Bertrand Peluso
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Bertrand Peluso has a total of 94 co-authors. Here are the top co-authors by number of shared publications:
Arnaud Devred
ITER Organization, St. Paul Lez Durance, France
2 shared publicationsChen-Yu Gung
ITER Organization, St. Paul Lez Durance, France
2 shared publications- Hyungjun Kim
ITER Organization, St. Paul Lez Durance, France
2 shared publications Neil Mitchell
ITER Organization, St. Paul Lez Durance, France
2 shared publicationsPatrick Decool
Commissariat à l’énergie atomique et aux énergies alternatives, St. Paul lez Durance, France
2 shared publicationsA. Baratta
1 shared publication
Latest Publications
- 1 November 2024
- Published by AIP Publishing in Review of Scientific Instruments
- Vol. 95 (11)
Design, justification, and prototyping of the visible and infrared wide angle viewing system diagnostic for ITER equatorial port 12
The ITER equatorial visible and infrared Wide Angle Viewing System (WAVS) will play a major role in the protection of plasma facing components by providing surface temperature measurements of these components. It will also image the plasma emission in the visible range. The WAVS is composed of 15 lines of sight located in four Equatorial Ports (EPs) 3, 9, 12, and 17. Its development is being carried out by the Consortium constituted by CEA, CIEMAT, INTA, and Bertin Technologies, within grant contracts financed by F4E. In the EP12, the in-vessel and ex-vessel components of the WAVS are at their final design phase. This article presents an overview of the opto-mechanical design of the WAVS in the EP12 presented at the final design review.
- 1 November 2024
- Published by AIP Publishing in Review of Scientific Instruments
- Vol. 95 (11)
Design, justification, and prototyping of the visible and infrared wide angle viewing system diagnostic for ITER equatorial port 12
The ITER equatorial visible and infrared Wide Angle Viewing System (WAVS) will play a major role in the protection of plasma facing components by providing surface temperature measurements of these components. It will also image the plasma emission in the visible range. The WAVS is composed of 15 lines of sight located in four Equatorial Ports (EPs) 3, 9, 12, and 17. Its development is being carried out by the Consortium constituted by CEA, CIEMAT, INTA, and Bertin Technologies, within grant contracts financed by F4E. In the EP12, the in-vessel and ex-vessel components of the WAVS are at their final design phase. This article presents an overview of the opto-mechanical design of the WAVS in the EP12 presented at the final design review.
- 13 September 2023
- Published by Elsevier in Fusion Engineering and Design
- Vol. 196
Procedure qualification and integration of the continuous external Rogowski diagnostics to the superconducting magnets of ITER tokamak
- 13 September 2023
- Published by Elsevier in Fusion Engineering and Design
- Vol. 196
Procedure qualification and integration of the continuous external Rogowski diagnostics to the superconducting magnets of ITER tokamak
- 1 November 2021
- Published by Elsevier in Fusion Engineering and Design
- Vol. 172
Virtual and Augmented Reality Use Cases for Fusion Design Engineering
- 1 November 2021
- Published by Elsevier in Fusion Engineering and Design
- Vol. 172
Virtual and Augmented Reality Use Cases for Fusion Design Engineering
- 28 December 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 28 (3) , 1-6
Status and Qualification Test of Feeder Main Busbar Joint for ITER Magnet System
This paper describes the result of the ITER feeder main busbar joint sample qualification test as confirmation of the requirement of busbar joint resistance, 2 nΩ at 70 kA at zero background field, as well as that of joint performance in various magnetic fields to investigate stability and current distribution characteristics in feeder-type joint box. The results support the quality of the joint manufacturing process for ITER main busbar joint. The qualification sample design was prepared to be tested in SULTAN facility. The SULTAN joint sample consists of joints to be qualified at the level of the peak field and upper terminations. In bottom joints, twin-box feeder-type praying hands configuration is applied. In upper terminations, one of them is made with solder-filled cable for optimum current distribution. The other takes the same length of the copper sole and contact with the busbar cable as those positioned in bottom of the sample. The sample undergoes a test program, which includes joint resistance measurement, ac losses, and stability margin test. The outcomes of those test programs are reported.
- 28 December 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 28 (3) , 1-6
Status and Qualification Test of Feeder Main Busbar Joint for ITER Magnet System
This paper describes the result of the ITER feeder main busbar joint sample qualification test as confirmation of the requirement of busbar joint resistance, 2 nΩ at 70 kA at zero background field, as well as that of joint performance in various magnetic fields to investigate stability and current distribution characteristics in feeder-type joint box. The results support the quality of the joint manufacturing process for ITER main busbar joint. The qualification sample design was prepared to be tested in SULTAN facility. The SULTAN joint sample consists of joints to be qualified at the level of the peak field and upper terminations. In bottom joints, twin-box feeder-type praying hands configuration is applied. In upper terminations, one of them is made with solder-filled cable for optimum current distribution. The other takes the same length of the copper sole and contact with the busbar cable as those positioned in bottom of the sample. The sample undergoes a test program, which includes joint resistance measurement, ac losses, and stability margin test. The outcomes of those test programs are reported.
- 15 November 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 28 (3) , 1-6
Magnet Infrastructure Facilities for ITER (MIFI): Description and Activities Overview
ITER magnets are in the final phases of production and are preparing for the upcoming assembly challenges. The ITER magnet team has expressed the need for close-range support labs in order to perform qualification tests, procedure tuning, mockup testing, site acceptance tests, as well as training of assembly staff and logistics management. In the framework of its general support to the ITER project, CEA's Institute for Magnetic Fusion Research proposed a support structure in line with this need on CEA Cadarache premises. In July 2014, the MIFI agreement (Magnet Infrastructure Facilities for ITER) was signed between ITER organization and CEA. It led to the creation of four laboratories and a storage area dedicated to magnet instrumentation components. This paper gives a general description of the work organization in MIFI, and describes the main ongoing activities with specific focuses on critical qualification activities like high-voltage testing and diagnostic of Glass–Kapton–Glass resin impregnated insulation and the scale 1 mock-up and test of the intermediate outer intercoil structure assembly procedure.
- 15 November 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 28 (3) , 1-6
Magnet Infrastructure Facilities for ITER (MIFI): Description and Activities Overview
ITER magnets are in the final phases of production and are preparing for the upcoming assembly challenges. The ITER magnet team has expressed the need for close-range support labs in order to perform qualification tests, procedure tuning, mockup testing, site acceptance tests, as well as training of assembly staff and logistics management. In the framework of its general support to the ITER project, CEA's Institute for Magnetic Fusion Research proposed a support structure in line with this need on CEA Cadarache premises. In July 2014, the MIFI agreement (Magnet Infrastructure Facilities for ITER) was signed between ITER organization and CEA. It led to the creation of four laboratories and a storage area dedicated to magnet instrumentation components. This paper gives a general description of the work organization in MIFI, and describes the main ongoing activities with specific focuses on critical qualification activities like high-voltage testing and diagnostic of Glass–Kapton–Glass resin impregnated insulation and the scale 1 mock-up and test of the intermediate outer intercoil structure assembly procedure.