Francesco Livio Rossini
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Francesco Livio Rossini has a total of 12 co-authors. Here are the top co-authors by number of shared publications:
- Antonio Fioravanti
Sapienza, University of Rome
5 shared publications Gabriele Novembri
5 shared publications- Gabriele Novembri
Sapienza University of Rome
3 shared publications Antonio Fioravanti
Sapienza University of Rome
2 shared publicationsArmando Trento
Sapienza University of Rome
2 shared publications- Edoardo De Santis
DICEA Department, Sapienza University of Rome
2 shared publications
Latest Publications
- Open Access
A Continuous Scan-to-HBIM Workflow Based on Integrated Multisensor Acquisition and Real-Time Semantic Modelling
The increasing adoption of Building Information Modeling (BIM) in the AECO sector has highlighted persistent limitations in Scan-to-HBIM workflows, particularly related to fragmentation, manual processing, and lack of continuity between data acquisition and modeling. This study proposes and validates a continuous Scan-to-HBIM workflow based on integrated multisensor acquisition and real-time semantic modeling, aiming to reduce these discontinuities and improve data consistency. The method is implemented through an all-in-one platform combining mobile LiDAR, photogrammetry, sensor fusion (IMU–SLAM), machine learning for semantic segmentation, and extended reality (XR) for in-field validation, enabling the direct generation of parametric BIM elements during acquisition. The approach is tested on the ex Mulino Gallisai, a complex and degraded heritage building, using a controlled benchmarking protocol against a traditional pipeline. Results show high metric reliability (MAE = 1.68 cm), semantic recognition accuracy of 88.2%, and a Manual Correction Ratio of 11.8%, indicating reduced human intervention. The integrated workflow also achieves a 29% reduction in total processing time while improving spatial continuity and topological coherence. These findings demonstrate that a continuous, integrated Scan-to-HBIM paradigm is technically feasible and can shift modeling from a post-process reconstruction to a real-time generative process, supporting more efficient and reliable digital representations and contributing to the development of Digital Twin-oriented workflows.
Open AccessA Continuous Scan-to-HBIM Workflow Based on Integrated Multisensor Acquisition and Real-Time Semantic Modelling
The increasing adoption of Building Information Modeling (BIM) in the AECO sector has highlighted persistent limitations in Scan-to-HBIM workflows, particularly related to fragmentation, manual processing, and lack of continuity between data acquisition and modeling. This study proposes and validates a continuous Scan-to-HBIM workflow based on integrated multisensor acquisition and real-time semantic modeling, aiming to reduce these discontinuities and improve data consistency. The method is implemented through an all-in-one platform combining mobile LiDAR, photogrammetry, sensor fusion (IMU–SLAM), machine learning for semantic segmentation, and extended reality (XR) for in-field validation, enabling the direct generation of parametric BIM elements during acquisition. The approach is tested on the ex Mulino Gallisai, a complex and degraded heritage building, using a controlled benchmarking protocol against a traditional pipeline. Results show high metric reliability (MAE = 1.68 cm), semantic recognition accuracy of 88.2%, and a Manual Correction Ratio of 11.8%, indicating reduced human intervention. The integrated workflow also achieves a 29% reduction in total processing time while improving spatial continuity and topological coherence. These findings demonstrate that a continuous, integrated Scan-to-HBIM paradigm is technically feasible and can shift modeling from a post-process reconstruction to a real-time generative process, supporting more efficient and reliable digital representations and contributing to the development of Digital Twin-oriented workflows.
- Open Access
- 8 May 2026
- Published by MDPI AG in Applied Sciences
- Vol. 16 (10) , 4642
An Open Standard Methodology for BIM-CMMS Integration: Enhancing Facility Operations Through IFC-Based Data Enrichment
Despite the operational phase being the most cost-intensive in a building’s lifecycle, Facility Management (FM) resource optimization continues to face challenges due to fragmented and low-structured data. Building Information Modeling (BIM) offers a centralized data environment, but interoperability gaps persist between design-oriented BIM models and operational Computerized Maintenance Management Systems (CMMSs). This paper presents a scalable, standards-based methodology for BIM-CMMS integration based on the extension of Industry Foundation Classes (IFCs) and the enrichment of FM data. The proposed Python-based application leverages the open-source IfcOpenShell library to inject custom, FM-specific Property Sets (Psets), including asset condition, criticality, and maintenance schedules, directly into IFC entities. The approach transforms standard IFC files into data-rich Asset Information Models (AIMs) without relying on proprietary middleware. The methodology was validated through two residential building case studies. IFC models were successfully checked through the buildingSMART validation service, providing full interoperability across multiple IFC-compatible platforms. Integration with OpenMAINT automatically generates a complete asset database, minimizing manual data entry and reducing inconsistencies. The results confirm the feasibility of a repeatable open-standard workflow. The future development is the definition of a functional/cognitive DT, with the scope of improving the lifecycle BIM model quality and enhancing the efficiency of facility operations.
- 8 May 2026
- Published by MDPI AG in Applied Sciences
- Vol. 16 (10) , 4642
Open AccessAn Open Standard Methodology for BIM-CMMS Integration: Enhancing Facility Operations Through IFC-Based Data Enrichment
Despite the operational phase being the most cost-intensive in a building’s lifecycle, Facility Management (FM) resource optimization continues to face challenges due to fragmented and low-structured data. Building Information Modeling (BIM) offers a centralized data environment, but interoperability gaps persist between design-oriented BIM models and operational Computerized Maintenance Management Systems (CMMSs). This paper presents a scalable, standards-based methodology for BIM-CMMS integration based on the extension of Industry Foundation Classes (IFCs) and the enrichment of FM data. The proposed Python-based application leverages the open-source IfcOpenShell library to inject custom, FM-specific Property Sets (Psets), including asset condition, criticality, and maintenance schedules, directly into IFC entities. The approach transforms standard IFC files into data-rich Asset Information Models (AIMs) without relying on proprietary middleware. The methodology was validated through two residential building case studies. IFC models were successfully checked through the buildingSMART validation service, providing full interoperability across multiple IFC-compatible platforms. Integration with OpenMAINT automatically generates a complete asset database, minimizing manual data entry and reducing inconsistencies. The results confirm the feasibility of a repeatable open-standard workflow. The future development is the definition of a functional/cognitive DT, with the scope of improving the lifecycle BIM model quality and enhancing the efficiency of facility operations.
- Open Access
- 30 October 2025
- Published by Vilnius Gediminas Technical University in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
- Vol. 31 (8) , 881-892
Optimising scheduled maintenance on operational buildings: a microservice-based BIM framework
Operation and Maintenance (O&M) aims to preserve the quality of the building throughout its life, keeping maintenance costs within acceptable limits. Maintenance involves different tasks, from replacing air conditioning filters to restoring structural elements. Each task has an optimal frequency, which can be flexible within a specific time range, a cost, and a duration. These maintenance activities may disrupt building operations by repeatedly interrupting ongoing activities. This research seeks to reduce these disruptions by grouping tasks within reasonably close time frames to schedule preventive maintenance plans while respecting their frequency. We propose an optimisation model, solvable using a general-purpose solver, which identifies the best time range for grouping O&M tasks. By penalising deviations from the optimal period, the model ensures that tasks are performed at the most cost-effective time. Integrated within a microservice-based architecture, the optimisation engine seamlessly links an input database and a BIM model, orchestrated using Dynamo for Revit. A case study illustrates the effectiveness of this system, consolidating multiple tasks into optimised work clusters and significantly reducing operational disruptions. The originality of this work lies in its innovative combination of optimisation techniques and BIM tools, providing a practical and scalable solution for efficient O&M management.
- 30 October 2025
- Published by Vilnius Gediminas Technical University in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
- Vol. 31 (8) , 881-892
Open AccessOptimising scheduled maintenance on operational buildings: a microservice-based BIM framework
Operation and Maintenance (O&M) aims to preserve the quality of the building throughout its life, keeping maintenance costs within acceptable limits. Maintenance involves different tasks, from replacing air conditioning filters to restoring structural elements. Each task has an optimal frequency, which can be flexible within a specific time range, a cost, and a duration. These maintenance activities may disrupt building operations by repeatedly interrupting ongoing activities. This research seeks to reduce these disruptions by grouping tasks within reasonably close time frames to schedule preventive maintenance plans while respecting their frequency. We propose an optimisation model, solvable using a general-purpose solver, which identifies the best time range for grouping O&M tasks. By penalising deviations from the optimal period, the model ensures that tasks are performed at the most cost-effective time. Integrated within a microservice-based architecture, the optimisation engine seamlessly links an input database and a BIM model, orchestrated using Dynamo for Revit. A case study illustrates the effectiveness of this system, consolidating multiple tasks into optimised work clusters and significantly reducing operational disruptions. The originality of this work lies in its innovative combination of optimisation techniques and BIM tools, providing a practical and scalable solution for efficient O&M management.
- 3 June 2025
- Published by Springer Nature
- p. 213-222
Enhancing BIM with Bayes Point Machine from Early Design Phases for HVAC Maintenance-Oriented Design
- 3 June 2025
- Published by Springer Nature
- p. 213-222
Enhancing BIM with Bayes Point Machine from Early Design Phases for HVAC Maintenance-Oriented Design
- Open Access
- 26 September 2023
- Published by Firenze University Press in Rivista Tema
- Vol. 09 (02)
Construction Productivity Graph: a comprehensive methodology based on BIM and AI techniques to enhance productivity and safety on construction sites
The construction sector is characterised by distinctive issues, such as product uniqueness, the reluctance to introduce innovation, player fragmentation leading to a low productivity level and a related high level of risk intended due to the increased likelihood of damages and injuries, and the consequences on construction productivity. The common European Union regulatory framework provides strict regulations about on-site working activities, but there is still no standard for the environmental and social sustainability of construction sites. Productivity assumes a crucial role in reducing the environmental impact of construction and positively influences workers’ safety due to higher levels of organisation, reducing time, costs, resource consumption and wasted time. This paper presents a methodology developed by augmenting BIM systems capabilities using Agent-based simulation techniques to simulate and optimise on-site work. The augmented BIM model allows analysis of site conditions in terms of space utilisation and resource allocation, resulting in the ‘Construction Productivity Graph – CPG’. This graphic representation synthesises the results obtained, making it possible to visualise the work progression in different working areas with the resources employed, allowing for the management of productivity rates and the verification of work safety conditions.
- 26 September 2023
- Published by Firenze University Press in Rivista Tema
- Vol. 09 (02)
Open AccessConstruction Productivity Graph: a comprehensive methodology based on BIM and AI techniques to enhance productivity and safety on construction sites
The construction sector is characterised by distinctive issues, such as product uniqueness, the reluctance to introduce innovation, player fragmentation leading to a low productivity level and a related high level of risk intended due to the increased likelihood of damages and injuries, and the consequences on construction productivity. The common European Union regulatory framework provides strict regulations about on-site working activities, but there is still no standard for the environmental and social sustainability of construction sites. Productivity assumes a crucial role in reducing the environmental impact of construction and positively influences workers’ safety due to higher levels of organisation, reducing time, costs, resource consumption and wasted time. This paper presents a methodology developed by augmenting BIM systems capabilities using Agent-based simulation techniques to simulate and optimise on-site work. The augmented BIM model allows analysis of site conditions in terms of space utilisation and resource allocation, resulting in the ‘Construction Productivity Graph – CPG’. This graphic representation synthesises the results obtained, making it possible to visualise the work progression in different working areas with the resources employed, allowing for the management of productivity rates and the verification of work safety conditions.
- 26 June 2023
- Published by IGLC
- p. 186-196
Construction Productivity Graph: A Structured Framework to Enhance Productivity and Safety on Construction Sites
- 26 June 2023
- Published by IGLC
- p. 186-196
Construction Productivity Graph: A Structured Framework to Enhance Productivity and Safety on Construction Sites
- 30 April 2023
- Published by Springer Nature
- p. 251-259
Improving Sustainability of Building Operation and Maintenance (O&M) Process Through Ontologies: An Introductory Framework
- 30 April 2023
- Published by Springer Nature
- p. 251-259
Improving Sustainability of Building Operation and Maintenance (O&M) Process Through Ontologies: An Introductory Framework
- 8 March 2023
- Published by Taylor & Francis
- p. 141-146
A simulative framework to evaluate constructability through parameter optimization at early design stage
Construction process is becoming progressively more complex in terms of time and cost because of the increasing number of parameters to satisfy, whilst persist a lack of collaboration among design and construction actors. Construction phases strategies rarely influence choices made in design phase, and they considered consequently 4D and 5D analysis outcomes and not objectives of the whole design process. So, the aim of the research is to develop a methodology capable of providing designers a real time simulation of optimised construction solution. To reach this result, a combined algorithm of structural solution, construction difficulties and performance is developed. This collaborative procedure can check in real time the feasibility of the design solution in structural and constructional terms. So, a framework of the Visual Programming linking among the different tools involved is presented, and finally an experiment on a real construction site is briefly analysed. The future works will improve the autonomy of the system by changing the input data collected by user with those elaborated from experiences through a machine learning approach.
- 8 March 2023
- Published by Taylor & Francis
- p. 141-146
A simulative framework to evaluate constructability through parameter optimization at early design stage
Construction process is becoming progressively more complex in terms of time and cost because of the increasing number of parameters to satisfy, whilst persist a lack of collaboration among design and construction actors. Construction phases strategies rarely influence choices made in design phase, and they considered consequently 4D and 5D analysis outcomes and not objectives of the whole design process. So, the aim of the research is to develop a methodology capable of providing designers a real time simulation of optimised construction solution. To reach this result, a combined algorithm of structural solution, construction difficulties and performance is developed. This collaborative procedure can check in real time the feasibility of the design solution in structural and constructional terms. So, a framework of the Visual Programming linking among the different tools involved is presented, and finally an experiment on a real construction site is briefly analysed. The future works will improve the autonomy of the system by changing the input data collected by user with those elaborated from experiences through a machine learning approach.
- 15 September 2020
- Published by Springer Nature
- p. 11-13
Introduction to Proactive Design. Toward the Implementation of BIM Methodology for Managing Complexity in Architectural Projects
- 15 September 2020
- Published by Springer Nature
- p. 11-13
Introduction to Proactive Design. Toward the Implementation of BIM Methodology for Managing Complexity in Architectural Projects
- Open Access
- 10 August 2020
- Published by International Council for Research and Innovation in Building and Construction in Journal of Information Technology in Construction
- Vol. 25 (23) , 398-415
Swarm modelling framework to improve design support systems capabilities
The disruptive development of ICT technologies can be a decisive element in bringing the productivity of the construction sector closer to the highest performing ones, such as automotive. We base the proposed research on the improvement of existing tools with artificial intelligence techniques, with the goal of having a self-adaptive model regarding the objectives to achieve. So, we present a general framework based on the Swarm Simulation Modelling approach. Building objects, goals, constraints and design solutions will be represented as a Multi-Agents System able to communicate, interact and integrate over the existing BIM systems, ensuring a reactive and proactive behaviour. Finally, the model presents many interconnected intelligent agents, linked to building object. They can sense external ‘perturbations’ and react by re-organising their structure to satisfy imposed constraints. We can find the near optimal solution via the DCOP approach, autonomously.
- 10 August 2020
- Published by International Council for Research and Innovation in Building and Construction in Journal of Information Technology in Construction
- Vol. 25 (23) , 398-415
Open AccessSwarm modelling framework to improve design support systems capabilities
The disruptive development of ICT technologies can be a decisive element in bringing the productivity of the construction sector closer to the highest performing ones, such as automotive. We base the proposed research on the improvement of existing tools with artificial intelligence techniques, with the goal of having a self-adaptive model regarding the objectives to achieve. So, we present a general framework based on the Swarm Simulation Modelling approach. Building objects, goals, constraints and design solutions will be represented as a Multi-Agents System able to communicate, interact and integrate over the existing BIM systems, ensuring a reactive and proactive behaviour. Finally, the model presents many interconnected intelligent agents, linked to building object. They can sense external ‘perturbations’ and react by re-organising their structure to satisfy imposed constraints. We can find the near optimal solution via the DCOP approach, autonomously.