Ahmad Perwira Mulia Tarigan
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Ahmad Perwira Mulia Tarigan has a total of 24 co-authors. Here are the top co-authors by number of shared publications:
- Gina Cynthia Raphita Hasibuan
Universitas Sumatera Utara
5 shared publications - Emma Patricia Bangun
Universitas Sumatera Utara
2 shared publications Hasanul Arifin Purba
Civil Engineering Postgraduate Program, Universitas Sumatera Utara, Medan, Indonesia
2 shared publicationsAchmad Djamaludin
Chief Commissioner, PT Pelindo 1
1 shared publication- Ahmad Arifin Porkas Lubis
Universitas Sumatera Utara
1 shared publication D Gusrianti
Environmental Engineering Department, Faculty of Engineering, University of Sumatera Utara
1 shared publication
Latest Publications
- Open Access
- 1 October 2025
- Published by CV. Syntax Corporation Indonesia in Syntax Literate ; Jurnal Ilmiah Indonesia
- Vol. 10 (10) , 8454-8467
Prioritas Pemilihan Tipe Fondasi Jembatan Gantung Cubancer Menggunakan Metode AHP dan Topsis
Dalam konteks perencanaan jembatan, tantangan yang dihadapi dalam pemilihan fondasi yang tepat menjadi faktor krusial untuk memastikan keselamatan dan keberlanjutan struktur. Dalam prosesnya, umumnya pembangunan jembatan memiliki permasalahan teknis dan nonteknis. Permasalahan nonteknis tersebut dapat jumpai seperti ketersediaan material, aksesibilitas, dan kemudahan pengerjaan. Jembatan gantung Cubancer, sebagai salah satu jenis jembatan yang kompleks, memerlukan pendekatan yang sistematis dalam menentukan fondasi yang sesuai. Penelitian ini bertujuan untuk mengidentifikasi bobot kriteria dalam perencanaan jembatan dan menentukan prioritas alternatif desain fondasi jembatan gantung Cubancer menggunakan metode Analytic Hierarchy Process (AHP) dan Technique for Order Preference by Similarity to Ideal Solution (TOPSIS). Metodologi yang digunakan meliputi pengumpulan data primer melalui kuesioner yang disebarkan kepada responden yang berpengalaman dalam perencanaan dan pelaksanaan jembatan. Hasil analisis menunjukkan bahwa kriteria konstruksi memiliki bobot tertinggi (0,488) dalam metode AHP, sedangkan dalam metode TOPSIS, biaya pelaksanaan dan waktu pelaksanaan memiliki nilai kepentingan tertinggi (4,778). Prioritas alternatif desain fondasi jembatan menunjukkan bahwa fondasi langsung adalah pilihan terbaik dengan skor AHP sebesar 4,204 dan skor TOPSIS sebesar 0,867. Penggunaan metode AHP dan TOPSIS dapat memberikan keputusan yang lebih objektif dan tepat dalam pemilihan fondasi jembatan.
- 1 October 2025
- Published by CV. Syntax Corporation Indonesia in Syntax Literate ; Jurnal Ilmiah Indonesia
- Vol. 10 (10) , 8454-8467
Open AccessPrioritas Pemilihan Tipe Fondasi Jembatan Gantung Cubancer Menggunakan Metode AHP dan Topsis
Dalam konteks perencanaan jembatan, tantangan yang dihadapi dalam pemilihan fondasi yang tepat menjadi faktor krusial untuk memastikan keselamatan dan keberlanjutan struktur. Dalam prosesnya, umumnya pembangunan jembatan memiliki permasalahan teknis dan nonteknis. Permasalahan nonteknis tersebut dapat jumpai seperti ketersediaan material, aksesibilitas, dan kemudahan pengerjaan. Jembatan gantung Cubancer, sebagai salah satu jenis jembatan yang kompleks, memerlukan pendekatan yang sistematis dalam menentukan fondasi yang sesuai. Penelitian ini bertujuan untuk mengidentifikasi bobot kriteria dalam perencanaan jembatan dan menentukan prioritas alternatif desain fondasi jembatan gantung Cubancer menggunakan metode Analytic Hierarchy Process (AHP) dan Technique for Order Preference by Similarity to Ideal Solution (TOPSIS). Metodologi yang digunakan meliputi pengumpulan data primer melalui kuesioner yang disebarkan kepada responden yang berpengalaman dalam perencanaan dan pelaksanaan jembatan. Hasil analisis menunjukkan bahwa kriteria konstruksi memiliki bobot tertinggi (0,488) dalam metode AHP, sedangkan dalam metode TOPSIS, biaya pelaksanaan dan waktu pelaksanaan memiliki nilai kepentingan tertinggi (4,778). Prioritas alternatif desain fondasi jembatan menunjukkan bahwa fondasi langsung adalah pilihan terbaik dengan skor AHP sebesar 4,204 dan skor TOPSIS sebesar 0,867. Penggunaan metode AHP dan TOPSIS dapat memberikan keputusan yang lebih objektif dan tepat dalam pemilihan fondasi jembatan.
- Open Access
- 1 August 2025
- Published by CV. Syntax Corporation Indonesia in Syntax Literate ; Jurnal Ilmiah Indonesia
- Vol. 10 (8) , 6180-6188
Analisis Keberlanjutan Program Pamsimas Menggunakan Metode AHP: Studi Kasus Di Desa Binjai Baru, Kabupaten Batu Bara
Program Penyediaan Air Minum dan Sanitasi Berbasis Masyarakat (PAMSIMAS) merupakan inisiatif pemerintah untuk meningkatkan akses air bersih di wilayah perdesaan. Namun, keberlanjutan program ini sering menghadapi kendala teknis, kelembagaan, sosial, ekonomi, dan lingkungan. Penelitian ini bertujuan untuk mengevaluasi faktor-faktor yang memengaruhi keberlanjutan program PAMSIMAS di Desa Binjai Baru, Kabupaten Batu Bara, serta menetapkan prioritas kriteria keberlanjutan menggunakan metode Analytical Hierarchy Process (AHP). Data diperoleh melalui penyebaran kuesioner kepada masyarakat dan wawancara terhadap 10 responden ahli. Hasil menunjukkan bahwa sebagian besar sub-kriteria berada pada kategori "Baik", dengan skor tertinggi pada keandalan operasional sistem dan kualitas lingkungan air. Aspek sosial menjadi kriteria paling dominan (prioritas 0,2401), diikuti oleh ekonomi (0,2185), lingkungan (0,2058), teknologi (0,1844), dan kelembagaan (0,1512). Sub-kriteria terpenting adalah partisipasi masyarakat (0,1460), sistem iuran (0,1231), dan perlindungan lingkungan (0,1125). Hasil ini menunjukkan bahwa metode AHP efektif untuk menetapkan prioritas strategi keberlanjutan program air minum perdesaan. Rekomendasi diarahkan pada penguatan aspek sosial, sistem keuangan, serta peran kelembagaan yang berkelanjutan.
- 1 August 2025
- Published by CV. Syntax Corporation Indonesia in Syntax Literate ; Jurnal Ilmiah Indonesia
- Vol. 10 (8) , 6180-6188
Open AccessAnalisis Keberlanjutan Program Pamsimas Menggunakan Metode AHP: Studi Kasus Di Desa Binjai Baru, Kabupaten Batu Bara
Program Penyediaan Air Minum dan Sanitasi Berbasis Masyarakat (PAMSIMAS) merupakan inisiatif pemerintah untuk meningkatkan akses air bersih di wilayah perdesaan. Namun, keberlanjutan program ini sering menghadapi kendala teknis, kelembagaan, sosial, ekonomi, dan lingkungan. Penelitian ini bertujuan untuk mengevaluasi faktor-faktor yang memengaruhi keberlanjutan program PAMSIMAS di Desa Binjai Baru, Kabupaten Batu Bara, serta menetapkan prioritas kriteria keberlanjutan menggunakan metode Analytical Hierarchy Process (AHP). Data diperoleh melalui penyebaran kuesioner kepada masyarakat dan wawancara terhadap 10 responden ahli. Hasil menunjukkan bahwa sebagian besar sub-kriteria berada pada kategori "Baik", dengan skor tertinggi pada keandalan operasional sistem dan kualitas lingkungan air. Aspek sosial menjadi kriteria paling dominan (prioritas 0,2401), diikuti oleh ekonomi (0,2185), lingkungan (0,2058), teknologi (0,1844), dan kelembagaan (0,1512). Sub-kriteria terpenting adalah partisipasi masyarakat (0,1460), sistem iuran (0,1231), dan perlindungan lingkungan (0,1125). Hasil ini menunjukkan bahwa metode AHP efektif untuk menetapkan prioritas strategi keberlanjutan program air minum perdesaan. Rekomendasi diarahkan pada penguatan aspek sosial, sistem keuangan, serta peran kelembagaan yang berkelanjutan.
- Open Access
- 14 July 2025
- Published by MDPI AG in Preprints.org
Wind-Generated Wave Modeling for the Location of Cermin Beach in Pantai Cermin District, Serdang Bedagai Regency
Wind waves are generally considered to be surface gravity waves caused by wind and propagating under the restoring force of gravity. These waves have maximum particle motion right at the air-sea interface, the particle motion decreases rapidly with depth. They are distributed over most of the ocean, with long waves propagating faster than short waves. The research method used for this study is quantitative analysis, namely from secondary data (wind speed and direction data) in the Cermin Beach area using the Jonswap Parameters, Finite Water Depth and Sverdrup Munk Bretschneider methods. From the analysis results using the Windrose diagram, the dominant wind direction is 345°-15° with a percentage of 21.03%. For the Jonswap Parameters method, the maximum wave height and period are 0.906 m and 9.911 seconds. In the Finite Water Depth method, the maximum wave height and period for a depth of 3 meters are 1.304 m and 4.785 seconds, while at a depth of 10 meters they are 2.048 m and 6.743 seconds. In the Sverdrup Munk Bretschneider method, the maximum wave height and period for incomplete waves (Fetch Limited) are 1.815 m and 5.653 seconds, while for full waves (Fully Developed) they are 1.857 m and 5.750 seconds. In the results of the wave statistical return period, the maximum height results that occurred in the 100-year return period were obtained at a height of 10,445 m using the Gumbel method calculation with wave data from the Finite Water Depth method at a depth of 10 meters.
- 14 July 2025
- Published by MDPI AG in Preprints.org
Open AccessWind-Generated Wave Modeling for the Location of Cermin Beach in Pantai Cermin District, Serdang Bedagai Regency
Wind waves are generally considered to be surface gravity waves caused by wind and propagating under the restoring force of gravity. These waves have maximum particle motion right at the air-sea interface, the particle motion decreases rapidly with depth. They are distributed over most of the ocean, with long waves propagating faster than short waves. The research method used for this study is quantitative analysis, namely from secondary data (wind speed and direction data) in the Cermin Beach area using the Jonswap Parameters, Finite Water Depth and Sverdrup Munk Bretschneider methods. From the analysis results using the Windrose diagram, the dominant wind direction is 345°-15° with a percentage of 21.03%. For the Jonswap Parameters method, the maximum wave height and period are 0.906 m and 9.911 seconds. In the Finite Water Depth method, the maximum wave height and period for a depth of 3 meters are 1.304 m and 4.785 seconds, while at a depth of 10 meters they are 2.048 m and 6.743 seconds. In the Sverdrup Munk Bretschneider method, the maximum wave height and period for incomplete waves (Fetch Limited) are 1.815 m and 5.653 seconds, while for full waves (Fully Developed) they are 1.857 m and 5.750 seconds. In the results of the wave statistical return period, the maximum height results that occurred in the 100-year return period were obtained at a height of 10,445 m using the Gumbel method calculation with wave data from the Finite Water Depth method at a depth of 10 meters.
- Open Access
- 3 March 2025
- Published by Publikasi Indonesia in COMSERVA : Jurnal Penelitian dan Pengabdian Masyarakat
- Vol. 4 (11) , 4056-4073
Analisis Faktor Penyebab Pembengkakan Biayakonstruksi (Cost Overrun) Pada Proyek Konstruksi Di Kota Medan
Pelaksanaan proyek konstruksi di Kota Medan tidak terlepas dari risiko terjadinya cost overrun, sehingga penting menganalisis faktor penyebab tersebut untuk mengantisipasi terjadinya cost overrun. Penelitian ini bertujuan untuk menganalisis faktor penyebab cost overrun pada proyek konstruksi; menganalisis nilai bobot faktor penyebab cost overrun; dan menganalisis faktor dominan penyebab cost overrun. Penelitian ini menggunakan metode kuantitatif, melibatkan 13 responden secara purposive sampling pakar/ahli konstruksi. Analisis data menggunakan Rater Aiken dan deskriptif. Hasil penelitian berdasarkan kajian pustaka diperoleh 33 faktor lalu direduksi menjadi 27 faktor. Diperoleh 8 faktor dominan penyebab cost overrun berdasarkan Validitas Aiken (V) > 0,8, berurut mulai peringkat tertinggi: X6 (Kesalahan pekerjaan (rework)), X14 (Kesalahan perencanaan biaya), X5 (Kemampuan/produktivitas kerja tim yang buruk) , X3 (project manager tidak kompeten dan kurang berpengalaman), X7 (Waktu pelaksanaan lebih lama dari waktu yang direncanakan), X20 (pengendalian biaya buruk), X8 (kurangnya tenaga kerja terampil (kualitas pekerja buruk)), dan X9 (kurangnya pengalaman kontraktor dan koordinasi yang buruk antara kontraktor dengan pihak lainnya). Sedangkan satu faktor tambahan dari pakar/ahli adalah X32 (Kurangnya peralatan dan alat kerja). Penelitian ini menyarankan agar kontraktor memperhatikan faktor dominan untuk menghindari cost overrun dan menyarankan peneliti selanjutnya fokus pada besarnya nilai cost overrun.
- 3 March 2025
- Published by Publikasi Indonesia in COMSERVA : Jurnal Penelitian dan Pengabdian Masyarakat
- Vol. 4 (11) , 4056-4073
Open AccessAnalisis Faktor Penyebab Pembengkakan Biayakonstruksi (Cost Overrun) Pada Proyek Konstruksi Di Kota Medan
Pelaksanaan proyek konstruksi di Kota Medan tidak terlepas dari risiko terjadinya cost overrun, sehingga penting menganalisis faktor penyebab tersebut untuk mengantisipasi terjadinya cost overrun. Penelitian ini bertujuan untuk menganalisis faktor penyebab cost overrun pada proyek konstruksi; menganalisis nilai bobot faktor penyebab cost overrun; dan menganalisis faktor dominan penyebab cost overrun. Penelitian ini menggunakan metode kuantitatif, melibatkan 13 responden secara purposive sampling pakar/ahli konstruksi. Analisis data menggunakan Rater Aiken dan deskriptif. Hasil penelitian berdasarkan kajian pustaka diperoleh 33 faktor lalu direduksi menjadi 27 faktor. Diperoleh 8 faktor dominan penyebab cost overrun berdasarkan Validitas Aiken (V) > 0,8, berurut mulai peringkat tertinggi: X6 (Kesalahan pekerjaan (rework)), X14 (Kesalahan perencanaan biaya), X5 (Kemampuan/produktivitas kerja tim yang buruk) , X3 (project manager tidak kompeten dan kurang berpengalaman), X7 (Waktu pelaksanaan lebih lama dari waktu yang direncanakan), X20 (pengendalian biaya buruk), X8 (kurangnya tenaga kerja terampil (kualitas pekerja buruk)), dan X9 (kurangnya pengalaman kontraktor dan koordinasi yang buruk antara kontraktor dengan pihak lainnya). Sedangkan satu faktor tambahan dari pakar/ahli adalah X32 (Kurangnya peralatan dan alat kerja). Penelitian ini menyarankan agar kontraktor memperhatikan faktor dominan untuk menghindari cost overrun dan menyarankan peneliti selanjutnya fokus pada besarnya nilai cost overrun.
- Open Access
- 9 September 2024
- Published by Green Publisher in Eduvest - Journal of Universal Studies
- Vol. 4 (9) , 8103-8117
Connectivity Analysis of Non-Container Ports at PT Pelindo Multi Terminal Using SNA and GIS
This study aims to analyze the connectivity of non-containerized ports, particularly in the sub-commodity of vegetable/animal oils and fats, within the operational area of PT Pelindo Multi Terminal. Using Social Network Analysis (SNA) and Geographic Information System (GIS) techniques, this study builds a network based on nodes (ports) and assesses inter-node connections with metrics such as degree centrality, betweenness centrality, and hub index. Gephi application was used for the calculation of network metrics, while QGIS visualized the shipping routes. The research revealed that high traffic ports such as Belawan, Dumai, and Tanjung Priok play a crucial role in the network. The findings support recommendations for infrastructure development and implementation of an integrated Terminal Operations System (TOS) to improve logistics efficiency.
- 9 September 2024
- Published by Green Publisher in Eduvest - Journal of Universal Studies
- Vol. 4 (9) , 8103-8117
Open AccessConnectivity Analysis of Non-Container Ports at PT Pelindo Multi Terminal Using SNA and GIS
This study aims to analyze the connectivity of non-containerized ports, particularly in the sub-commodity of vegetable/animal oils and fats, within the operational area of PT Pelindo Multi Terminal. Using Social Network Analysis (SNA) and Geographic Information System (GIS) techniques, this study builds a network based on nodes (ports) and assesses inter-node connections with metrics such as degree centrality, betweenness centrality, and hub index. Gephi application was used for the calculation of network metrics, while QGIS visualized the shipping routes. The research revealed that high traffic ports such as Belawan, Dumai, and Tanjung Priok play a crucial role in the network. The findings support recommendations for infrastructure development and implementation of an integrated Terminal Operations System (TOS) to improve logistics efficiency.
- Open Access
- 1 October 2023
- Published by Ridwan Institute in Jurnal Syntax Admiration
- Vol. 4 (10) , 2135-2145
Analisis Kelaikan Fungsi Jalan Menggunakan Metode AHP dan Maut pada Ruas Jalan A.H. Nasution (Medan) dan Jalan Ngumban Surbakti (Medan)
Road infrastructure is an important aspect in supporting economic growth and human mobility. Good and safe road conditions will increase the effectiveness and efficiency of transportation. However, in reality, some road sections still do not meet fairly strict standards, both in terms of feasibility and safety. The roads of A.H. Nasution (Medan) and Ngumban Surbakti (Medan) have never undergone a feasibility test before. Therefore, in this study a ranking will be formed to determine the level of feasibility of the function of both. This study was conducted to evaluate the feasibility of A.H. Nasution (Medan) and Ngumban Surbakti (Medan) roads using the AHP (Analytical Hierarchy Process) method and the MAUT (Multi-Attribute Utility Theory) method. The data that has been collected will be processed and analyzed using the AHP and MAUT methods. The AHP method and the MAUT method are used to determine the relative weight of each of the factors affecting roadworthiness. Assessment of respondent data using the AHP method obtained the largest weight on road technical by 3.36 on the A.H. Nasution road section and 3.04 on the Ngumban Surbakti road section. While the smallest weight on technical road equipment is 0.592 on the A.H. Nasution road section and the utilization of the road section is 0.3 on the Ngumban Surbakti road section. The assessment of respondents' data using the MAUT method obtained the largest weight on road complementary building structures of 1,265 on the A.H. Nasution road section and 1,140 on the Ngumban Surbakti road section. While the smallest weight on the utilization of road sections is 0.04 on the A.H. Nasution road section and 0.413 on the Ngumban Surbakti road section.
- 1 October 2023
- Published by Ridwan Institute in Jurnal Syntax Admiration
- Vol. 4 (10) , 2135-2145
Open AccessAnalisis Kelaikan Fungsi Jalan Menggunakan Metode AHP dan Maut pada Ruas Jalan A.H. Nasution (Medan) dan Jalan Ngumban Surbakti (Medan)
Road infrastructure is an important aspect in supporting economic growth and human mobility. Good and safe road conditions will increase the effectiveness and efficiency of transportation. However, in reality, some road sections still do not meet fairly strict standards, both in terms of feasibility and safety. The roads of A.H. Nasution (Medan) and Ngumban Surbakti (Medan) have never undergone a feasibility test before. Therefore, in this study a ranking will be formed to determine the level of feasibility of the function of both. This study was conducted to evaluate the feasibility of A.H. Nasution (Medan) and Ngumban Surbakti (Medan) roads using the AHP (Analytical Hierarchy Process) method and the MAUT (Multi-Attribute Utility Theory) method. The data that has been collected will be processed and analyzed using the AHP and MAUT methods. The AHP method and the MAUT method are used to determine the relative weight of each of the factors affecting roadworthiness. Assessment of respondent data using the AHP method obtained the largest weight on road technical by 3.36 on the A.H. Nasution road section and 3.04 on the Ngumban Surbakti road section. While the smallest weight on technical road equipment is 0.592 on the A.H. Nasution road section and the utilization of the road section is 0.3 on the Ngumban Surbakti road section. The assessment of respondents' data using the MAUT method obtained the largest weight on road complementary building structures of 1,265 on the A.H. Nasution road section and 1,140 on the Ngumban Surbakti road section. While the smallest weight on the utilization of road sections is 0.04 on the A.H. Nasution road section and 0.413 on the Ngumban Surbakti road section.
- Open Access
- 3 February 2023
- Published by Ridwan Institute in Jurnal Syntax Admiration
- Vol. 4 (2) , 209-224
Penerapan Metode AHP dalam Penentuan Prioritas Pembangunan Jembatan Rangka di Kabupaten Deli Serdang
Bridges as an important part of the transportation system have a role in spurring economic growth and regional development. For this reason, the government is obliged to build bridge infrastructure in a stable condition so that connectivity between regions can be realized. Given the many infrastructure development activities that have been delayed since 2019 as a result refocusing as well as the limitations of the APBD, it is necessary to select the order of priority for the bridge implementation program. This study aims to analyze the dominant criteria and sub-criteria that need to be considered so that the order of priority for the construction of a truss bridge in Deli Serdang Regency can be compiled. The method used is AHP with a quantitative approach through a questionnaire. The criteria considered are economic (cost), technical (sub-criteria for bridge age, length, width, and implementation time), land use (sub-criteria for agriculture/plantation, tourism, fisheries, and mining), accessibility (sub-criteria for distance and time), social and regional development (the sub-criteria are population, social facilities, government facilities, and regional development), and policies (the sub-criteria are musrembang, Reses/Pokir DPRD, and stakeholders). The results of the study show that the dominant criteria to consider are social and regional development, followed by technical, land use, economic, policy, and accessibility criteria. The order of priority for the construction of a truss bridge is the Sei Belawan Bridge, Tanjung Anom Village as the first priority, the Bridge Lau Cirem Perpanden Village as the second priority, and Sei Serdang Bridge, Negara Beringin Village as the third priority.
- 3 February 2023
- Published by Ridwan Institute in Jurnal Syntax Admiration
- Vol. 4 (2) , 209-224
Open AccessPenerapan Metode AHP dalam Penentuan Prioritas Pembangunan Jembatan Rangka di Kabupaten Deli Serdang
Bridges as an important part of the transportation system have a role in spurring economic growth and regional development. For this reason, the government is obliged to build bridge infrastructure in a stable condition so that connectivity between regions can be realized. Given the many infrastructure development activities that have been delayed since 2019 as a result refocusing as well as the limitations of the APBD, it is necessary to select the order of priority for the bridge implementation program. This study aims to analyze the dominant criteria and sub-criteria that need to be considered so that the order of priority for the construction of a truss bridge in Deli Serdang Regency can be compiled. The method used is AHP with a quantitative approach through a questionnaire. The criteria considered are economic (cost), technical (sub-criteria for bridge age, length, width, and implementation time), land use (sub-criteria for agriculture/plantation, tourism, fisheries, and mining), accessibility (sub-criteria for distance and time), social and regional development (the sub-criteria are population, social facilities, government facilities, and regional development), and policies (the sub-criteria are musrembang, Reses/Pokir DPRD, and stakeholders). The results of the study show that the dominant criteria to consider are social and regional development, followed by technical, land use, economic, policy, and accessibility criteria. The order of priority for the construction of a truss bridge is the Sei Belawan Bridge, Tanjung Anom Village as the first priority, the Bridge Lau Cirem Perpanden Village as the second priority, and Sei Serdang Bridge, Negara Beringin Village as the third priority.
- Open Access
- 1 January 2023
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 2741 (1) , 030014
Shoreline change observation using UAV in muddy environment
Shoreline changes can occur at any time due to the influence of nature and human activities. This study demonstrates the application of UAV technology to genera
- 1 January 2023
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 2741 (1) , 030014
Open AccessShoreline change observation using UAV in muddy environment
Shoreline changes can occur at any time due to the influence of nature and human activities. This study demonstrates the application of UAV technology to genera
- Open Access
- 5 November 2022
- Published by Ridwan Institute in Syntax Idea
- Vol. 4 (11) , 1654-1662
Prioritas Penanganan Jalan Nasional Dengan Menggunakan Metode Ahp Dan Anp: Ruas Jalan Bts. Tapteng/Tapsel – Batang Toru – Bts. Kota Sidempuan
The government's limited budget in managing the condition of the road pavement causes the government to compile a priority ranking of the roads to be handled. Each decision maker has a different assessment for each factor or criterion that is considered in determining the path. This problem requires the same perception from decision makers in choosing road handling priorities. Priority by determining more than one criteria can be done using Multi Criteria Decision Making (MCDM) analysis such as Analytic Hierarchy Process (AHP) and Analytic Network Process (ANP). This study seeks to obtain priority handling of the Jalan Bts. Tapteng/Tapsel – Batang Toru – Bts. Sidempuan City using AHP and ANP methods. The criteria used are traffic volume, level of road damage, government policies, handling costs, and area development. The segmentation of the road segment is applied in this study into 9 sub-sections to obtain a uniform alternative length of the road. The results show that the most influential criteria in road handling using the AHP method are traffic volume (0.428), followed by policy (0.192), cost (0.187), road conditions (0.141), and area development (0.052). While in the ANP method, the criteria with the largest weight are traffic volume (0.301), followed by policies (0.196), costs (0.194), road conditions (0.174), and area development (0.134). The results of the two methods also determine the priority of different road handling roads. The results of the ANP method are expected to be a more objective priority due to the consideration of feedback on the elements and clusters themselves.
- 5 November 2022
- Published by Ridwan Institute in Syntax Idea
- Vol. 4 (11) , 1654-1662
Open AccessPrioritas Penanganan Jalan Nasional Dengan Menggunakan Metode Ahp Dan Anp: Ruas Jalan Bts. Tapteng/Tapsel – Batang Toru – Bts. Kota Sidempuan
The government's limited budget in managing the condition of the road pavement causes the government to compile a priority ranking of the roads to be handled. Each decision maker has a different assessment for each factor or criterion that is considered in determining the path. This problem requires the same perception from decision makers in choosing road handling priorities. Priority by determining more than one criteria can be done using Multi Criteria Decision Making (MCDM) analysis such as Analytic Hierarchy Process (AHP) and Analytic Network Process (ANP). This study seeks to obtain priority handling of the Jalan Bts. Tapteng/Tapsel – Batang Toru – Bts. Sidempuan City using AHP and ANP methods. The criteria used are traffic volume, level of road damage, government policies, handling costs, and area development. The segmentation of the road segment is applied in this study into 9 sub-sections to obtain a uniform alternative length of the road. The results show that the most influential criteria in road handling using the AHP method are traffic volume (0.428), followed by policy (0.192), cost (0.187), road conditions (0.141), and area development (0.052). While in the ANP method, the criteria with the largest weight are traffic volume (0.301), followed by policies (0.196), costs (0.194), road conditions (0.174), and area development (0.134). The results of the two methods also determine the priority of different road handling roads. The results of the ANP method are expected to be a more objective priority due to the consideration of feedback on the elements and clusters themselves.
- Open Access
- 1 May 2021
- Published by IOP Publishing in IOP Conference Series: Earth and Environmental Science
- Vol. 753 (1) , 012001
Renewable energy source selection for a green port with AHP
In view of the need to reduce the greenhouse gas emission causing global climate change coupled with the necessity to protect the environment around port vicinities, the green port concept receives considerable attention. This concept’s motivation is to balance environmental challenges with economic demands such that seaports improve their financial, commercial, and operational performances. In this regard, the use of renewable energy is one of the viable solutions. Based on the analytical hierarchy process (AHP) method, this paper presents a systematic approach for selecting the most suitable alternative of renewable energy sources. The results show that for the case of Kuala Tanjung Port, solar energy is the most favored alternative, followed by wind energy, biomass, and wave energy. It is hoped that this paper provides a starting point to plan for a long-term renewable energy strategy in the context of a green port.
- 1 May 2021
- Published by IOP Publishing in IOP Conference Series: Earth and Environmental Science
- Vol. 753 (1) , 012001
Open AccessRenewable energy source selection for a green port with AHP
In view of the need to reduce the greenhouse gas emission causing global climate change coupled with the necessity to protect the environment around port vicinities, the green port concept receives considerable attention. This concept’s motivation is to balance environmental challenges with economic demands such that seaports improve their financial, commercial, and operational performances. In this regard, the use of renewable energy is one of the viable solutions. Based on the analytical hierarchy process (AHP) method, this paper presents a systematic approach for selecting the most suitable alternative of renewable energy sources. The results show that for the case of Kuala Tanjung Port, solar energy is the most favored alternative, followed by wind energy, biomass, and wave energy. It is hoped that this paper provides a starting point to plan for a long-term renewable energy strategy in the context of a green port.