Amr Sallam
Research Subjects
Research Interests
Amr Sallam has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Adam L. Perez
Univ. of Central Florida
1 shared publication - Boo Hyun Nam
Department of Civil Engineering, College of Engineering, Kyung Hee University, Yongin 17104, Republic of Korea
1 shared publication - K. G. Casey1 shared publication
- Manoj Chopra
Univ. of Central Florida
1 shared publication Mohamed Alrowaimi
Terracon Consultants
1 shared publication
Latest Publications
- 30 March 2017
- Published by American Society of Civil Engineers (ASCE)
- p. 508-518
Understanding Florida’s Sinkhole Hazards: Hydrogeological Laboratory Study
Sinkholes pose a hazard socially, economically and environmentally. In Florida, sinkhole-related insurance claims between 2006 and 2010 amounted to $1.4 billion. The scope of this study is to develop a sinkhole simulator (soil-groundwater physical testing) that can assess the qualitative behavior of the hydrogeological mechanism of sinkhole formation. The physical model setup incorporates an unconfined and confined aquifer system with constant head controls for each. Water level transducers are used to monitor variations in the water table during the sinkhole process. The study investigates effects of sinkhole affecting parameters such as soil type and compaction level. Scenarios involving adjustments in soil type and compaction are employed to collect data on water table drawdown and erosion characteristics, as well as the type of sinkhole formation, either cover-collapse or cover-subsidence. A strong relationship between soil compaction, cohesion and the type of sinkhole formed was observed.
- 30 March 2017
- Published by American Society of Civil Engineers (ASCE)
- p. 508-518
Understanding Florida’s Sinkhole Hazards: Hydrogeological Laboratory Study
Sinkholes pose a hazard socially, economically and environmentally. In Florida, sinkhole-related insurance claims between 2006 and 2010 amounted to $1.4 billion. The scope of this study is to develop a sinkhole simulator (soil-groundwater physical testing) that can assess the qualitative behavior of the hydrogeological mechanism of sinkhole formation. The physical model setup incorporates an unconfined and confined aquifer system with constant head controls for each. Water level transducers are used to monitor variations in the water table during the sinkhole process. The study investigates effects of sinkhole affecting parameters such as soil type and compaction level. Scenarios involving adjustments in soil type and compaction are employed to collect data on water table drawdown and erosion characteristics, as well as the type of sinkhole formation, either cover-collapse or cover-subsidence. A strong relationship between soil compaction, cohesion and the type of sinkhole formed was observed.
- 8 February 2016
- Published by American Society of Civil Engineers (ASCE)
- p. 1793-1804
Case History: Iterative Foundation Design for a New Women’s Hospital in Orlando, Central Florida
The new Florida Hospital for Women is located on the main campus and will provide a new era of high tech care for the women of Central Florida. The twelve story building includes a full basement and is situated on a tight urban site. A cast in place reinforced concrete flat plate structural framing system was selected. Column loads varied from 1800 to 3900 kips. The geotechnical field explorations included SPT borings and CPT soundings to about 100 feet deep. The subsoil consisted of medium dense sand followed by medium stiff clays and silty to clayey sands underlain by the Hawthorne Group soils. Iterative foundation design process was developed and executed between the structural and geotechnical engineers to design the most economical foundation system to support the building. Settlement analysis was performed utilizing numerical modeling to provide accurate subgrade reaction modulus. A soil mat foundation was selected which offered better stress distribution and minimized differential settlement; however total estimated settlements were in the order of 3 inches. The design team along with the owner agreed to take the risk of approving the building total and differential settlement and account for it in the final design. Few columns were instrumented and monitored for settlement throughout the construction process. Recorded settlements were in the order of 50% of the estimated settlements. This paper summarizes the structural components, the geotechnical aspects, foundation design, and construction challenges of the project.
- 8 February 2016
- Published by American Society of Civil Engineers (ASCE)
- p. 1793-1804
Case History: Iterative Foundation Design for a New Women’s Hospital in Orlando, Central Florida
The new Florida Hospital for Women is located on the main campus and will provide a new era of high tech care for the women of Central Florida. The twelve story building includes a full basement and is situated on a tight urban site. A cast in place reinforced concrete flat plate structural framing system was selected. Column loads varied from 1800 to 3900 kips. The geotechnical field explorations included SPT borings and CPT soundings to about 100 feet deep. The subsoil consisted of medium dense sand followed by medium stiff clays and silty to clayey sands underlain by the Hawthorne Group soils. Iterative foundation design process was developed and executed between the structural and geotechnical engineers to design the most economical foundation system to support the building. Settlement analysis was performed utilizing numerical modeling to provide accurate subgrade reaction modulus. A soil mat foundation was selected which offered better stress distribution and minimized differential settlement; however total estimated settlements were in the order of 3 inches. The design team along with the owner agreed to take the risk of approving the building total and differential settlement and account for it in the final design. Few columns were instrumented and monitored for settlement throughout the construction process. Recorded settlements were in the order of 50% of the estimated settlements. This paper summarizes the structural components, the geotechnical aspects, foundation design, and construction challenges of the project.