RRRoman Rischke

Roman Rischke

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Roman Rischke has a total of 8 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Scheduling Maintenance Jobs in Networks

    by Fidaa Abed, Lin Chen, Yann Disser, Martin Groß, Nicole Megow, Julie Meißner, Alexander T. Richter, Roman Rischke

    We investigate the problem of scheduling the maintenance of edges in a network, motivated by the goal of minimizing outages in transportation or telecommunication networks. We focus on maintaining connectivity between two nodes over time; for the special case of path networks, this is related to the problem of minimizing the busy time of machines. We show that the problem can be solved in polynomial time in arbitrary networks if preemption is allowed. If preemption is restricted to integral time points, the problem is NP-hard and in the non-preemptive case we give strong non-approximability results. Furthermore, we give tight bounds on the power of preemption, that is, the maximum ratio of the values of non-preemptive and preemptive optimal solutions. Interestingly, the preemptive and the non-preemptive problem can be solved efficiently on paths, whereas we show that mixing both leads to a weakly NP-hard problem that allows for a simple 2-approximation.

  • Open Access

    Complexity of interval minmax regret scheduling on parallel identical machines with total completion time criterion

    by Maciej Drwal, Roman Rischke

    In this paper, we consider the problem of scheduling jobs on parallel identical machines, where the processing times of jobs are uncertain: only interval bounds of processing times are known. The optimality criterion of a schedule is the total completion time. In order to cope with the uncertainty, we consider the maximum regret objective and we seek a schedule that performs well under all possible instantiations of processing times. Although the deterministic version of the considered problem is solvable in polynomial time, the minmax regret version is known to be weakly NP-hard even for a single machine, and strongly NP-hard for parallel unrelated machines. In this paper, we show that the problem is strongly NP-hard also in the case of parallel identical machines.