Hiam Khoury
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Hiam Khoury has a total of 10 co-authors. Here are the top co-authors by number of shared publications:
- Mohamed-Asem Uthman Abdul-Malak
American Univ. of Beirut
4 shared publications - Mohammad Barakat
American Univ. of Beirut
4 shared publications Bahaa Eddine Mneymneh
Ph.D. Candidate, Dept. of Civil and Environmental Engineering, Maroun Semaan Faculty of Engineering and Architecture, American Univ. of Beirut, P.O. Box 11-0236, Riad El Solh, Beirut 1107 2020, Lebanon
2 shared publicationsEmile Zankoul
Graduate Student, Dept. of Civil and Environmental Engineering, American Univ. of Beirut, P.O. Box 11-0236, Riad El Solh, Beirut 1107 2020, Lebanon
2 shared publications- Farook Hamzeh
University of Alberta
1 shared publication Jean-Pierre Sleiman
American Univ. of Beirut
1 shared publication
Latest Publications
- 1 March 2019
- Published by American Society of Civil Engineers (ASCE) in Journal of Computing in Civil Engineering
- Vol. 33 (2)
Vision-Based Framework for Intelligent Monitoring of Hardhat Wearing on Construction Sites
The construction industry is still considered among the riskiest industries in the world because workers are continuously exposed to injury from falls, slips, or trips or being struck by falling objects. Hence, safety programs have been according great emphasis on enforcing proper use of personal protective equipment (PPE) by deploying safety officers on construction sites. However, the current practice of supervising large construction areas is still manual, tedious, and ineffective. Therefore, this study aims at creating an integrated framework that can automatically and efficiently detect any noncompliance with safety rules and regulations, in particular a failure to wear a hardhat, using computer vision techniques applied on videos captured from construction sites. This is mainly achieved by (1) isolating mobile workers or construction personnel from the captured scene by means of a novel motion detection algorithm and a human classifier and (2) detecting the hardhat in the identified region of interest using an object detection tool coupled with a color-based image classification one. Several experiments were conducted and results highlighted that the proposed framework proved accurate, fast, and robust under different conditions and identified hardhats with high precision and recall. More specifically, the newly developed motion detection algorithm showed an improved accuracy compared to common background subtraction methods; the human classifier performed well and was able to identify several human postures, unlike support vector machine classifiers; and the hardhat detection algorithm achieved high precision and recall simultaneously.
- 1 March 2019
- Published by American Society of Civil Engineers (ASCE) in Journal of Computing in Civil Engineering
- Vol. 33 (2)
Vision-Based Framework for Intelligent Monitoring of Hardhat Wearing on Construction Sites
The construction industry is still considered among the riskiest industries in the world because workers are continuously exposed to injury from falls, slips, or trips or being struck by falling objects. Hence, safety programs have been according great emphasis on enforcing proper use of personal protective equipment (PPE) by deploying safety officers on construction sites. However, the current practice of supervising large construction areas is still manual, tedious, and ineffective. Therefore, this study aims at creating an integrated framework that can automatically and efficiently detect any noncompliance with safety rules and regulations, in particular a failure to wear a hardhat, using computer vision techniques applied on videos captured from construction sites. This is mainly achieved by (1) isolating mobile workers or construction personnel from the captured scene by means of a novel motion detection algorithm and a human classifier and (2) detecting the hardhat in the identified region of interest using an object detection tool coupled with a color-based image classification one. Several experiments were conducted and results highlighted that the proposed framework proved accurate, fast, and robust under different conditions and identified hardhats with high precision and recall. More specifically, the newly developed motion detection algorithm showed an improved accuracy compared to common background subtraction methods; the human classifier performed well and was able to identify several human postures, unlike support vector machine classifiers; and the hardhat detection algorithm achieved high precision and recall simultaneously.
- 1 August 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
- Vol. 10 (3)
Particularized Analysis of AIA’s Expeditious Mechanisms for Administering Claims and Disputes
Contract conditions governing the administration of construction claims and disputes play a critical role concerning the efficiency and speed with which their resolutions can be concluded. Available standard conditions offer a variety of timeline spectrums along which the resolution of such claims and disputes can be pursued. A detailed analysis of the relevant stipulations offered by the latest standard conditions recently issued by the American Institute of Architects (AIA) is presented, with the goal of addressing their particular merits and the corresponding performance requirements expected of contract administration professionals acting on behalf of the parties to the construction contract. The methodology involved highlighting the properties that are conducive to expeditious administration of claims and disputes and pinpointing those other characteristics that may provide room for claims and disputes to undesirably drag beyond what is inherently implied by these conditions. Multiple findings are summarized along with numerous examined timeline aspects, including the significance of issuing an initial decision, the ability of triggering resolution closures, and the ability of enforcing settlements reached within mediation. Particularized timeline scenarios are constructed, along with a flow diagram embedding all possible claim/dispute tracking paths that are likely to evolve, which can be of crucial guidance to concerned practicing contract administrators.
- 1 August 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
- Vol. 10 (3)
Particularized Analysis of AIA’s Expeditious Mechanisms for Administering Claims and Disputes
Contract conditions governing the administration of construction claims and disputes play a critical role concerning the efficiency and speed with which their resolutions can be concluded. Available standard conditions offer a variety of timeline spectrums along which the resolution of such claims and disputes can be pursued. A detailed analysis of the relevant stipulations offered by the latest standard conditions recently issued by the American Institute of Architects (AIA) is presented, with the goal of addressing their particular merits and the corresponding performance requirements expected of contract administration professionals acting on behalf of the parties to the construction contract. The methodology involved highlighting the properties that are conducive to expeditious administration of claims and disputes and pinpointing those other characteristics that may provide room for claims and disputes to undesirably drag beyond what is inherently implied by these conditions. Multiple findings are summarized along with numerous examined timeline aspects, including the significance of issuing an initial decision, the ability of triggering resolution closures, and the ability of enforcing settlements reached within mediation. Particularized timeline scenarios are constructed, along with a flow diagram embedding all possible claim/dispute tracking paths that are likely to evolve, which can be of crucial guidance to concerned practicing contract administrators.
- 1 August 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
- Vol. 10 (3)
Progression Analysis of the EJCDC’s Underlying Claim and Dispute Resolution Mechanism
Direct negotiation is the most common approach used for cost-effective resolution of construction claims and disputes. From among the several available standard conditions of contract, those issued by the Engineers Joint Contract Documents Committee (EJCDC) call for a direct review and resolution process to be initiated immediately following the submission of a claim and supporting data by the claimant. To this effect, this paper tackles the examination of the claim process evolution under these conditions, starting with this rather long, time-barred stipulation. The used methodology relied on presenting the overall claim and dispute timeline then dissecting it in accordance with the possibilities prevailing at each of the timeline stages and their corresponding gates. Four different scenarios were identified, and their analysis revealed interesting observations along a number of characteristics. These mainly include: (1) the placement of the project owner at the forefront in deciding on actions pertaining to a contractor’s submitted claims; (2) the staging of mediation as an alternative dispute resolution means early on in the timeline as an intermittent step that can possibly be taken in lieu of, and having the effect of suspending, the direct negotiation step; and (3) the advantage given to the action by the opposing party, on one hand, and to the denial of claim by the claimant, on the other hand, in triggering expeditious closure of or in moving forward with a case on hand, respectively.
- 1 August 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
- Vol. 10 (3)
Progression Analysis of the EJCDC’s Underlying Claim and Dispute Resolution Mechanism
Direct negotiation is the most common approach used for cost-effective resolution of construction claims and disputes. From among the several available standard conditions of contract, those issued by the Engineers Joint Contract Documents Committee (EJCDC) call for a direct review and resolution process to be initiated immediately following the submission of a claim and supporting data by the claimant. To this effect, this paper tackles the examination of the claim process evolution under these conditions, starting with this rather long, time-barred stipulation. The used methodology relied on presenting the overall claim and dispute timeline then dissecting it in accordance with the possibilities prevailing at each of the timeline stages and their corresponding gates. Four different scenarios were identified, and their analysis revealed interesting observations along a number of characteristics. These mainly include: (1) the placement of the project owner at the forefront in deciding on actions pertaining to a contractor’s submitted claims; (2) the staging of mediation as an alternative dispute resolution means early on in the timeline as an intermittent step that can possibly be taken in lieu of, and having the effect of suspending, the direct negotiation step; and (3) the advantage given to the action by the opposing party, on one hand, and to the denial of claim by the claimant, on the other hand, in triggering expeditious closure of or in moving forward with a case on hand, respectively.
- 29 March 2018
- Published by American Society of Civil Engineers (ASCE)
- p. 217-226
Financial Accounting Treatment of Differing Site Conditions Claims: A Contractor’s Perspective
The high competition in the construction market entails contractors quoting reasonable, if not trimmed, prices when bidding on construction projects in order to be awarded the contract. This pricing strategy quite limits the successful contractor’s ability to absorb future additional costs, as these cannot be included in the periodic payment applications made by the contractor. This can be explained by considering the case of unforeseeable physical conditions, as a highly occurring example, whereby the contractor incurs unanticipated additional costs and, as a result, submits a claim. In order for a claim to be properly substantiated, contemporary records typically form a critical part of the evidence to be utilized in evaluating the contractual entitlement. Among various such records, the financial statements, maintaining the increased costs incurred, can play a considerable role in supporting the contractor’s contractual right to an equitable adjustment. However, due to a lengthy inquiry and negotiation conducted by, or on behalf of, the owner, the contractor is unlikely to recover the claim proceeds in the same—or even the following—fiscal year, and it is thereby encouraged to financially treat this unresolved claim during the current accounting period to preserve its position in the market among lenders and investors. Therefore, this paper takes the initial steps for addressing such inevitable situations, by: (1) examining the differing site conditions clause under two sets of standard contract conditions published by the International Federation of Consulting Engineers (FIDIC) and the Engineers Joint Contract Documents Committee (EJCDC), (2) extracting the corresponding claim process stages, and (3) analyzing the various scenarios that a contractor is likely to face under both standard contract systems and accordingly illustrating how unresolved claims can be best accounted for in the contracting company’s financial sheets, in a way that leads to a positive impact on the periodic income.
- 29 March 2018
- Published by American Society of Civil Engineers (ASCE)
- p. 217-226
Financial Accounting Treatment of Differing Site Conditions Claims: A Contractor’s Perspective
The high competition in the construction market entails contractors quoting reasonable, if not trimmed, prices when bidding on construction projects in order to be awarded the contract. This pricing strategy quite limits the successful contractor’s ability to absorb future additional costs, as these cannot be included in the periodic payment applications made by the contractor. This can be explained by considering the case of unforeseeable physical conditions, as a highly occurring example, whereby the contractor incurs unanticipated additional costs and, as a result, submits a claim. In order for a claim to be properly substantiated, contemporary records typically form a critical part of the evidence to be utilized in evaluating the contractual entitlement. Among various such records, the financial statements, maintaining the increased costs incurred, can play a considerable role in supporting the contractor’s contractual right to an equitable adjustment. However, due to a lengthy inquiry and negotiation conducted by, or on behalf of, the owner, the contractor is unlikely to recover the claim proceeds in the same—or even the following—fiscal year, and it is thereby encouraged to financially treat this unresolved claim during the current accounting period to preserve its position in the market among lenders and investors. Therefore, this paper takes the initial steps for addressing such inevitable situations, by: (1) examining the differing site conditions clause under two sets of standard contract conditions published by the International Federation of Consulting Engineers (FIDIC) and the Engineers Joint Contract Documents Committee (EJCDC), (2) extracting the corresponding claim process stages, and (3) analyzing the various scenarios that a contractor is likely to face under both standard contract systems and accordingly illustrating how unresolved claims can be best accounted for in the contracting company’s financial sheets, in a way that leads to a positive impact on the periodic income.
- 29 March 2018
- Published by American Society of Civil Engineers (ASCE)
- p. 165-174
Examination of Judgements Rendered by Engineering Professionals under Various Construction Claims/Disputes Resolution Roles
Claims and disputes contract clauses are meant to specify and regulate the mechanisms adopted for tracking, expediting, and resolving claims and disputes that arise under construction contracts. As such they inexorably lead to engaging all main project participants in an inevitably demanding process, and over a rather long period of time. Inherent to such processes is therefore the engagement of an array of engineering professionals, in respect of rendering judgements such as opinions, findings, determinations, dispute review recommendations, adjudication decisions, pre-arbitral decisions, or arbitral rulings. This paper examines the roles engineering professionals are required to exercise under four standard sets of contract conditions, widely used in North America and internationally. Namely, the examined conditions are those published by the International Federation of Consulting Engineers (FIDIC), the Engineers Joint Contract Documents Committee (EJCDC), and the American Institute of Architects (AIA), and the widely endorsed ConsensusDocs conditions. Stipulated roles are found to have variant properties and associated attributes related to whether given judgements: (1) are said to be binding, or binding and final, upon their mere issuance, or (2) are born binding and turn final upon the action or the lack thereof by any of the concerned parties, or (3) are of such a property that allows the attribute of being “final” to be revoked. Similarly, other investigated properties dealt with the degrees of independency and impartiality under which the concerned engineering professionals end up acting. Finally, the paper critically argues for other considerations and criteria to have to prevail for any rendered judgement to be viewed as fair and reasonable.
- 29 March 2018
- Published by American Society of Civil Engineers (ASCE)
- p. 165-174
Examination of Judgements Rendered by Engineering Professionals under Various Construction Claims/Disputes Resolution Roles
Claims and disputes contract clauses are meant to specify and regulate the mechanisms adopted for tracking, expediting, and resolving claims and disputes that arise under construction contracts. As such they inexorably lead to engaging all main project participants in an inevitably demanding process, and over a rather long period of time. Inherent to such processes is therefore the engagement of an array of engineering professionals, in respect of rendering judgements such as opinions, findings, determinations, dispute review recommendations, adjudication decisions, pre-arbitral decisions, or arbitral rulings. This paper examines the roles engineering professionals are required to exercise under four standard sets of contract conditions, widely used in North America and internationally. Namely, the examined conditions are those published by the International Federation of Consulting Engineers (FIDIC), the Engineers Joint Contract Documents Committee (EJCDC), and the American Institute of Architects (AIA), and the widely endorsed ConsensusDocs conditions. Stipulated roles are found to have variant properties and associated attributes related to whether given judgements: (1) are said to be binding, or binding and final, upon their mere issuance, or (2) are born binding and turn final upon the action or the lack thereof by any of the concerned parties, or (3) are of such a property that allows the attribute of being “final” to be revoked. Similarly, other investigated properties dealt with the degrees of independency and impartiality under which the concerned engineering professionals end up acting. Finally, the paper critically argues for other considerations and criteria to have to prevail for any rendered judgement to be viewed as fair and reasonable.
- 1 January 2018
- Published by China Engineering Science Press Co. Ltd. in Frontiers of Engineering Management
- Vol. 5 (2) , 227-239
Evaluation of computer vision techniques for automated hardhat detection in indoor construction safety applications
- 1 January 2018
- Published by China Engineering Science Press Co. Ltd. in Frontiers of Engineering Management
- Vol. 5 (2) , 227-239
Evaluation of computer vision techniques for automated hardhat detection in indoor construction safety applications
- 1 November 2016
- Published by American Society of Civil Engineers (ASCE) in Journal of Computing in Civil Engineering
- Vol. 30 (6)
Modeling, Animating, and Optimizing On-Shore Wind Farm Construction Operations
Recently, wind energy has been greatly sought after because of the high price and diminishing quantity of fossil fuel resources. This necessitated the construction of wind farms. However, the on-shore wind farm construction process can be a very complicated task primarily because of the challenging location and topography of the remote rural sites where they are typically constructed. This paper takes the initial steps and presents work targeted at efficiently designing and planning the construction process of on-shore wind farms. For this purpose, a generic discrete event simulation (DES) model, illustrating the different construction stages from topographical surveying to wind tower assembly and erection and incorporating general resources data, was created. The developed model’s applicability was then tested for a specific site in Marjeyoun, Lebanon, where no wind farm has been constructed, and was verified and validated by animating all processes within a five-dimensional (5D) environment depi...
- 1 November 2016
- Published by American Society of Civil Engineers (ASCE) in Journal of Computing in Civil Engineering
- Vol. 30 (6)
Modeling, Animating, and Optimizing On-Shore Wind Farm Construction Operations
Recently, wind energy has been greatly sought after because of the high price and diminishing quantity of fossil fuel resources. This necessitated the construction of wind farms. However, the on-shore wind farm construction process can be a very complicated task primarily because of the challenging location and topography of the remote rural sites where they are typically constructed. This paper takes the initial steps and presents work targeted at efficiently designing and planning the construction process of on-shore wind farms. For this purpose, a generic discrete event simulation (DES) model, illustrating the different construction stages from topographical surveying to wind tower assembly and erection and incorporating general resources data, was created. The developed model’s applicability was then tested for a specific site in Marjeyoun, Lebanon, where no wind farm has been constructed, and was verified and validated by animating all processes within a five-dimensional (5D) environment depi...
- 1 June 2016
- Published by SAGE Publications in SIMULATION
- Vol. 92 (6) , 579-594
A simulator-based approach for modeling longitudinal driving behavior in construction work zones: Exploration and assessment
The essential need to maintain roadway structures makes encountering work zones an inevitable part of today’s driving. The corresponding changes in traffic dynamics directly affect the drivers’ mobility and safety. Accordingly, a closer look into driver’s interaction with work zones’ geometrics and activity features may be helpful. The overall objective of this study is to examine the longitudinal characteristics of driver behavior in different work zone conditions. Based on existing literature, the variables defining these work zone conditions were specified as the work zone length, the barrier type and the level of activity. Eight different scenarios were designed by changing these three variables in a driving simulator and 40 trajectory data sets were recorded. Using a genetic algorithm, these data sets were used to calibrate a prospect theory-based acceleration model. The calibrated parameter values helped quantify the driver’s perception of the surrounding environment, his/her risk-attitudes and the corresponding judgment process.
- 1 June 2016
- Published by SAGE Publications in SIMULATION
- Vol. 92 (6) , 579-594
A simulator-based approach for modeling longitudinal driving behavior in construction work zones: Exploration and assessment
The essential need to maintain roadway structures makes encountering work zones an inevitable part of today’s driving. The corresponding changes in traffic dynamics directly affect the drivers’ mobility and safety. Accordingly, a closer look into driver’s interaction with work zones’ geometrics and activity features may be helpful. The overall objective of this study is to examine the longitudinal characteristics of driver behavior in different work zone conditions. Based on existing literature, the variables defining these work zone conditions were specified as the work zone length, the barrier type and the level of activity. Eight different scenarios were designed by changing these three variables in a driving simulator and 40 trajectory data sets were recorded. Using a genetic algorithm, these data sets were used to calibrate a prospect theory-based acceleration model. The calibrated parameter values helped quantify the driver’s perception of the surrounding environment, his/her risk-attitudes and the corresponding judgment process.
- 24 May 2016
- Published by American Society of Civil Engineers (ASCE)
- p. 2624-2632
Sensor-Based Planning Tool for Tower Crane Anti-Collision Monitoring on Construction Sites
Construction sites are always prone to delays and accidents especially when tower cranes are involved. This situation exacerbates when more than one crane is used and the possibility of collisions occurring in the overlapping work zones becomes high. As such, early planning of joint tower crane operations prior to job execution helps prevent delays and bottlenecks in project schedule and enhance site safety. This in turn incurs less operational construction costs. However, clashes are hard to quantify and assess during the planning stage. Building on recent advances in construction planning, site management, simulation, and sensing, this paper aims at developing an automated planning tool for monitoring tower crane anti-collision on construction sites. The purpose behind this research is three-fold: (1) studying optimal sensors’ type and location on different parts of the cranes, (2) acquiring hypothetical comprehensive data from sensors, and (3) integrating collected data into a 4D schedule to avoid crane clashes and reduce operations’ duration. A case example is presented and preliminary results highlight the potential of planning, sensing and simulation techniques in optimizing joint crane operation while avoiding collisions.
- 24 May 2016
- Published by American Society of Civil Engineers (ASCE)
- p. 2624-2632
Sensor-Based Planning Tool for Tower Crane Anti-Collision Monitoring on Construction Sites
Construction sites are always prone to delays and accidents especially when tower cranes are involved. This situation exacerbates when more than one crane is used and the possibility of collisions occurring in the overlapping work zones becomes high. As such, early planning of joint tower crane operations prior to job execution helps prevent delays and bottlenecks in project schedule and enhance site safety. This in turn incurs less operational construction costs. However, clashes are hard to quantify and assess during the planning stage. Building on recent advances in construction planning, site management, simulation, and sensing, this paper aims at developing an automated planning tool for monitoring tower crane anti-collision on construction sites. The purpose behind this research is three-fold: (1) studying optimal sensors’ type and location on different parts of the cranes, (2) acquiring hypothetical comprehensive data from sensors, and (3) integrating collected data into a 4D schedule to avoid crane clashes and reduce operations’ duration. A case example is presented and preliminary results highlight the potential of planning, sensing and simulation techniques in optimizing joint crane operation while avoiding collisions.