A. M. Ospina-Alvarado has a total of 1 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Interaction of Processes and Phases in Project Scheduling Using BIM for A/E/C/FM Integration

    by A. M. Ospina-Alvarado, D. Castro-Lacouture

    Current construction practice is very fragmented and is built upon a culture of adversarial roles; the different processes are carried out by various stakeholders who are not contractually responsible to each other and who many times are brought into the project after all major decisions have been made. The information exchange between the different parties is very limited. Building Information Modeling (BIM) is a tool that can foster project integration on different levels, because it can facilitate information exchange, access to real time information, and information gathering among project members. One specific application that can demonstrate how BIM can be used to integrate the team, the processes and the project phases is the use of BIM for the scheduling process. This paper defines Architecture, Engineering, Construction, and Facility Management (A/E/C/FM) integration, describes how BIM can enable project integration using the specific example of scheduling throughout the project using a preliminary model that leverages the capabilities of BIM, not only for 4D visualization, but also to generate and manage the schedule.