Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Svetlana Olbina has a total of 18 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Top Cited Papers
    Open Access

    Digital Twin (DT) and Extended Reality (XR) in the Construction Industry: A Systematic Literature Review

    by Ina Sthapit, Svetlana Olbina

    The construction industry is undergoing a rapid digital transformation, with Digital Twins (DTs) and Extended Reality (XR) as two emerging technologies with great potential. Despite their potential, there are several challenges regarding DT and XR use in construction projects, including implementation barriers, interoperability issues, system complexity, and a lack of standardized frameworks. This study presents a systematic literature review (SLR) of DT and XR technologies—including Virtual Reality (VR), Augmented Reality (AR), and Mixed Reality (MR)—in the construction industry. The study analyzes 52 peer-reviewed articles identified using the Web of Science database to explore thematic findings. Key findings highlight DT and XR applications for safety training, real-time monitoring, predictive maintenance, lifecycle management, renovation or demolition, scenario risk assessment, and education. The SLR also identifies core enabling technologies such as Building Information Modeling (BIM), Internet of Things (IoT), Big Data, and XR devices, while uncovering persistent challenges including interoperability, high implementation costs, and lack of standardization. The study highlights how integrating DTs and XR can improve construction by making it smarter, safer, and more efficient. It also suggests areas for future research to overcome current challenges and help increase the use of these technologies. The primary contribution of this study lies in deepening the understanding of DT and XR technologies by examining them through the lenses of their benefits as well as drivers for and challenges to their adoption. This enhanced understanding provides a foundation for exploring integrated DT and XR applications to advance innovation and efficiency in the construction sector.


  • Social sustainability in building retrofit projects: a systematic literature review

    by Karin Panadés, Svetlana Olbina, Emilia Rahnemay Kohlman Rabbani

    Purpose: This study analyzes social sustainability in building retrofit projects, highlighting approaches, benefits and indicators to advance sustainable practices in construction, while identifying research gaps and developing a framework of social sustainability indicators. Design/methodology/approach: A systematic literature review was performed using the PRISMA method, based on the Scopus and Engineering Village databases. The analysis covers aspects of social sustainability in building retrofit projects, types of intervention, social applications, project management, benefits, evaluation methods, research gaps and framework. Findings: The retrofits were categorized into six types: Energy, Comfort, Architectural, Structural, Historical and Global. Energy retrofits (41%) were the most frequent, while structural (4%) were less studied. Key benefits included improved community impact, worker well-being and tools like Building Information Modeling. The study identified 15 tools/indices and 107 indicators, organized into seven categories. “Occupant comfort and well-being” category had the most indicators, while “Productivity and operational efficiency” had the least. Research gaps were noted, particularly in structural and architectural interventions. A framework of social sustainability indicators for retrofit projects was proposed, with 31 key themes. Originality/value: This study presents an analysis of social sustainability in building retrofit projects, illustrating its practical applications and importance. It identifies key indicators and proposes a conceptual framework for assessment. By filling existing gaps and highlighting opportunities for future research, this study advances sustainable building practices and promotes social sustainability approaches.


  • Framework for implementing an Agile-BIM in Brazilian public organizations based on the value-focused thinking method

    by Maria Júlia Menezes-Firmino, Luciana Hazin Alencar, Svetlana Olbina

    Purpose: This research purpose was to develop a Value-Focused Thinking (VFT)-based framework for implementing an Agile-BIM in public institutions in Brazil. The framework is used for structuring an action plan for implementing the Agile-BIM. Design/methodology/approach: The methodology used to structure the Agile-BIM implementation framework is based on the VFT method, which enables a decision-maker’s strategic, fundamental and means-end objectives for the context analyzed to be more easily identified and better understood. The network developed shapes the decision context, shows possible paths toward achieving the fundamental objectives and guides the institution under study on the implementation process. Based on the networks of two decision-makers and the implementation factors identified, the Agile-BIM implementation framework is proposed. Findings: The study developed an Agile-BIM implementation framework that provides guidance for creating an Agile-BIM implementation plan in a public sector construction project and supports decision-making, in addition to clarifying the decision context for decision-makers and other actors involved. The framework consists of three main dimensions: “Project Stakeholder,” “Technology Infrastructure” and “Standardization and Procedures.” Each dimension comprises several factors that contribute to the Agile-BIM implementation process. The findings show that a structured approach to Agile-BIM implementation can support institutions in achieving a smooth and structured transition to BIM usage, thereby ensuring enhanced performance and compliance with legal requirements. Practical implications: The proposed framework can support the assessment of organizational needs and serves as a basis for guiding the implementation of Agile-BIM in public institutions. This framework for Agile-BIM implementation can guide other public institutions in formulating their action plans for implementing Agile-BIM. The framework demonstrates potential for being applicable in different contexts and being able to adapt to these. It can be transferred to other emerging and/or developing countries that are seeking to embrace Agile-BIM while considering the requisite adjustments inherent to each organization. Originality/value: The originality of this study lies in addressing the implementation of BIM in the public sector as a decision problem and using the values of the manager who is in charge in the institution to structure the Agile-BIM implementation, based on the VFT method. Furthermore, it proposes an implementation framework that integrates agile methodologies and BIM, known as Agile-BIM.


  • Open Access

    Benefits and Obstacles to the Adoption of Reality Capture Technologies in the U.S. Commercial and Infrastructure Construction Sectors

    by Jonathan W. Elliott, Svetlana Olbina

    Most previous Reality Capture Technology (RCT) research in construction focuses on the technical aspects of data collection, processing, and post-processing, while fewer studies have explored stakeholder perceptions about adopting and implementing RCT. This research investigated the perceptions of various construction project stakeholders in the commercial and infrastructure sectors regarding the benefits of, and obstacles hindering, the adoption of RCTs. A survey was distributed to the membership of U.S.-based professional organizations. Exploratory Factor Analysis was implemented to investigate and confirm logical and consistent empirical groupings of the benefits and obstacles listed in the survey. In general, mean comparisons revealed consistency across stakeholder perceptions of the benefits and obstacles of RCTs. However, significantly different perceptions about the increased accuracy of prefabricated elements, RCTs not being a company priority, lack of company budget, and data collection being too time consuming were observed between stakeholder groups. The study identified several benefits to RCT adoption (including, but not limited to, reduced project risk, increased accuracy of prefabricated elements and installed work as well as increased speed of as-built document creation) that were not noted in previous studies. Several obstacles to RCT (including, but not limited to, RCT not being a company priority, lack of Owner/Client demand, inability to bill RCT costs to the project, and cost of hiring employees with the required skills) were not observed in previous studies.


  • Using Integrated Hands-on and Virtual Reality (VR) or Augmented Reality (AR) Approaches in Construction Management Education

    by Svetlana Olbina, Scott Glick

    Traditional learning methods may not sufficiently engage students and many have studied VR and AR’s impact on student learning. Many construction management (CM) students have difficulty visualizing a building structure and understanding the materials and methods used to build it. This research investigated the use of a physical hands-on construction exercise integrated with VR and AR as a way to improve student visualization ability and learning of the course material. In this study, students built a physical model of a wood frame structure using K’NEX viewing either 2D drawings, 3D drawings, VR or AR models. Students perceived the VR, AR, and hands-on activity, as beneficial for improving their visualization of building structures. They also noted improvement in their understanding of construction materials and sequencing compared to using 2D drawings. In addition, the use of VR and AR improved student communications skills. This research is significant because it adds information on integrating hands-on and VR or AR approaches, in the same activity, to further improve CM student visualization skills and their learning of the course material. The integrated hands-on and VR/AR activity could be used by other CM programs that are interested in applying an active, learning-by-doing, approach in their curriculum.


  • Open Access

    Automated Positioning of Anchors for Personal Fall Arrest Systems for Steep-Sloped Roofs

    by Azin Heidari, Svetlana Olbina, Scott Glick

    Falls account for about one-third of all construction fatalities with most fatalities in the roofing trade. Even though a personal fall arrest system (PFAS) is required for fall protection, proper placement of PFAS anchor points is an issue evidenced by the high number of fatalities caused by incorrect anchor positioning. The research goal was to proof the concept of optimizing the location of the PFAS anchor points on steep-sloped roofs. This goal was achieved by: (1) Developing an algorithm for converting the required local jurisdiction construction regulations and standards for PFAS anchor positioning into machine-readable rules; and (2) Developing and validating an algorithm for optimizing the location of PFAS anchor points. The K-Nearest Neighbor Search (KNNS) optimization algorithm was selected in this research and was implemented into a standalone computer tool using Python programming language. The tool calculates the potential anchor locations that satisfy the fall clearance and swing hazard requirements and then displays the anchor locations both graphically and numerically. The optimization algorithm was validated using the K-fold Cross-Validation method, which proved the algorithm was adequately accurate and consistent. The research contribution is the proof of the concept that the development of an optimization algorithm and automated field-level tool for optimal selection of PFAS anchor points is possible, further research and refinement could help steep-sloped roofing companies improve their safety practices.


  • Open Access

    Contributing Project Characteristics and Realized Benefits of Successful BIM Implementation: A Comparison of Complex and Simple Buildings

    by Svetlana Olbina, Jonathan W. Elliott

    Researchers have explored Building Information Modeling (BIM) utilization on complex buildings. However, limited research has been conducted investigating BIM implementation on simple projects. This study explored the perceptions of Architects, General Contractors and Owners regarding the project characteristics that impact successful BIM implementation, and the realized benefits thereof, on complex commercial buildings versus parking garages. A survey comprised of the project characteristics and realized benefits of BIM implementation identified by Dodge Data & Analytics was distributed. Exploratory Factor Analysis was conducted to identify the empirical groupings of successful BIM implementation characteristics and realized benefits thereof. Factor means were calculated and compared using ANOVA and t-tests. Statistical comparisons revealed no significant differences by building type. For project stakeholders, a significant difference was only observed on owner’s mean perceptions of technology-related characteristics when compared to architects. Previous research indicates that Architecture, Engineering, and Construction (AEC) stakeholders believe BIM is beneficial for large and complex projects. With the exception of technology-related project characteristics, findings reveal no statistical differences for project characteristics impacting successful BIM utilization or the realized benefits of BIM implementation given building type. This finding provides empirical evidence that various stakeholder groups view BIM as a universal AEC process that provides benefits on both complex and simple projects.


  • Open Access

    BIM Use by Architecture, Engineering, and Construction (AEC) Industry in Educational Facility Projects

    by Cristina Moreno, Svetlana Olbina, Raja R. Issa

    In recent years, many public and private sector owners have started to require a building information modeling (BIM) component in new construction projects. Although there has been a significant increase in industry‐wide acceptance of BIM, it is still not a standard practice in the educational facility sector. This research aimed at exploring the use of BIM in educational facility projects by the architecture, engineering, and construction (AEC) disciplines. A survey that investigated BIM adoption at the company level, BIM implementation in projects, benefits of using BIM, and obstacles to using BIM was distributed to architects, site engineers, structural engineers, mechanical engineers, and contractors across the United States. The survey results showed that a majority of the respondents from all five disciplines used BIM. BIM was most commonly used for 3D visualization, automation of documentation, and clash detection. The most important benefits of BIM included better marketing and clearer understanding of projects which is crucial for clients such as school students, teachers, and principals. Lack of expertise and need for training seemed to be main obstacles to BIM use. The research contributes to the body of knowledge by showing prevalence of BIM use on educational facility projects and indicating how BIM could help improve collaborative knowledge sharing among designers, contractors, and clients, resulting in better quality educational buildings. These research findings can be used to assist AEC companies that are interested in implementing BIM in the educational facility projects.


  • Earthmoving Equipment Fatalities in the Construction Industry

    by Jimmie Hinze, Svetlana Olbina, Juan Orozco, Kierstin Beaumont

    Earthmoving equipment plays an important role in most construction projects. The earth must first be moved by dump trucks, dozers, and possibly scrapers. The material is then spread and compacted by motor graders and compactors. The activities of the different pieces of equipment must be coordinated to ensure a smooth operation. Unfortunately, accidents do occur, and workers are occasionally injured or killed when mishaps occur. An investigation was conducted on 15,000 fatalities that occurred due to equipment operations during a 20-year time period. Results show that many of the victims are workers who are on the ground, whether performing work related to the equipment or performing nonrelated work. Many of the accidents occurred when the equipment was traveling in reverse, a situation that is exacerbated by the blind spots on equipment. Half of the fatalities were the result of dump truck incidents.


  • Environmental Performance and Economic Analysis of Different Glazing–Sunshade Systems Using Simulation Tools

    by Adeeba A. Raheem, Raja R. A. Issa, Svetlana Olbina

    With the increasing capabilities of computer modeling and simulation technology, the analysis of options for maximizing gains in energy efficiency for buildings can be realized more efficiently and cost effectively. Conducting building performance simulations allows for the analysis of the environmental impacts of buildings and the economic vitality of green building techniques. Commercial buildings consume nearly one-fifth of all the energy used in the United States, costing more than $200 billion each year. The building envelope plays a key role in determining how much energy is required for the operation of a building. Individual thermal and solar properties of glazing and shading systems only provide information based on static evaluations, but it is very important to assess the efficiency of these systems as a whole assembly under site-specific conditions. This paper presents a case study that was conducted using computer simulation tools to evaluate the environmental and economic impacts of ...