Ion Cristescu
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Ion Cristescu has a total of 30 co-authors. Here are the top co-authors by number of shared publications:
A. Bükki-Deme
Karlsruhe Institute for Technology, Institute for Technical Physics, Tritium Laboratory Karlsruhe, Herrmann von-Helmholtz-Platz 1, Eggenstein - Leopoldshafen D-76344, Germany
1 shared publicationA. Santucci
ENEA, Fusion and Technology for Nuclear Safety and Security Department, Italy
1 shared publication- Alessandro Del Nevo
ENEA NUC-ING, CR Brasimone, Camugnano, BO, Italy
1 shared publication - Alessandro Venturini
ENEA Brasimone, Camugnano, 40032 Bologna, Italy
1 shared publication - Anisia Bornea
National R&D Institute for Cryogenics and Isotopic Technologies
1 shared publication C. Melzer
Karlsruhe Institute for Technology, Institute for Technical Physics, Tritium Laboratory Karlsruhe, Herrmann von-Helmholtz-Platz 1, Eggenstein - Leopoldshafen D-76344, Germany
1 shared publication
Latest Publications
- Open Access
- 3 August 2023
- Published by MDPI AG in Journal of Nuclear Engineering
- Vol. 4 (3) , 565-601
Advancements in Designing the DEMO Driver Blanket System at the EU DEMO Pre-Conceptual Design Phase: Overview, Challenges and Opportunities
The EU conducted the pre-conceptual design (PCD) phase of the demonstration reactor (DEMO) during 2014–2020 under the framework of the EUROfusion consortium. The current strategy of DEMO design is to bridge the breeding blanket (BB) technology gaps between ITER and a commercial fusion power plant (FPP) by playing the role of a “Component Test Facility” for the BB. Within this strategy, a so-called driver blanket, with nearly full in-vessel surface coverage, will aim at achieving high-level stakeholder requirements of tritium self-sufficiency and power extraction for net electricity production with rather conventional technology and/or operational parameters, while an advanced blanket (or several of them) will aim at demonstrating, with limited coverage, features that are deemed necessary for a commercial FPP. Currently, two driver blanket candidates are being investigated for the EU DEMO, namely the water-cooled lithium lead and the helium-cooled pebble bed breeding blanket concepts. The PCD phase has been characterized not only by the detailed design of the BB systems themselves, but also by their holistic integration in DEMO, prioritizing near-term solutions, in accordance with the idea of a driver blanket. This paper summarizes the status for both BB driver blanket candidates at the end of the PCD phase, including their corresponding tritium extraction and removal (TER) systems, underlining the main achievements and lessons learned, exposing outstanding key system design and R&D challenges and presenting identified opportunities to address those risks during the conceptual design (CD) phase that started in 2021.
- 3 August 2023
- Published by MDPI AG in Journal of Nuclear Engineering
- Vol. 4 (3) , 565-601
Open AccessAdvancements in Designing the DEMO Driver Blanket System at the EU DEMO Pre-Conceptual Design Phase: Overview, Challenges and Opportunities
The EU conducted the pre-conceptual design (PCD) phase of the demonstration reactor (DEMO) during 2014–2020 under the framework of the EUROfusion consortium. The current strategy of DEMO design is to bridge the breeding blanket (BB) technology gaps between ITER and a commercial fusion power plant (FPP) by playing the role of a “Component Test Facility” for the BB. Within this strategy, a so-called driver blanket, with nearly full in-vessel surface coverage, will aim at achieving high-level stakeholder requirements of tritium self-sufficiency and power extraction for net electricity production with rather conventional technology and/or operational parameters, while an advanced blanket (or several of them) will aim at demonstrating, with limited coverage, features that are deemed necessary for a commercial FPP. Currently, two driver blanket candidates are being investigated for the EU DEMO, namely the water-cooled lithium lead and the helium-cooled pebble bed breeding blanket concepts. The PCD phase has been characterized not only by the detailed design of the BB systems themselves, but also by their holistic integration in DEMO, prioritizing near-term solutions, in accordance with the idea of a driver blanket. This paper summarizes the status for both BB driver blanket candidates at the end of the PCD phase, including their corresponding tritium extraction and removal (TER) systems, underlining the main achievements and lessons learned, exposing outstanding key system design and R&D challenges and presenting identified opportunities to address those risks during the conceptual design (CD) phase that started in 2021.
- 5 May 2020
- Published by Taylor & Francis in Fusion Science and Technology
- Vol. 76 (4) , 446-457
Overview of the Tritium Technologies for the EU DEMO Breeding Blanket
The development of commercial fusion power production using deuterium and tritium has been ongoing worldwide for decades and the European version of DEMO will undergo conceptual design between 2021 and 2027. Among the different ways to provide electrical power, nuclear fusion will be publicly accepted if the environmental impact is at tolerable levels. The auxiliary power requirements of fusion power reactors will need to be optimized, and heat will need to be efficiently converted to electrical power through the usage of high-temperature steam. On the other hand, heat might need to be intermittently stored to account for pulsed plasma operation, on the expense of the temperature level available for steam generation. Tritium is highly mobile and its management as far as containment and confinement are concerned becomes more difficult with the increasing temperatures of the structural materials; any effluents and releases should be kept to an absolute minimum. Therefore, tritium containment and confinement equipment and procedures need to be well integrated into the design and into the operation of fusion power reactors. This paper focuses on the topics of the main tritium technologies under development in the EU DEMO Breeding Blanket Program, covering especially tritium breeding and extraction technologies. In addition, the identification of the main tritium sources as far as permeation and escape into the environment are concerned and the main barriers for the mitigation of tritium release into the environment are introduced.
- 5 May 2020
- Published by Taylor & Francis in Fusion Science and Technology
- Vol. 76 (4) , 446-457
Overview of the Tritium Technologies for the EU DEMO Breeding Blanket
The development of commercial fusion power production using deuterium and tritium has been ongoing worldwide for decades and the European version of DEMO will undergo conceptual design between 2021 and 2027. Among the different ways to provide electrical power, nuclear fusion will be publicly accepted if the environmental impact is at tolerable levels. The auxiliary power requirements of fusion power reactors will need to be optimized, and heat will need to be efficiently converted to electrical power through the usage of high-temperature steam. On the other hand, heat might need to be intermittently stored to account for pulsed plasma operation, on the expense of the temperature level available for steam generation. Tritium is highly mobile and its management as far as containment and confinement are concerned becomes more difficult with the increasing temperatures of the structural materials; any effluents and releases should be kept to an absolute minimum. Therefore, tritium containment and confinement equipment and procedures need to be well integrated into the design and into the operation of fusion power reactors. This paper focuses on the topics of the main tritium technologies under development in the EU DEMO Breeding Blanket Program, covering especially tritium breeding and extraction technologies. In addition, the identification of the main tritium sources as far as permeation and escape into the environment are concerned and the main barriers for the mitigation of tritium release into the environment are introduced.
- 1 September 2019
- Published by Elsevier in Fusion Engineering and Design
- Vol. 146, 398-401
Studies on helium-3 separation at Cernavoda nuclear power plant
- 1 September 2019
- Published by Elsevier in Fusion Engineering and Design
- Vol. 146, 398-401
Studies on helium-3 separation at Cernavoda nuclear power plant
- 2 March 2017
- Published by Taylor & Francis in Fusion Science and Technology
- Vol. 71 (3) , 225-230
Review of the TLK Activities Related to Water Detritiation, Isotope Separation Based on Cryogenic Distillation and Development of Barriers Against Tritium Permeation
The design of ITER tritium processing systems will benefit from experimental data and process validation based on experimental facilities that are ITER scale relevant. Several rigs and experimental facilities have been enhanced and developed at the Tritium Laboratory Karlsruhe (TLK) in order to explore a wide range of envisaged scenarios of tritium plant systems, such as the Water Detritiation System (WDS), Isotope Separation System (ISS) and highly tritiated water processing. In the last few years, detailed experimental investigations and process modeling have been conducted in relation to the Combined Electrolysis Catalytic Exchange and Isotope Separation (CECE-ISS) systems which were focused on evaluation of the impact of deuterium build-up and accumulation in the CECE system. An enhanced configuration of the ITER WDS has been developed, that allows mitigation of the effects due to deuterium accumulation and reduction of the tritium inventory within the electrolysis system. In addition, the benefits concerning the interface between the WDS and ISS are presented. Significant efforts have been made to enhance the simulation tool TRIMO++ that was calibrated against the experimental results collected from the experimental rigs. The new features of the simulation tools are introduced as well. The main references of a new method aiming to mitigate the tritium permeation from the tritium processes streams into the non-contaminated streams such as steam generators are introduced. The reference configuration of first phase of the experimental rigs and the preliminary experimental activities are presented as well.
- 2 March 2017
- Published by Taylor & Francis in Fusion Science and Technology
- Vol. 71 (3) , 225-230
Review of the TLK Activities Related to Water Detritiation, Isotope Separation Based on Cryogenic Distillation and Development of Barriers Against Tritium Permeation
The design of ITER tritium processing systems will benefit from experimental data and process validation based on experimental facilities that are ITER scale relevant. Several rigs and experimental facilities have been enhanced and developed at the Tritium Laboratory Karlsruhe (TLK) in order to explore a wide range of envisaged scenarios of tritium plant systems, such as the Water Detritiation System (WDS), Isotope Separation System (ISS) and highly tritiated water processing. In the last few years, detailed experimental investigations and process modeling have been conducted in relation to the Combined Electrolysis Catalytic Exchange and Isotope Separation (CECE-ISS) systems which were focused on evaluation of the impact of deuterium build-up and accumulation in the CECE system. An enhanced configuration of the ITER WDS has been developed, that allows mitigation of the effects due to deuterium accumulation and reduction of the tritium inventory within the electrolysis system. In addition, the benefits concerning the interface between the WDS and ISS are presented. Significant efforts have been made to enhance the simulation tool TRIMO++ that was calibrated against the experimental results collected from the experimental rigs. The new features of the simulation tools are introduced as well. The main references of a new method aiming to mitigate the tritium permeation from the tritium processes streams into the non-contaminated streams such as steam generators are introduced. The reference configuration of first phase of the experimental rigs and the preliminary experimental activities are presented as well.
- 1 June 2009
- Published by Elsevier in Fusion Engineering and Design
- Vol. 84 (2-6) , 398-403
Design and experimental activities in view of Water Detritiation–Isotopic Separation Systems combination in TRENTA facility
- 1 June 2009
- Published by Elsevier in Fusion Engineering and Design
- Vol. 84 (2-6) , 398-403
Design and experimental activities in view of Water Detritiation–Isotopic Separation Systems combination in TRENTA facility