  • USING LARGE LANGUAGE MODELS IN PROJECT MANAGEMENT

    by Krzysztof S. Targiel

    Purpose: The purpose of this work is to present preliminary research results on the automatic detection of destructive emotions in project management using large-scale language models. The paper aims to present an architecture for identifying negative emotions in open-source projects. Design/methodology/approach: This article focuses on identifying destructive emotions in text-based communication available in open-source projects through the use of Large Language Models (LLMs). Using available training data with labels describing emotions associated with text, the BERT model is instructed to identify basic emotions in text. The LLM model will be trained to identify instances where anger—an example of a destructive emotion—appears in email correspondence related to open-source projects. The trained model can then be used to identify emotions in further correspondence. This approach will be used to develop a system architecture that will enable automatic emotion identification. Findings: The results of this study demonstrate that it is possible to configure Large Language Models (LLM) to identify emotions in project-related electronic communications. Detailed research is needed to confirm the effectiveness of this approach. However, such research requires significant computing power. Research limitations/implications: The study concentrated on the potential of Large Language Models to automatically detect emotions in project management communication. Rather than achieving high-quality identification, the objective was to validate the concept of utilizing Large Language Models for this purpose. The sole instance of such a model utilized was BERT. Originality/value: The novelty of this paper is the attempt to use Large Language Models to automatically detect emotions in project management. Previously, this type of analysis used dictionary-based methods for sentiment analysis. This paper continues the idea of identifying negative emotions.

  • Detection of destructive emotions in projects implemented in the open source formula

    by Krzysztof Targiel

    Purpose: The aim of this paper is to present findings in automatic emotion detection in project management. Design/methodology/approach: The approach adopted involves psychological literature review in area of destructive emotions. Then, an attempt was made to detect such emotions in text communication available in Open Source projects using neural networks. The neural network was trained to recognize basic emotions in text, based on available labeled training data. Then, the network trained in this way was used to recognize situations in which anger as an example of a destructive emotion, occurs in electronic communication regarding an Open Source projects. Findings: The paper discusses three fundamental research questions that arise in the context of using machine learning methods to analyze emotions in projects. The first of them concerned what data can be used for analysis. It was established that electronic communication in projects implemented in the open source formula is publicly available and susceptible to text analysis. The second question concerned the methods that can be used in the analysis of emotions. Here it was established that machine learning methods may be useful due to the problems described in the literature with the use of dictionary methods. The third question concerned the existence of tools for use in detecting emotions. This is a question about whether machine learning methods are actually able to recognize emotions in real communication taking place in software projects. Research limitations/implications: In the work, the analysis of the possibilities of automatic emotion detection in project management was presented. The focus was on detecting one type of emotion, namely "anger" as the most important from the point of view of project coherence. Further research may concern the detection of other emotions and their constellations. Originality/value: The novelty of paper is an attempt to define a framework for the use of known methods of automatic emotion detection in project management. Keywords: project management; emotion recognition; natural language processing. Category of the paper: Conceptual paper.

  • Open Access

    Scheduling non-critical activities using multicriteria approach

    by Krzysztof S. Targiel, Maciej Nowak, Tadeusz Trzaskalik

    In many projects the problem of selecting the start time of a non-critical activity arises. Usually it is possible to use the “as soon as possible” or “as late as possible” rules. In some situations, however, the result of such a decision depends on external factors such as exchange rate. This leads to an approach in which the problem of scheduling non-critical activities is solved using an expanded Cox–Ross–Rubinstein (CRR) binomial tree method. In the paper a bi-criteria problem of determining the start time of a non-critical activity is considered. We assume that the early start and the late start of the activity have been identified using Critical Path Method, but the project manager is free to select the time when the activity will actually be started. This decision cannot, however, be changed later, as it is associated with the allocation of key resources. Two main criteria are considered: cost and risk. While cost depends on exchange rate, risk increases with the delay of the start of the activity. The problem can be described as a dynamic process. We propose a new interactive technique for solving such a bi-criteria decision making problem under risk. The procedure uses trade-offs to identify a candidate solution. The CRR binomial method is applied to evaluate the cost of the activity.


  • Open Access

    Wybór momentu rozpoczęcia projektu z wykorzystaniem interaktywnego podejścia wielokryterialnego

    by Uniwersytet Ekonomiczny w Katowicach Wydział Informatyki i Komunikacji, Krzysztof S. Targiel, Maciej Nowak, Tadeusz Trzaskalik

    Streszczenie W wielu projektach pojawia się problem wyboru momentu ich rozpoczęcia. Jest to istotne, np. gdy końcowe rezultaty są uzależnione od kursów wymiany walut. Można oczekiwać korzystniejszej sytuacji, lecz wiąże się to z ryzykiem opóźnienia projektu poza dopuszczalne granice. W pracy oparto się na metodzie Coxa-Rossa-Rubinsteina (CRR), wykorzystując drzewa dwumianowe do modelowania scenariuszy rozwoju sytuacji na rynku walutowym. Problem potraktowano dwukryterialnie, przyjmując za kryteria koszt realizacji przedsięwzięcia oraz prawdopodobieństwo, że projekt się opóźni. Przyjęto również, że parametry rozkładu prawdopodobieństwa są określane przez ekspertów. Problem przedstawiono jako proces dynamiczny. Do jego rozwiązania zaproponowano technikę interaktywną. Procedura wykorzystuje współczynniki wymiany do wyznaczenia proponowanego wariantu, który jest następnie oceniany przez decydenta.

  • Dynamic programming in the binomial tree structures for real options analysis

    by Krzysztof S. Targiel

    Traditional project valuation is based on Discounted Cash Flow (DCF) methods, with Net Present Value (NPV) as main criterion of project effectiveness. But this approach sometimes leads to abandon profitable projects, because DCF don't account managerial flexibility. Real Option Valuation could improve this situation. There are many methods of this valuation. Most important methods are based on binomial tree framework, where Dynamic Programming is used. There are well-known methods in which the value of the option depends on one factor. In this paper we consider a situation in which the real option depends on two factors. This leads to higher computational complexity, which will be examined in the work.

  • Support for Sustainable Development Projects based on Real Options

    by Krzysztof S. Targiel

    Project management is the most effective way of development. This applies especially to sustainable development. The complexity of modern projects makes the proper management of them crucial. The volatile environment of the twenty‐first century means that it is important to choose the right moment to start a project. In a situation where the decision to start is irreversible, we are dealing with a real option. The paper presents a method for choosing the right moment to start a project on the basis of multi‐state real options. The TOPSIS method was used to choose the efficient decision.