Yuanyuan Zhang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Yuanyuan Zhang has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Bin Han
China Electric Power Research Institute, Beijing, China
1 shared publication - Liangeng Ban
China Electric Power Research Institute, Beijing China
1 shared publication - Ruihua Song
China Electric Power Research Institute, 467400 Beijing, Beijing China
1 shared publication - Xiaohui Qin
China Electric Power Research Institute, Beijing, China
1 shared publication - Yi Wang
Institute of Traction Power Supply, School of Electrical Engineering, Beijing Jiaotong University, Beijing 100044, China
1 shared publication - Zutao Xiang
State Key Laboratory of Power Grid Safety China Electric Power Research Institute) 100192 Beijing China
1 shared publication
Latest Publications
- 13 October 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Delivery
- Vol. 33 (3) , 1369-1377
Mechanism and Mitigation of Power Fluctuation Overvoltage for Ultrahigh Voltage Half-Wave Length Transmission System
A new type of overvoltage phenomenon in half-wave length transmission line (HWLL) is caused by power fluctuation (PF). This paper defines this phenomenon as power fluctuation overvoltage (PFO), which belongs to the temporary overvoltage category. The amplitude of PFO is generally high, the duration time is long, and the coverage on HWLLs is wide in the case of single-phase transient fault, when the transmission power is large. This will pose a new problem for Ultra high voltage (UHV) half-wave length AC transmission (HWACT). First, we analyze the unique transmission characteristics of HWLLs with incident and reflected wave theory. Next, according to the application scenario of HWACT in China, we construct a plant-to-grid UHV half-wave length transmission system. Then, based on a large number of electromagnetic transient simulations on the system using EMTP, we obtain the PF characteristics of the UHV HWLL. Furthermore, the mechanism and characteristics of PFO are described by the characteristics of transmission and PF. Finally, we propose the mitigation measures of PFO for UHV HWLL, which include configuring metal oxide arresters differentially along HWLLs, closing high-speed grounding switches during the fault period, generator tripping after a fault, and shortening the reclosing time.
- 13 October 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Delivery
- Vol. 33 (3) , 1369-1377
Mechanism and Mitigation of Power Fluctuation Overvoltage for Ultrahigh Voltage Half-Wave Length Transmission System
A new type of overvoltage phenomenon in half-wave length transmission line (HWLL) is caused by power fluctuation (PF). This paper defines this phenomenon as power fluctuation overvoltage (PFO), which belongs to the temporary overvoltage category. The amplitude of PFO is generally high, the duration time is long, and the coverage on HWLLs is wide in the case of single-phase transient fault, when the transmission power is large. This will pose a new problem for Ultra high voltage (UHV) half-wave length AC transmission (HWACT). First, we analyze the unique transmission characteristics of HWLLs with incident and reflected wave theory. Next, according to the application scenario of HWACT in China, we construct a plant-to-grid UHV half-wave length transmission system. Then, based on a large number of electromagnetic transient simulations on the system using EMTP, we obtain the PF characteristics of the UHV HWLL. Furthermore, the mechanism and characteristics of PFO are described by the characteristics of transmission and PF. Finally, we propose the mitigation measures of PFO for UHV HWLL, which include configuring metal oxide arresters differentially along HWLLs, closing high-speed grounding switches during the fault period, generator tripping after a fault, and shortening the reclosing time.