Edisson Salazar
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Edisson Salazar has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Darwin Aldas
Universitat Politècnica de València
1 shared publication - Evelyn Armendáriz
Universidad Técnica de Ambato
1 shared publication - John Reyes
Universidad Técnica de Ambato
1 shared publication - José Núñez
Universidad Técnica de Cotopaxi
1 shared publication - Kevin Alvarez
Universidad Técnica de Ambato
1 shared publication - Mario Daniel Garcia
Universidad Técnica de Ambato
1 shared publication
Latest Publications
- Open Access
- 29 June 2017
- Published by IOP Publishing in IOP Conference Series: Materials Science and Engineering
- Vol. 212 (1) , 012020
Finite Progressive Planning for the Assembly Process in Footwear
The scheduling of the operations of a manufacturing system is recognized for its efficiency in establishing a characteristic rate of production based on the forecasting of the ending date of an order. However, progressive planning focused on the footwear industries has not been studied in detail, since it is limited by the use of machines and supply according to the demand of the production line, whose development is based on just in time. The study proposes a finite progressive planning model in the area of footwear assembly that begins with analysis of the demand and identification of manufacturing constraints in order to establish an optimal ordering sequence. The results show manufacturing requirements through production orders that automatically determine production shifts per order, through experimentation of scenarios, the 25% increase in productivity indicators and a 31% improvement in efficiency are established. This improvement represents higher benefits for the industrial sector when establishing planning in the workplace.
- 29 June 2017
- Published by IOP Publishing in IOP Conference Series: Materials Science and Engineering
- Vol. 212 (1) , 012020
Open AccessFinite Progressive Planning for the Assembly Process in Footwear
The scheduling of the operations of a manufacturing system is recognized for its efficiency in establishing a characteristic rate of production based on the forecasting of the ending date of an order. However, progressive planning focused on the footwear industries has not been studied in detail, since it is limited by the use of machines and supply according to the demand of the production line, whose development is based on just in time. The study proposes a finite progressive planning model in the area of footwear assembly that begins with analysis of the demand and identification of manufacturing constraints in order to establish an optimal ordering sequence. The results show manufacturing requirements through production orders that automatically determine production shifts per order, through experimentation of scenarios, the 25% increase in productivity indicators and a 31% improvement in efficiency are established. This improvement represents higher benefits for the industrial sector when establishing planning in the workplace.