Nature in International Journal of Civil Engineering
- Vol. 16 (10) , 1515-1522
Open AccessThe Influence of Dynamic Replacement Method on the Adjacent Soil
- Open Access
- 1 September 2015
- Published by Walter de Gruyter GmbH in Archives of Civil Engineering
- Vol. 61 (3) , 3-18
Analysis Of Dynamic Replacement Column Construction Process On Neighbouring Engineering Structures
This paper presents the analysis of the influence of works related to the dynamic replacement column formation on the bridge pillar and the highway embankment located nearby. Thanks to DR columns, it is possible to strengthen the soil under road embankment in a very efficient way. However, the construction of such support carries risk to buildings and engineering structures located in the neighbourhood. Therefore modelling and monitoring of the influence of the conducted works should be an indispensable element of each investment in which dynamic replacement method is applied. The presented issue is illustrated by the example of soil strengthening with DR columns constructed under road embankment of DTŚ highway located in Gliwice. During the inspection, the influence of vibrations on the nearby bridge pillar and road embankment was examined. The acceleration values obtained during these tests were used to verify the elaborated numerical model.
- 1 September 2015
- Published by Walter de Gruyter GmbH in Archives of Civil Engineering
- Vol. 61 (3) , 3-18
Open AccessAnalysis Of Dynamic Replacement Column Construction Process On Neighbouring Engineering Structures
This paper presents the analysis of the influence of works related to the dynamic replacement column formation on the bridge pillar and the highway embankment located nearby. Thanks to DR columns, it is possible to strengthen the soil under road embankment in a very efficient way. However, the construction of such support carries risk to buildings and engineering structures located in the neighbourhood. Therefore modelling and monitoring of the influence of the conducted works should be an indispensable element of each investment in which dynamic replacement method is applied. The presented issue is illustrated by the example of soil strengthening with DR columns constructed under road embankment of DTŚ highway located in Gliwice. During the inspection, the influence of vibrations on the nearby bridge pillar and road embankment was examined. The acceleration values obtained during these tests were used to verify the elaborated numerical model.