Tao Guan
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Tao Guan has a total of 8 co-authors. Here are the top co-authors by number of shared publications:
- Denghua Zhong
State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin, China
2 shared publications Bingyu Ren
Tianjin University
1 shared publication- Bingyu Ren
State Key Laboratory of Hydraulic Engineering Intelligent Construction and Operation, Tianjin University, Tianjin, China
1 shared publication - Binping Wu
State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin 300350, China
1 shared publication - Bo Cui
State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin 300072, China
1 shared publication Denghua Zhong
Tianjin University
1 shared publication
Latest Publications
- 15 January 2018
- Published by Springer Nature in Transactions of Tianjin University
- Vol. 24 (3) , 282-289
Real-Time Spreading Thickness Monitoring of High-core Rockfill Dam Based on K-nearest Neighbor Algorithm
- 15 January 2018
- Published by Springer Nature in Transactions of Tianjin University
- Vol. 24 (3) , 282-289
Real-Time Spreading Thickness Monitoring of High-core Rockfill Dam Based on K-nearest Neighbor Algorithm
- 14 March 2017
- Published by Springer Nature in Transactions of Tianjin University
- Vol. 23 (3) , 267-276
Real-Time Update of Sequence Placement Logic for High Arch Dams Based on Evidence Weight Discount
- 14 March 2017
- Published by Springer Nature in Transactions of Tianjin University
- Vol. 23 (3) , 267-276
Real-Time Update of Sequence Placement Logic for High Arch Dams Based on Evidence Weight Discount
- Open Access
- 1 January 2015
- Published by American Institute of Mathematical Sciences (AIMS) in Journal of Industrial and Management Optimization
- Vol. 11 (4) , 1321-1342
Construction schedule optimization for high arch dams based on real-time interactive simulation
The construction process of high arch dams is extremely complicated. Therefore, optimization of the construction schedule is essential for construction management to save a large amount of time and investment costs. Construction simulation is an important tool for the construction schedule optimization of high arch dams. Most current studies involving construction schedule simulations do not concurrently consider real-time construction situations and site managers' requirements. In this paper, the real-time interactive simulation is proposed that could solve this problem. The real-time construction process is the initial condition of the simulation, and the actual construction parameters are the basis of the simulation parameters. Additionally, site managers can change the simulation strategy dynamically or enter requirements based on real-time construction situations. For a simulation result, different schemes are optimized with the entropy weight method. With this method, the construction simulation can track the rapid changes in construction situations and provide a reasonable construction schedule, which increases the flexibility of the construction simulation. The optimized construction scheme could be an effective guide for site construction. With a 4D (three dimensional model and time) CAD model, the simulation process can be well expressed. A case study shows that the construction schedule can be established in real time, and it's a useful tool for decision-making.
- 1 January 2015
- Published by American Institute of Mathematical Sciences (AIMS) in Journal of Industrial and Management Optimization
- Vol. 11 (4) , 1321-1342
Open AccessConstruction schedule optimization for high arch dams based on real-time interactive simulation
The construction process of high arch dams is extremely complicated. Therefore, optimization of the construction schedule is essential for construction management to save a large amount of time and investment costs. Construction simulation is an important tool for the construction schedule optimization of high arch dams. Most current studies involving construction schedule simulations do not concurrently consider real-time construction situations and site managers' requirements. In this paper, the real-time interactive simulation is proposed that could solve this problem. The real-time construction process is the initial condition of the simulation, and the actual construction parameters are the basis of the simulation parameters. Additionally, site managers can change the simulation strategy dynamically or enter requirements based on real-time construction situations. For a simulation result, different schemes are optimized with the entropy weight method. With this method, the construction simulation can track the rapid changes in construction situations and provide a reasonable construction schedule, which increases the flexibility of the construction simulation. The optimized construction scheme could be an effective guide for site construction. With a 4D (three dimensional model and time) CAD model, the simulation process can be well expressed. A case study shows that the construction schedule can be established in real time, and it's a useful tool for decision-making.