Natasa Prascevic
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Natasa Prascevic has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Ivan Milojković
Institut za vodoprivredu Jaroslav Černi: Belgrade, Belgrade, RS
3 shared publications Zivojin Prascevic
University of Belgrade
2 shared publications- Abel Duran
Univ Belgrade, Fac Civil Engn, King Alexander Blvd 73, Belgrade 11000, Serbia
1 shared publication - Branislav Bajat
Faculty of Civil Engineering, University of Belgrade, Belgrade, Serbia
1 shared publication - Marija Petronijević
Faculty of Civil Engineering, University of Belgrade, Bulevar kralja Aleksandra 73, 11000 Belgrade, Serbia
1 shared publication - Nenad Višnjevac
Faculty of Civil Engineering, University of Belgrade, Bulevar kralja Aleksandra 73, 11000 Belgrade, Serbia
1 shared publication
Latest Publications
- Open Access
- 14 June 2024
- Published by IWA Publishing in Water Science & Technology
- Vol. 90 (2) , 578-597
Project management using the developed AHP–VIKOR method with the fuzzy approach
There are many factors to consider when designing a sewerage pumping station (SPS), such as sizing the system, pump type, cooperation between pumps, SPS elevation, wastewater discharge location, system venting, correct number of inflows into the pumping station (PS) reservoir, and chemical resistance of the installations. In this study, we developed a multi-criteria-decision-making (MCDM) fuzzy AHP–VIKOR method with the aim to contribute to the improvement and development of MCDM methods. By combining and improving the existing AHP and VIKOR methods with the application of fuzzy logic theory, a novel fuzzy AHP–VIKOR method is for easier and clearer obtaining of optimal solutions. The new method was applied to obtain the findings in the analysis of four complex design solutions for canalisation, treatment, and pumping of atmospheric wastewater in the SPS in Makiš, an urban neighbourhood of Belgrade in Serbia. The analysis was carried out in relation to the stability of the solution by way of considering the use of different methods of MCDM optimisation, while taking into account ways of channelling, treatment, and evacuation of wastewater.
- 14 June 2024
- Published by IWA Publishing in Water Science & Technology
- Vol. 90 (2) , 578-597
Open AccessProject management using the developed AHP–VIKOR method with the fuzzy approach
There are many factors to consider when designing a sewerage pumping station (SPS), such as sizing the system, pump type, cooperation between pumps, SPS elevation, wastewater discharge location, system venting, correct number of inflows into the pumping station (PS) reservoir, and chemical resistance of the installations. In this study, we developed a multi-criteria-decision-making (MCDM) fuzzy AHP–VIKOR method with the aim to contribute to the improvement and development of MCDM methods. By combining and improving the existing AHP and VIKOR methods with the application of fuzzy logic theory, a novel fuzzy AHP–VIKOR method is for easier and clearer obtaining of optimal solutions. The new method was applied to obtain the findings in the analysis of four complex design solutions for canalisation, treatment, and pumping of atmospheric wastewater in the SPS in Makiš, an urban neighbourhood of Belgrade in Serbia. The analysis was carried out in relation to the stability of the solution by way of considering the use of different methods of MCDM optimisation, while taking into account ways of channelling, treatment, and evacuation of wastewater.
- Open Access
- 1 January 2024
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- No. Upravljanj,p. 353-360
Application of the AHP-VIKOR method with a phase approach in the design of atmospheric sewerage facilities
Sewerage, purification and pumping of atmospheric wastewater was designed in the Makiš Sewage Pumping Station (PS). The selection of the optimal solution in relation to construction was carried out using the method of multi-criteria optimization with consideration of different ways of channeling, treatment and evacuation of wastewater. Different ways of designing and building buildings were considered. The combined AHP-VIKOR method with Fuzzy approach was used. Various variant solutions for the construction of the sewer atmospheric PS "Makiš" were analyzed.
- 1 January 2024
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- No. Upravljanj,p. 353-360
Open AccessApplication of the AHP-VIKOR method with a phase approach in the design of atmospheric sewerage facilities
Sewerage, purification and pumping of atmospheric wastewater was designed in the Makiš Sewage Pumping Station (PS). The selection of the optimal solution in relation to construction was carried out using the method of multi-criteria optimization with consideration of different ways of channeling, treatment and evacuation of wastewater. Different ways of designing and building buildings were considered. The combined AHP-VIKOR method with Fuzzy approach was used. Various variant solutions for the construction of the sewer atmospheric PS "Makiš" were analyzed.
- 1 January 2024
- Published by University Library in Kragujevac
- p. 297-304
CHOICE OF THE OPTIMUM TECHNOLOGY FOR THE CONSTRUCTION OF SEWAGE PUMPING STATION MAKISH USING THE AHP-VIKOR METHOD WITH A FUZZY APPROACH
Project solutions for sewage treatment, purification and pumping of atmospheric wastewater in Sewage Pumping Station (PS) Makiš were analyzed. The analysis was carried out in relation to the construction considering the use of the multi-criteria optimization method with the consideration of different ways of channeling, treatment, and evacuation of wastewater. Many criteria were analyzed according to which different variant solutions for the construction of the Makiš sewage treatment plant were evaluated. Different ways of designing and building buildings were considered. AHP, VIKOR and Fuzzy approach methods were used
- 1 January 2024
- Published by University Library in Kragujevac
- p. 297-304
CHOICE OF THE OPTIMUM TECHNOLOGY FOR THE CONSTRUCTION OF SEWAGE PUMPING STATION MAKISH USING THE AHP-VIKOR METHOD WITH A FUZZY APPROACH
Project solutions for sewage treatment, purification and pumping of atmospheric wastewater in Sewage Pumping Station (PS) Makiš were analyzed. The analysis was carried out in relation to the construction considering the use of the multi-criteria optimization method with the consideration of different ways of channeling, treatment, and evacuation of wastewater. Many criteria were analyzed according to which different variant solutions for the construction of the Makiš sewage treatment plant were evaluated. Different ways of designing and building buildings were considered. AHP, VIKOR and Fuzzy approach methods were used
- 17 August 2023
- Published by Springer Nature
- p. 319-326
Application of Fuzzy AHP Method for Selection of Equipment for Concrete Works
- 17 August 2023
- Published by Springer Nature
- p. 319-326
Application of Fuzzy AHP Method for Selection of Equipment for Concrete Works
- Open Access
- 5 May 2021
- Published by MDPI AG in ISPRS International Journal of Geo-Information
- Vol. 10 (5) , 297
The Extension of IFC For Supporting 3D Cadastre LADM Geometry
The growth of densely populated urban areas has caused traditional cadastral registration systems to face many difficulties in representing complex and multilevel property situations on 2D maps. These challenges, combined with the rapid development of 3D technologies, have forced the research and progress of 3D cadastre systems. The aim of this study is to investigate how a Building Information Model (BIM) can be used as a data source for the Land Administration Domain Model (LADM) based 3D cadastre system, and how that process can be improved. The Industry Foundation Classes (IFC) format and the LADM-based model were selected because both are international open standards that have a significant impact in their own domain. The data sample for the 3D cadastre system was extracted from a BIM model. The paper proposes an IFC format extension which makes it possible to define 3D geometry according to the LADM standard. In order to demonstrate this extension, the West 65 residential and business complex, Belgrade, was selected as a case study. The IFC format extension presented here is a step towards data harmonization between BIM in the IFC format and 3D cadastre systems; it should provide more suitable data in the current IFC schema and enable easy data flow between BIM projects and 3D cadastral data.
- 5 May 2021
- Published by MDPI AG in ISPRS International Journal of Geo-Information
- Vol. 10 (5) , 297
Open AccessThe Extension of IFC For Supporting 3D Cadastre LADM Geometry
The growth of densely populated urban areas has caused traditional cadastral registration systems to face many difficulties in representing complex and multilevel property situations on 2D maps. These challenges, combined with the rapid development of 3D technologies, have forced the research and progress of 3D cadastre systems. The aim of this study is to investigate how a Building Information Model (BIM) can be used as a data source for the Land Administration Domain Model (LADM) based 3D cadastre system, and how that process can be improved. The Industry Foundation Classes (IFC) format and the LADM-based model were selected because both are international open standards that have a significant impact in their own domain. The data sample for the 3D cadastre system was extracted from a BIM model. The paper proposes an IFC format extension which makes it possible to define 3D geometry according to the LADM standard. In order to demonstrate this extension, the West 65 residential and business complex, Belgrade, was selected as a case study. The IFC format extension presented here is a step towards data harmonization between BIM in the IFC format and 3D cadastre systems; it should provide more suitable data in the current IFC schema and enable easy data flow between BIM projects and 3D cadastral data.
- Open Access
- 1 January 2021
- Published by Centre for Evaluation in Education and Science (CEON/CEES) in Građevinski materijali i konstrukcije
- Vol. 64 (3) , 195-199
Allocation and selection of equipment for concrete works using fuzzy linear programming
The aim of this research is focused on the problem of allocation and selection of the construction equipment when construction firms bid for construction projects. The main objective of the selection of construction equipment is to ensure the timely completion of all considered projects, while at the same time the planned budget is fulfilled. In this paper fuzzy linear programming is applied with the fuzzy objective function and fuzzy constrains. The proposed mathematical model is applied for optimal selection and allocation of equipment for five projects with different quantities of concrete works and general budget.
- 1 January 2021
- Published by Centre for Evaluation in Education and Science (CEON/CEES) in Građevinski materijali i konstrukcije
- Vol. 64 (3) , 195-199
Open AccessAllocation and selection of equipment for concrete works using fuzzy linear programming
The aim of this research is focused on the problem of allocation and selection of the construction equipment when construction firms bid for construction projects. The main objective of the selection of construction equipment is to ensure the timely completion of all considered projects, while at the same time the planned budget is fulfilled. In this paper fuzzy linear programming is applied with the fuzzy objective function and fuzzy constrains. The proposed mathematical model is applied for optimal selection and allocation of equipment for five projects with different quantities of concrete works and general budget.
- Open Access
- 20 November 2017
- Published by Vilnius Gediminas Technical University in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
- Vol. 23 (8) , 1123-1135
APPLICATION OF FUZZY AHP FOR RANKING AND SELECTION OF ALTERNATIVES IN CONSTRUCTION PROJECT MANAGEMENT
The construction project management (CPM) is very important and large segment of entire project management (PM). Realisation of construction projects is usually long term process which requests significant financial, material, human and other resources to fulfil contracted obligations and achieve a good quality of works. Therefore, making good decisions with the satisfaction of various criteria is one of the main conditions to achieve planed business objectives and finish the project in contracted time with good quality. This paper proposes a new procedure for determination of the weights of criteria and alternatives in the Fuzzy analytic hierarchy process (FAHP) with trapezoidal fuzzy number using a new method for finding eigenvelues and eigenvectors of the criteria and alternatives, which is based on expected values of the fuzzy numbers and their products. Local and global fuzzy weights of the alternatives are determined using linear programming. In the paper a formula for ranking fuzzy numbers by reduced generalized fuzzy mean is also proposed, since ranking by the coefficient of variation is not always reliable. In the presented case study, applying proposed method, from imprecise input data are obtained enough accurate and useful results for rational ranking of alternatives related to the project realization.
- 20 November 2017
- Published by Vilnius Gediminas Technical University in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
- Vol. 23 (8) , 1123-1135
Open AccessAPPLICATION OF FUZZY AHP FOR RANKING AND SELECTION OF ALTERNATIVES IN CONSTRUCTION PROJECT MANAGEMENT
The construction project management (CPM) is very important and large segment of entire project management (PM). Realisation of construction projects is usually long term process which requests significant financial, material, human and other resources to fulfil contracted obligations and achieve a good quality of works. Therefore, making good decisions with the satisfaction of various criteria is one of the main conditions to achieve planed business objectives and finish the project in contracted time with good quality. This paper proposes a new procedure for determination of the weights of criteria and alternatives in the Fuzzy analytic hierarchy process (FAHP) with trapezoidal fuzzy number using a new method for finding eigenvelues and eigenvectors of the criteria and alternatives, which is based on expected values of the fuzzy numbers and their products. Local and global fuzzy weights of the alternatives are determined using linear programming. In the paper a formula for ranking fuzzy numbers by reduced generalized fuzzy mean is also proposed, since ranking by the coefficient of variation is not always reliable. In the presented case study, applying proposed method, from imprecise input data are obtained enough accurate and useful results for rational ranking of alternatives related to the project realization.
- Open Access
- 1 January 2014
- Published by Centre for Evaluation in Education and Science (CEON/CEES) in Građevinski materijali i konstrukcije
- Vol. 57 (3) , 43-61
Application of modified fuzzy TOPSIS method for multicriteria decisions in civil engineering
In this paper is presented and applied one fuzzy TOPSIS method for the multicriteria ranking of objects for reconstruction and maintenance. At the beginning is given short review on the genesis and development of this method and described a TOPSIS procedure with crisp input data that constitute a decision matrix and weights of criteria. This procedure is illustrated by one simple numerical example. The necessity of presentation of these parameters as triangular fuzzy numbers due to impossibility of their precise determination or assessment in the practice. The exact expressions for the determination of these products of the decision matrix and weights coefficients as triangular fuzzy numbers, that authors of this paper are derived earlier, are given in the paper. For every alternative (the object) these parameters are assumed as random fuzzy numbers for which are determined generalised expected values, variances and standard deviations. From the normalised matrix of the expected values are determined expected ideal positive and ideal negative values. For every alternative are determined generalized expected distances and relative closenesses to the ideal positive and ideal negative solution. The ranking of alternatives is performed according to these values. Mathematical expressions for coefficients of investments distribution on the alternatives (objects) are proposed in the work. One example of ranking of the bridge structures according to the risk is given at the end of the work and formulated corresponding conclusions.
- 1 January 2014
- Published by Centre for Evaluation in Education and Science (CEON/CEES) in Građevinski materijali i konstrukcije
- Vol. 57 (3) , 43-61
Open AccessApplication of modified fuzzy TOPSIS method for multicriteria decisions in civil engineering
In this paper is presented and applied one fuzzy TOPSIS method for the multicriteria ranking of objects for reconstruction and maintenance. At the beginning is given short review on the genesis and development of this method and described a TOPSIS procedure with crisp input data that constitute a decision matrix and weights of criteria. This procedure is illustrated by one simple numerical example. The necessity of presentation of these parameters as triangular fuzzy numbers due to impossibility of their precise determination or assessment in the practice. The exact expressions for the determination of these products of the decision matrix and weights coefficients as triangular fuzzy numbers, that authors of this paper are derived earlier, are given in the paper. For every alternative (the object) these parameters are assumed as random fuzzy numbers for which are determined generalised expected values, variances and standard deviations. From the normalised matrix of the expected values are determined expected ideal positive and ideal negative values. For every alternative are determined generalized expected distances and relative closenesses to the ideal positive and ideal negative solution. The ranking of alternatives is performed according to these values. Mathematical expressions for coefficients of investments distribution on the alternatives (objects) are proposed in the work. One example of ranking of the bridge structures according to the risk is given at the end of the work and formulated corresponding conclusions.