KVKaspar Vereide

Kaspar Vereide

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Kaspar Vereide has a total of 7 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Hydraulic Scale Modeling of Pressurized Sediment Laden Flow

    by Kalekirstos G. Gebrelibanos, Kaspar Vereide, Sirak A. Weldemariam, Asli Bor, Asfafaw H. Tesfay, Leif Lia

    In hydropower tunnel systems, unlined pressurized tunnels in competent rock are commonly used for cost-effective construction. Incorporating pressurized sand traps at the downstream end of these tunnels can increase plant capacity and improve energy efficiency. The present work focuses on optimizing the performance of existing pressurized sand traps. Hydraulic scale models were developed and tested at the Hydraulic Laboratory of NTNU, Within the 960 MW Tonstad Hydropower Plant in southern Norway as a case study. This study compares 1:1 velocity/sediment scaling with Froude scaling through physical experiments, analyzing velocity profiles via Particle Image Velocimetry (PIV) and sediment trap efficiency. Results show that Froude scaling, combined with geometric sediment scaling, provides superior accuracy in trap efficiency scaling across varying factors. However, in many practical hydropower applications, the large scaling factor required for laboratory models results in very small model sediments, leading to cohesion limitations. In such cases, Froude scaling may not be feasible. The 1:1 scaling method provides a conservative alternative. Hence, for practical applications, 1:1 scaling may be more cost-effective and sufficient for designing pressurized sand traps. This study emphasizes the importance of accounting for unscaled parameters and flow phenomena in hydraulic model design.


  • Upgrading of a Norwegian pressurized sand trap combined with an open air surge tank

    by Wolfgang Richter, Kaspar Vereide, Gerald Zenz

    In 1988 the Tonstad power plant (Norway) was upgraded from 640 to 960 MW. The headrace system to the reservoirs was not upgraded except for an additional pressure shaft, surge tank and an additional sand trap. Even with about 50 % higher discharge in the main tunnel, the sand traps worked adequately after the commissioning. However, in recent years, higher flexibility of demand is challenging the power plant and has resulted in events with flushing of sediments to the turbines. Higher flexibility demands also challenge the current surge tank design. During one event, free surface flow is believed to have occurred in the sand trap since severe damage to two of the turbines was observed. This contribution presents the background of the power system situation at the Tonstad power plant and the current flexibility demands of the power market and its challenges for the hydraulic system, as well as the proposals to solve the sand trap issues and the oscillation demands for the surge tank. The paper discusses the possibility of utilizing a model predictive controller with real‐time flow simulations to solve the challenges without structural reconstruction, and possible options should structural reconstruction be necessary. The contribution compares analysed options for improving the efficiency of sand traps. Finally, an outlook is offered to future demands for flexibility in hydropower plants with increasing supply of renewable power sources.